NERC RC NEW VERSION FULL EXAM WITH VERIFIED ANSWERS GRADED A+ -
TIMES/PERCENTAGES/VALUES
Multiple contingencies within how many minutes of each other are reported as a single
contingency
1 minute
MW reportable threshold for sudden loss of gen
2000mw
Ace calculation occurs how often
6 seconds
When EEA3 is terminated, the EDE should submit a report to the RC how soon after
termination/downgrading
2 business days
How often is ATC for next 31 days calculated
24 hours/daily
When a reportable threshold has been met, the responsible entity has how long to report
24 hours/next business day
,GOP with blackstart resource must notify TOP of any change to capabilities affecting ability
to meet restoration plan within how long of the change
24 hours
RC/BA/TOP should test primary control center data exchange capabilities for redundant
functionality at least how often
90 calendar days
TOP should update and submit the restoration plan to the RC within how long after
identifying unplanned permanent system modifications
90 calendar days
Changes to Operating plan with regards to backup facility should be updated/approved
within how many days of the change
60 calendar days
TOP must provide copy of voltage schedule to RC or neighboring TOP's within how long of a
request
30 calendar days
, TOP must provide criteria used to develop voltage schedule or reactive power schedule to
an inquiring GOP within how long of the request
30 calendar days
GO should provide tap settings/ranges and impedance data to TOP & transmission planner
within how long of a request
30 calendar days
When BA/TOP submits Emergency Operating plan to RC, the RC has how long to review and
notify of results
30 calendar days
RC has how long to approve/dissapprove TOP restoration plan
30 calendar days
GOP should provide blackstart test results to RC/TOP within how long of request
30 calendar days
RC should distribute revised restoration plans to each TOP & neighboring RC within how
many days of revision/creation
30 calendar days
TIMES/PERCENTAGES/VALUES
Multiple contingencies within how many minutes of each other are reported as a single
contingency
1 minute
MW reportable threshold for sudden loss of gen
2000mw
Ace calculation occurs how often
6 seconds
When EEA3 is terminated, the EDE should submit a report to the RC how soon after
termination/downgrading
2 business days
How often is ATC for next 31 days calculated
24 hours/daily
When a reportable threshold has been met, the responsible entity has how long to report
24 hours/next business day
,GOP with blackstart resource must notify TOP of any change to capabilities affecting ability
to meet restoration plan within how long of the change
24 hours
RC/BA/TOP should test primary control center data exchange capabilities for redundant
functionality at least how often
90 calendar days
TOP should update and submit the restoration plan to the RC within how long after
identifying unplanned permanent system modifications
90 calendar days
Changes to Operating plan with regards to backup facility should be updated/approved
within how many days of the change
60 calendar days
TOP must provide copy of voltage schedule to RC or neighboring TOP's within how long of a
request
30 calendar days
, TOP must provide criteria used to develop voltage schedule or reactive power schedule to
an inquiring GOP within how long of the request
30 calendar days
GO should provide tap settings/ranges and impedance data to TOP & transmission planner
within how long of a request
30 calendar days
When BA/TOP submits Emergency Operating plan to RC, the RC has how long to review and
notify of results
30 calendar days
RC has how long to approve/dissapprove TOP restoration plan
30 calendar days
GOP should provide blackstart test results to RC/TOP within how long of request
30 calendar days
RC should distribute revised restoration plans to each TOP & neighboring RC within how
many days of revision/creation
30 calendar days