100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CDT exam Questions with Correct Answers (solved) verified questions and correct answers latest already graded a+

Rating
-
Sold
-
Pages
22
Grade
A+
Uploaded on
05-09-2025
Written in
2025/2026

CDT exam Questions with Correct Answers (solved) verified questions and correct answers latest already graded a+ CDT exam Questions with Correct Answers (solved) verified questions and correct answers latest already graded a+ CDT exam Questions with Correct Answers (solved) verified questions and correct answers latest already graded a+ CDT exam Questions with Correct Answers (solved) verified questions and correct answers latest already graded a+ CDT exam Questions with Correct Answers (solved) verified questions and correct answers latest already graded a+

Show more Read less
Institution
CDT
Course
CDT










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CDT
Course
CDT

Document information

Uploaded on
September 5, 2025
Number of pages
22
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CDT Exam Questions With Correct
nn nn nn nn nn




Answers (Solved) Verified Questions And
nn nn nn nn




Correct Answers 2025-2026 Latest
nn nn nn nn




Already Graded A+nn nn nn

nn
nn

1. nnThe nnmethod nnof nncomputation nnof nnContractor's nnoverhead nnand nnprofits nnfor
nnChange nnOrder nn
nn
prices, nnwhere nnboth nnadditions nnand nndeletions nnare nninvolved, nnis
nnfound nnin nnthe:
nn
a)
nnAgreement.
nn
b) nnConditions nnof nnthe
nnContract.
nn
c) nnDivision

nn01.
nn
d) nnInstructions nnto nnBidders. nn- nnCORRECT nnANSWER-b) nnConditions nnof nnthe
nnContract.
nn
nn
2. nnGeneral nnRequirements nnare
nnpart nnof:
nn
a) nnSupplementary

nnConditions.
nn
b) nnBidding

nnRequirements.
nn
c)
nnSpecifications.


d) nnSummary nnof nnWork. nn- nnCORRECT nn ANSWER-c)
nnSpecifications.
nn

3. nnThe nnthree nnessential nnconsiderations nnin nnthe nnevaluation nnof nna nnproduct nnare: nn
a) Requirements, nnCriteria, nnand nnTests. nn
b) Costs, nnMaintenance, nnand nnInstallation. nn
c) Life nnCycle nnCost, nnInstallation nnCost, nnand nnMaintenance nnCost. nn
d) Case nnstudies, nnFailures, nnand nnProblems. nn- nnCORRECT nnANSWER-a)
nnRequirements, nnCriteria, nnand nnTests. nn
nn
nn
4. nnWhose nnresponsibility nnis nnit nnto nnfurnish nnthe nnShop
nnDrawings?
nn
a) nnThe

nnArchitect/Engineer

, nn
b) nnThe

nnContractor
nn
c) nnThe

nnOwner


d) nnThe nnSubcontractor nn - nn CORRECT nn ANSWER-b) nn The
nnContractor
nn

5. nnThe nndivision nnof nnthe nnWork nnamong nnmultiple nnprime nnContracts nnis
nndescribed nnin:
nn
a) nnInstructions nnto

nnBidders.
nn
b) nnSupplementary

nnConditions.
nn
c) nnDivision
nn01.
nn
d) nnSpecial nnConditions. nn- nnCORRECT nnANSWER-c)
nnDivision nn01.
nn

6. nnDuring nnthe nnProject nnConception nnStage, nnthe nnA/E nnmay nnbe nnretained nnto: nn
a) Develop nnoutline nnspecifications nn
b) Describe nnthe nncharacter nnof nnthe nnmechanical nnsystem nn
c) Prepare nnrenderings nn
d) Assist nnin nnfinancial nnfeasibility nnstudies nn- nnCORRECT nnANSWER-d) nnAssist nnin
nnfinancial nnfeasibility nnstudies nn
nn

7. nnWhat nnis nnthe nnmain nnpurpose nnof nnMasterFormat? nn
a) for nnscheduling, nnvalue nnmanagement, nnrecording nnof nndesign nndata nnand nnmanaging
nncosts. nn

b) used nnduring nnthe nnplanning nnstage nnof nna nnproject. nn
c) to nnorganize nnthe nnProject nnManual, nnreference nnkeynotes nnand nndetailed nncost
nnestimates. nn

d) when nnthere nnis nna nnstandardized nnneed nnfor nninformation nnto nnappear nnupon nneach
nnpage nnof nna nnproject nnmanual. nn- nnCORRECT nnANSWER-c) nnto nnorganize nnthe

nnProject nnManual, nnreference nnkeynotes nnand nndetailed nncost nnestimates. nn
nn

8. nnThe nnperson nnwho nnbecomes nnsecondarily nnliable nnfor nnanother's nndebt nnor
nnperformance nnis nncalled nnthe: nn

a) Guarantee nn
b) Warrantor nn
c) Guarantor nn
d) Warrantee nn- nnCORRECT nnANSWER-c) nnGuarantor nn
nn

9. nnIntegrated nnprojects nnare nndistinguished nnby nnall nnof nnthe nnfollowing nncharacteristics
nnexcept: nn

, a) Development nnof nnvirtual nnproject nnmodel nnthrough nninput nnfrom nna nncollaborative
nnteam nn

b) Trust-based nncollaboration nnbetween nnproject nnteam nnmembers nn
c) Maximized nnefficiency nnthrough nndesign, nnfabrication, nnand nnconstruction nn
d) "Just nnas nnneeded" nnteam nninvolvement nnto nnreduce nnowner's nnpre-construction
nnexpenses nn- nnCORRECT nnANSWER-d) nn"Just nnas nnneeded" nnteam nninvolvement nnto

nnreduce nnowner's nnpreconstruction nnexpenses nn
nn
nn
10. nnOutline nnSpecifications nnare nnwritten
nnfor
nn
a) nnonly nnDivisions nn02-14 nnwhere nnactual nnproducts nnare
nndiscussed
nn

nn
b) nnDivisions nn01-
49
c) nnonly nnDivisions nn01-14 nn(excluding nnmechanical nnand
nnelectrical)


d) nnthe nnexclusive nnuse nnof nnthe nnA/E nn- nnCORRECT nnANSWER-b)
nnDivisions nn01-49
nn

11. nnAn nnexample nnof nna nnMasterFormat nnLevel nn3 nnspecification nnSection nnis: nn
a) 05 nn00 nn00 nnMetals. nn
b) 05 nn20 nn00 nnMetal nnJoists. nn
c) 05 nn21 nn00 nnSteel nnJoist nnFraming. nn
d) 05 nn21 nn19 nnOpen nnWeb nnSteel nnJoist nnFraming. nn- nnCORRECT nnANSWER-d) nn05 nn21
nn19 nnOpen nnWeb nnSteel nnJoist nnFraming. nn
nn

12. nnWhat nnactivities nntake nnplace nnin nnthe nnProject nnConception nnStage? nn
a) The nnengineers nndevelop nnthe nnmechanical nnand nnelectrical nnsystems. nn
b) The nnsite nnis nnselected nnand nnthe nndemolition nnis nndone. nn
c) Feasibility nnstudies nnand nnbudget nnis nnset. nn
d) The nnprogram nnis nnevaluated nnand nnthe nnengineers nnare nnselected. nn- nnCORRECT
nnANSWER-c) nnFeasibility nnstudies nnand nnbudget nnis nnset. nn
nn

13. nnThe nndocument nnrecommended nnto nnorganize nnpreliminary nn construction
nninformation nninto nna nn
nn
standard nnorder nnon nnthe nnbasis nnof nnsystems nnand
nnassemblies nnis:
nn
a)
nnMasterFormat
nn
b)
nnUniformat
nn
c) nnOutline

nnSpecifications


d) nnProject nnManual nn- nnCORRECT nnANSWER-b)
nnUniformat

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ACADEMICSUCCESS stuvia
View profile
Follow You need to be logged in order to follow users or courses
Sold
44
Member since
9 months
Number of followers
3
Documents
5076
Last sold
1 week ago
STUDY HUB

WELCOME TO MY STUDY HUB ! I CREAT CLEAR CONCISE, AND EXAM-FOCUSED NOTES DESIGNED TO SAVE YOUR TIME AND BOOST YOUR GRADES .EVERY DOCUMENT IS CRAFTED FROM VERIFIED COURSE MATERIALS , STRUCTURED FOR EASY UNDERSTANDING, AND OPTIMIZED FOR QUICK REVISION . IF YOU WANT RELIABLE ,HIGH QUALITY RESOURCES THAT ACTUALLY HELP YOU SCORE HIGHER , YOU'RE IN THE RIGHT PLACE !"

4.3

24 reviews

5
18
4
2
3
0
2
1
1
3

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions