NERC FULL ACTUAL EXAM CURRENTLY TESTING QUESTIONS -VERIFIED WITH COMPLETE & ACCURATE ANSWERS ALREADY GRADED A+

Document preview thumbnail
Preview 4 out of 93 pages

NERC FULL ACTUAL EXAM CURRENTLY TESTING QUESTIONS -VERIFIED WITH COMPLETE & ACCURATE ANSWERS ALREADY GRADED A+

Content preview

NERC FULL ACTUAL EXAM CURRENTLY TESTING QUESTIONS -VERIFIED WITH
COMPLETE & ACCURATE ANSWERS ALREADY GRADED A+



A transmission line is operating with a voltage phase angle different of 30 degrees between
the sending Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the
voltage phase angle difference will be?

The phase angle will increase. When load is increased phase angle will increase.




A load has a power factor of 0.9 lagging. If the load draws 100 MVA, what is the MW draw?

90 pf= mw/mva




The high side of a delta-wye connection transformer is connected to a power system with
199 kV L-G high side voltage. What is the voltage across the delta winding of the
transformer?

Vl-l= square root of 3 times Vl-g 1.73x191= 345kV




If a transmission line is carrying 400 MW and 300 MVAR what is the MVA?

3-4-5 triangle 500 MVA




The prime mover is the component of the generator that creates the rotational force. In a
typical coal fired steam generator what component spins the rotor?

Turbine

,Reactive reserve response during a disturbance is best obtained from which devise?

Synchronous condensers




For two identically constructed transmission lines where Line A is 150 miles long and line B
is 15 miles long, if both lines are lightly loaded?

A produces more reactive power than B.




Lightly loaded transmission lines essentially behave like?

Shunt Capacitors




You receive an alarm that indicates low oil pressure on an underground transmission cable.
SCADA shows the pressure is continuing to drop. What is the first step you take to protect
the line?

Isolate the line




Computer simulations show that for a 100 MW schedule from Bus A to Bus B, 63% of the
schedule will flow on the scheduled path and the remainder will flow on other parallel
paths. What is the distribution factor for the scheduled path?

63%




Which statement best describes how reactive power MVAR power normally flows?

High Voltage to Low Voltage

,Which of the following types of data are BA and RC not required to share with one another?

Generator start up cost




TOP must develop, maintain, and implement formal policies and procedures to provide for
transmission reliability. Which of the following DOES NOT need to be addressed in these
policies and procedures?

Planned outages of generation units




A 1000 MVA rated generator that produces 800 MW and 100 MVAR is best described as?

Operating in a lagging mode. Inductive system




Which of the following types of MW load is the most impacted by an intentional frequency
reduction?

Motor




Assume there are two 250 mile long transmission lines exporting an excessive amount of
MW from a generation area to a load area. One of the lines suddenly trips and the area
power system collapses within a few seconds. The most likely cause of the collapse?

Angle Instability

, The phase voltage in a wye-connected load is 277 V. What is the line to line voltage?

480 V




A simple power system is composed of three lines connecting generation to load. Each
lines the same impedance, is initially loaded at 200 MW, and has a thermal limit of 400 MW.
If one line trips, what the loading on the shortest remaining line be and will the thermal limit
either remaining line be violated?

300 MW and No




The best prediction of system load is the load forecast tool that uses?

Forecasted Weather




If the phase angel at an open breaker is equal to 1/10 of a cycle, this is the the same angle
as?

1/10 of 360 so 36




A ___________ tool is used to ensure the power system can respond within acceptable
limits of N-1

Contingency Analysis




Which of the following activities would not be included in the procedures for transmission
reliability?

Ancillary service pricing

Document information

Uploaded on
September 4, 2025
Number of pages
93
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$21.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Edumax
4.0
(8)
Sold
59
Followers
5
Items
1436
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions