NICET LEVEL 1 HIGHWAY CONSTRUCTION 2025/2026 UPDATED EXAM ACCURATELY SOLVED

Document preview thumbnail
Preview 4 out of 64 pages

NICET LEVEL 1 HIGHWAY CONSTRUCTION 2025/2026 UPDATED EXAM ACCURATELY SOLVED

Content preview

NICET LEVEL 1 HIGHWAY CONSTRUCTION 2025/2026 UPDATED EXAM ACCURATELY
SOLVED



Acceptance

The written acceptance by the Department of the Work.




acceptance testing

Testing conducted by the Department to measure the degree of compliance to the Contract




actual cost

The computed cost using calculations provided




addendum

A Contract revision or response to a Contractor inquiry issued after advertisement and
before the opening of bids.




as-built quantity

The quantity of a completed Item eligible for payment




authorized funding amount

The amount of funds authorized by the Department for the Contract

,Bidder

The individual, firm, partnership, corporation, joint venture, or any acceptable combination
thereof that submits a bid to the Department.




bridge

. A structure, other than a culvert, including supports, erected over a depression or an
obstruction, such as water, highway, or railway, and having a track or passageway for
carrying traffic or other moving loads and having a length 3 measured along the center of
the structure of more than 20 feet between undercopings of abutments or extreme ends of
openings for multiple boxes. Structure dimensions are defined as follows:




bridge length

The overall length measured along the line of survey stationing from back to back of
backwalls of abutments, if present, otherwise end to end of the bridge floor; but, in no case
less than the total clear opening of the structure




bridge width

The clear width measured at right angles to the longitudinal centerline of the bridge
between the bottom of curbs, or in the case of multiple height of curbs, between the
bottoms of the lower risers or, if curbs are not used, between inner faces of parapet or
railing




Change Order.

,A written order issued by the Department to the Contractor after execution of the Contract
authorizing one or more of the following: 1. Changes in the Work. 2. Modifications in the
basis of payment. 3. Modifications to Contract Time.




Commercially Useful Function

Occurrences in which the subcontractor is responsible for the execution of a distinct
element of the work of a contract and carrying out its responsibilities by actually
performing, managing, and supervising the work involved, and with respect to materials
and supplies used on the contract, prepares the estimate, negotiates price, determines
quality and quantity, orders the material, arranges delivery, installs (where applicable), and
pays for the material and supplies itself for the project.




Completion

When all of the following have occurred: 1. The Work has been satisfactorily completed in
all respects according to the Contract. 2. The Project is ready for use by the Department as
required by the Contract. 3. The Contractor has satisfactorily executed and delivered to the
RE all documents, certificates, and proofs of compliance required by the Contract
including the Notice of Completion.




construction operations

Physical work done in the performance of the Contract within the Project Limits. Does not
include off-site mobilization, procurement and off-site storage of materials and plants,
engineering, performance bond and payment bond, surveys, working drawings, off-site
field offices, schedules, certificates, forms, or documents




Contract

, The written integrated agreement between the Department and the Contractor setting forth
the obligations of the parties, including, but not limited to, the performance of the Work
and the basis of payment. It includes the advertisement, Proposal, Certification as to
Publication and Notice of Advertisement for Proposal, bid, Appointment of Agent by
Nonresident Contractors, Resolution of Award of Contract, Executed Form of Contract,
performance and payment bonds, Specifications, Plans, Right-of-Way Plans, permits,
boring logs, pavement core records, addenda, Change Orders, and Field Orders, all of
which are to be treated as one instrument whether or not set forth at length in the form of it.




Contract Time

The number of working days allowed to complete the work for a milestone or the date by
which work must be completed, as provided in the Contract and as modified by Change
Order.




Contractor

The individual, firm, partnership, corporation, joint venture, or any acceptable combination
thereof contracting with the Department for performance of the Contract. For the purpose
of carrying out the Contract, it also means the Contractor's representative.




day.

Every day shown on the calendar



Federal Aid Project Attachments

Attachments to the Contract Special Provision document, used for Federal Aid Projects.

Document information

Uploaded on
September 16, 2025
Number of pages
64
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$20.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Edumax
4.0
(8)
Sold
59
Followers
5
Items
1436
Last sold
1 week ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions