Complete Real Exam Questions with 100% Correct Answers |
Verified Solutions | Already Graded A+ / 2025 Brand New
Exam!!
How frequently must a VSMP authority inspect a construction
site? – ANSWER-Periodically
1. Compliance with approved ESC plan
2. Compliance with approved SWM plan
3. Development, updating, and implementation of a pollution
prevention plan. 4. Development and implementation of any
additional control measures necessary to address a TMDL.
What are the two locations where the notice of coverage letter
must be posted?
- ANSWER-1. Near the main entrance of
construction activity
2.In the general information section
of SWPPP
What two options does the operator have for making the
SWPPP available to the public? - ANSWER-1. Electronic format
2. Hard copy- public access may be arranged upon request at a
time and at publicly accessible location convenient to the
operator.
,What must be included in the SWPPP as general information? -
ANSWER-1.
Signed copy of the registration statement (if required)
2. Copy of the notice of coverage letter
3. Copy of the Construction GP
4. Narrative description of the nature of the construction
activity, including the function of the project (e.g., low density
residential, shopping mall, highway, etc.)
5. Legible site plan
What is the qualified personnel's inspection frequency for areas
that have been
temporary stabilized? - ANSWER-Once
per month
If qualified personnel discover an erosion and sediment control
practice that was not properly installed, how long do they have
to fix it? - ANSWER-As soon as practicable but no later than
seven days after discovery or a longer period as approved by
the VSMP authority.
The operator must note all modifications or updates in the
SWSPPP, including a
record of which three dates? - ANSWER-1. Major
grading activities
, 2. Construction activities temporarily or permanently cease on
a portion of the
site.
3. Stabilization measures are
initiated.
When must temporary stabilization be applied to bare areas
that may not be at
final grade but will remain dormant for longer than 14
days? - ANSWER-
Temporary stabilization must be applied within
seven days.
When must permanent or temporary sol stabilization be applied
to bare areas that are at final grade? - ANSWER-Permanent or
temporary soil stabilization must be applied to bare areas
within 7 days after final grade is reached on any portion of the
site.
What are the three requirement for concrete wash water? -
ANSWER-1. Concrete wash water must be directed into a leak
proof container or a leak proof settling basin.
2. Container or basin cannot overflow
3. Hardened and liquid concrete waste must be removed and
properly disposed.