Shortening the project's duration by deleting unnecessary activities is called "project crashing" T or F - ANS False Which of the following statements regarding PERT analysis is true? A. The most likely time is equivalent to the expected activity time. B. Only critical activities contribute to the project variance. C. Each activity has two estimates of its duration. D. Project standard deviation is the sum of all critical activity standard deviations. E. Project variance is the sum of all activity variances. - ANS B. Only critical activities contribute to the project variance. An activity on a PERT network has these time estimates: optimistic = 2, most likely = 3, and pessimistic = 8. What is its expected activity time and variance? - ANS 3.67, 1 O=2 M=3 P=8 Duration = O + 4 x M + P Variance = ((P-O)/6)^2 2 | Page @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED Mean squared error and exponential smoothing are two measures of the overall error of a forecasting model. T or F - ANS False One use of short-range forecasts is to determine: A. facility location. B. job assignments. C. capital expenditures. D. planning for new products. E. research and development plans. - ANS B. job assignments Increasing the number of periods in a moving average will accomplish greater smoothing, but at the expense of: A. sensitivity to real changes in the data. Your answer is correct. B. stability. C. accuracy. D. manager understanding. E. All of the above are diminished when the number of periods increases. - ANS A. Sensitivity to real changes in the data A fundamental distinction between trend projection and linear regression is that: - ANS in trend projection the independent variable is time; in linear regression the independent variable need not be time, but can be any variable with explanatory power Which of the following is an example of a "hidden" production function? A. transplanting a liver B. manufacturing a televi

Show more Read less
Institution
ISDS 3115
Course
ISDS 3115









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ISDS 3115
Course
ISDS 3115

Document information

Uploaded on
September 17, 2025
Number of pages
15
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ISDS 3115 EXAM 1 QUESTIONS WITH
100% CORRECT ANSWERS | LATEST
VERSION 2025/2026.




Shortening the project's duration by deleting unnecessary activities is called "project crashing"
T or F - ANS False


Which of the following statements regarding PERT analysis is true?
A. The most likely time is equivalent to the expected activity time.
B. Only critical activities contribute to the project variance.
C. Each activity has two estimates of its duration.
D. Project standard deviation is the sum of all critical activity standard deviations.

E. Project variance is the sum of all activity variances. - ANS B. Only critical activities
contribute to the project variance.


An activity on a PERT network has these time estimates: optimistic = 2, most likely = 3, and
pessimistic = 8. What is its expected activity time and variance? - ANS 3.67, 1
O=2
M=3
P=8
Duration = O + 4 x M + P
Variance = ((P-O)/6)^2


1 | Page @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED

, Mean squared error and exponential smoothing are two measures of the overall error of a
forecasting model. T or F - ANS False


One use of short-range forecasts is to determine:
A. facility location.
B. job assignments.
C. capital expenditures.
D. planning for new products.

E. research and development plans. - ANS B. job assignments


Increasing the number of periods in a moving average will accomplish greater smoothing, but at
the expense of:
A. sensitivity to real changes in the data.
Your answer is correct.
B. stability.
C. accuracy.
D. manager understanding.

E. All of the above are diminished when the number of periods increases. - ANS A. Sensitivity
to real changes in the data


A fundamental distinction between trend projection and linear regression is that: - ANS in
trend projection the independent variable is time; in linear regression the independent variable
need not be time, but can be any variable with explanatory power


Which of the following is an example of a "hidden" production function?
A. transplanting a liver
B. manufacturing a television
C. producing a computer

D. assembling a motorcycle - ANS A. Transplanting a liver



2 | Page @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Brightstars Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
197
Member since
1 year
Number of followers
7
Documents
12560
Last sold
3 days ago
VERIFIED EXAMS AND STUDY GUIDES.

Here, you will find Study Notes, Exam answer packs 100% Guarenteed success.

3.3

31 reviews

5
10
4
4
3
8
2
3
1
6

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions