100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

HIC virginia 2024 Exam Questions with correct Answers

Rating
-
Sold
-
Pages
4
Grade
A+
Uploaded on
07-09-2025
Written in
2025/2026

HIC virginia 2024 Exam Questions with correct Answers

Institution
HIC Virginia
Course
HIC virginia








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
HIC virginia
Course
HIC virginia

Document information

Uploaded on
September 7, 2025
Number of pages
4
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

HIC virginia 2024 Exam Questions with correct
Answers
What is directly affected by the surface and subsurface conditions of the building site? -
✔✔Foundations - While the type and size of a structure will partly determine the type of
foundation, the foundation itself is very much affected by the surface and subsurface conditions
of the building site.

What term is used to describe the act of removing air pockets from setting concrete? -
✔✔Vibrating Concrete - Consolidation is a process that removes air pockets and forces the
concrete into all parts of the forms.

Which of the following is not a part of a masonry arch? - ✔✔Radius

Anchor bolts should be spaced no more than __' apart and no more than __" from the ends of any
plate section or wall corner. Each bolt must extend at least __" into the concrete. - ✔✔6, 12, 7

In Southern Coastal areas, where should the vapor barrier be placed? - ✔✔The exterior of the
wall.

If butt joints occur when applying gypsum panels to wood and steel framing stagger and locate
them as far from the ___ of walls and ceilings as possible. - ✔✔Center

A minimum temperature of ___ should be maintained during gypsum board application. -
✔✔50°F

What is the maximum allowable span for cold-formed steel joists size 800S162-43 loaded with a
live load of 40 PSF and spaced 16 inches OC? - ✔✔13′-5″

What is the recommended spacing at all panel edge and end joints when positioning plywood
subfloor? - ✔✔1/8"

Which of the following is NOT a purpose of wall sheathing? - ✔✔It helps distribute structural
loads that do not fall directly over studs.

What is the minimum clearance between the stopping point of a built-up girder and the masonry
pocket? - ✔✔1/2"

A deck attached to the back of a house is framed with southern pine 2x10s. The joists are 16
inches OC. What is the maximum allowable clear span for the joists supporting this deck? -
✔✔14 feet 0 inches

Openings which provide access to all under-floor spaces through a perimeter wall shall be not
less than inches. - ✔✔16 X 24
$9.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
Legitsolutionsstuvia

Get to know the seller

Seller avatar
Legitsolutionsstuvia Liberty University
View profile
Follow You need to be logged in order to follow users or courses
Sold
0
Member since
3 months
Number of followers
0
Documents
92
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions