Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 17 pages
Exam (elaborations)

C-39 ROOFING TRADE EXAM VERSION 3 NEWEST 2025/2026 ACTUAL EXAM WITH COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (100% VERIFIED ANSWERS) |ALREADY GRADED A+| ||PROFESSOR VERIFIED||

Document preview thumbnail
Preview 3 out of 17 pages

C-39 ROOFING TRADE EXAM VERSION 3 NEWEST 2025/2026 ACTUAL EXAM WITH COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (100% VERIFIED ANSWERS) |ALREADY GRADED A+| ||PROFESSOR VERIFIED||

Content preview

1|Page


C-39 ROOFING TRADE EXAM VERSION 3 NEWEST 2025/2026
ACTUAL EXAM WITH COMPLETE QUESTIONS AND CORRECT
DETAILED ANSWERS (100% VERIFIED ANSWERS) |ALREADY
GRADED A+| ||PROFESSOR VERIFIED||

The maximum allowable deck deflection for a 6-ft span under a
concentrated load of 300 lb is: - ANSWER-0.30 inches



Roof deflection is important for proper roof drainage. It should be
limited to no more than ________ of the roof span. - ANSWER-
1/240



A deck span of 50 ft should deflect no more than: - ANSWER-3"



A deck span of 75 ft should deflect no more than: - ANSWER-3-
3/4"



Drains on roof surfaces should be located: - ANSWER-At points
of maximum deflection (e.g ., at midspan)

,2|Page


Expansion joints are required and should always be provided: -
ANSWER-Where steel framing, structural steel, or decking
changes direction and



Where the type of decking changes and



Where additions are connected to existing building



Maintaining a roughly level line between a drain above a rigid roof
support (e.g. a column) and a 2-1/2" midspan deflection requires
raising the other roof support: - ANSWER-5"



Area dividers for attached membrane systems are generally
required at intervals of: - ANSWER-150-200 ft



Composition base flashing should extend at least _______
(nominal) above the roof line. - ANSWER-8"



Good practice requires that _______ be placed around all roof
penetrations. - ANSWER-Curbs

, 3|Page




The upper layer of roof insulation should be installed with
_______ dimension of the insulation boards placed in a
continuous line and the end joints _______. - ANSWER-The long
... staggered



When installing preformed roof insulation over steel decks, the
second layer should be attached with: - ANSWER-Hot asphalt



Which of the following statement is correct regarding preformed
roof insulation? - ANSWER-The upper layer should have a
greater insulation value



A bituminous-membrane vapor retarder is typically installed as: -
ANSWER-A two-ply installation with three moppings of Steep
asphalt



Bituminous-membrane vapor-retarder systems are typically rated
at _______ of permeability. - ANSWER-Less than 0.005 perm

Document information

Uploaded on
September 16, 2025
Number of pages
17
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$25.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BRIGHTEDGEEXAMS
2.7
(3)
Sold
20
Followers
0
Items
1973
Last sold
3 weeks ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions