CORRECT QUESTIONS AND ANSWERS 2025-2026
A notice of termination can be filed when? - correct answer- All
construction activity, inside and outside of the building is complete.
Permanent stabilization has been verified.
A SWPPP site map will show all of the following? - correct answer-
Location of BMP's, Phasing & Sequence, Limits of Disturbance
Common types of erosion include? - correct answer- Gully, Sheet,
and Rill
Discharge From Contaminated Ground Water - correct answer-
Never an allowable discharge from a construction site
NPDES - correct answer- Requirements for managing storm water
activity on a construction site are outlined in the following regulation
NPDES (National Pollutant Discharge Elimination System) - correct
answer- Requirements for managing storm water activity on a
construction site are outlined in the following regulation?