DBIA EXAM 2 STUDY GUIDE PRACTICE QUESTIONS AND CORRECT ANSWERS 100% VERIFIED. _____ _____ is the belief that there is a technique, method or process that is more effective at delivering a particular outcome than any other Best Practice A Best Practice is the belief that there is a ______ , _____ or _____ that is more effective at delivering a particular outcome than any other. - technique - method - process How many best practices are there? 10 What are the 3 areas that the implementing techniques are categorized into? 1. Procurement 2. Contracting 3. Execution Who leads the overall design effort or design and engineering of a specific discipline? a) Integrated Project Leader b) Designer of Record c) Design Manager d) Estimator b) Designer of Record Who facilitates "Marriage" between design professionals and cost estimators? a) Integrated Project Leader b) Designer of Record c) Design Manager d) Estimator c) Design Manager Who advocates for design excellence within the DB team? a) Integrated Project Leader b) Designer of Record c) Design Manager d) Estimator c) Design Manager Who manages design information flow & deliverables? a) Integrated Project Leader b) Designer of Record c) Design Manager d) Estimator c) Design Manager Who manages design performance interface? a) Integrated Project Leader b) Designer of Record c) Design Manager d) Estimator b) Designer of Record The Integrated Project Leader is a traditional hard-bid project manager. True or False? False Who has to perform their design services within a common "Standard of Care"? a) Integrated Project Leader b) Designer of Record c) Design Manager d) Estimator b) Designer of Record Who are considered to be "trained creative problem solvers"? a) Integrated Project Leader b) Designer of Record c) Design Manager d) Estimator b) Designer of Record Who sustains a collaborative environment among people with diverse roles, backgrounds, and opinions? a) Integrated Project Leader b) Designer of Record c) Design Manager d) Estimator c) Design Manager Who monitors design-to-budget process? a) Integrated Project Leader b) Designer of Record c) Design Manager d) Estimator c) Design Manager Who facilitates constructability reviews? a) Integrated Project Leader b) Designer of Record c) Design Manager d) Estimator c) Design Manager

Content preview

DBIA EXAM 2 STUDY GUIDE PRACTICE QUESTIONS AND CORRECT ANSWERS
100% VERIFIED.


_____ _____ is the belief that there is a technique, method or process that is more
effective at delivering a particular outcome than any other
Best Practice

A Best Practice is the belief that there is a ______ , _____ or _____ that is more
effective at delivering a particular outcome than any other.
- technique
- method
- process

How many best practices are there?
10

What are the 3 areas that the implementing techniques are categorized into?
1. Procurement
2. Contracting
3. Execution

Who leads the overall design effort or design and engineering of a specific
discipline?

a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator
b) Designer of Record

Who facilitates "Marriage" between design professionals and cost estimators?

a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator
c) Design Manager

Who advocates for design excellence within the DB team?

a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator
c) Design Manager

, Who manages design information flow & deliverables?

a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator
c) Design Manager

Who manages design performance interface?

a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator
b) Designer of Record

The Integrated Project Leader is a traditional hard-bid project manager.

True or False?
False

Who has to perform their design services within a common "Standard of Care"?

a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator
b) Designer of Record

Who are considered to be "trained creative problem solvers"?

a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator
b) Designer of Record

Who sustains a collaborative environment among people with diverse roles,
backgrounds, and opinions?

a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator
c) Design Manager

Document information

Uploaded on
September 11, 2025
Number of pages
14
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.39

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
NurseQueen1
4.7
(3)
Sold
4
Followers
0
Items
196
Last sold
8 months ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions