1. A CM's role &
False
responsibility are
governed solely by the
Own- er/CM Agreement?
2. There are two basic forms A. Both forms provide advise to the Owner on
of CM, Agency and At-Risk. constructibility, budget and schedule.
Each form provides for the
B. Both require that the liabilities and risks
basic ser- vices of CM
assumed by the
Practice. However,
there are some key differences. parties be clearly understood and stated in respective
con-
Which of the following DO tracts.
NOT apply to BOTH CM
forms? (C) Both forms allow the CM to function in an advisory
role for the entire engagement of the agreement.
D. Services can vary based on the contractual
relationship of the parties and the risks that are
assumed.
3. Construction Management had A. The need to reduce the overall time & cost
associated with
its beginnings in the early to 4. The General Services Admin-
mid 1960's. Which of the istration was the first feder-
follow- ing factors al agency to use Construction
contributed to the initial Management?
use of this delivery sys-
tem?
1/
15
, CCM EXAM PREP QUESTIONS AND ANSWERS WITH VERIFIED
SOLUTIONS!
roject delivery. The changing role of the GC and the increasing
numbers of specialty contractors.
. The increasing cost of money and unpredictable
labor demands. (D) All of the above.
True
5.
2/
15
SOLUTIONS!
1. A CM's role &
False
responsibility are
governed solely by the
Own- er/CM Agreement?
2. There are two basic forms A. Both forms provide advise to the Owner on
of CM, Agency and At-Risk. constructibility, budget and schedule.
Each form provides for the
B. Both require that the liabilities and risks
basic ser- vices of CM
assumed by the
Practice. However,
there are some key differences. parties be clearly understood and stated in respective
con-
Which of the following DO tracts.
NOT apply to BOTH CM
forms? (C) Both forms allow the CM to function in an advisory
role for the entire engagement of the agreement.
D. Services can vary based on the contractual
relationship of the parties and the risks that are
assumed.
3. Construction Management had A. The need to reduce the overall time & cost
associated with
its beginnings in the early to 4. The General Services Admin-
mid 1960's. Which of the istration was the first feder-
follow- ing factors al agency to use Construction
contributed to the initial Management?
use of this delivery sys-
tem?
1/
15
, CCM EXAM PREP QUESTIONS AND ANSWERS WITH VERIFIED
SOLUTIONS!
roject delivery. The changing role of the GC and the increasing
numbers of specialty contractors.
. The increasing cost of money and unpredictable
labor demands. (D) All of the above.
True