Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 10 pages
Exam (elaborations)

PPD Practice Exam -2 With Correct Solutions,2025

Document preview thumbnail
Preview 2 out of 10 pages

PPD Practice Exam -2 With Correct Solutions,2025

Content preview

PPD Practice Exam #2 With Correct
Solutions,2025.




What is the maximum vertical travel distance of a hydraulic elevator. - CORRECT ANSWER✔✔70'
j j j j j j j j j j j j j




In the programming phase, the project team is calculating the usable area of a project based on interior layout efficiency. The rentable area
j j j j j j j j j j j j j j j j j j j j j j




is 60,000 square feet. The owner wants a 75% layout efficiency.
j j j j j j j j j j j




What is the interior usable area in square feet? - CORRECT ANSWER✔✔60,000 net area / 0.75 layout efficiency = 80,000 gross area
j j j j j j j j j j j j j j j j j j j j j




In the programming phase, the project team is calculating the usable area of a project based on interior layout efficiency. The rentable area
j j j j j j j j j j j j j j j j j j j j j j




is 60,000 square feet. The owner wants a 75% layout efficiency.
j j j j j j j j j j j




What is the interior usable area in square feet? - CORRECT ANSWER✔✔60,000 net area / 0.75 layout efficiency = 80,000 gross area
j j j j j j j j j j j j j j j j j j j j j




An architect is designing a passive solar building which will take advantage of an adjacent south-facing slope. The slope will have a
j j j j j j j j j j j j j j j j j j j j j




specially designed collector where air will be warmed by the sun and then rise to serve as the heat for the building. Cooler air will
j j j j j j j j j j j j j j j j j j j j j j j j j




simultaneously be pulled from a chamber below the floor, creating a convection loop.
j j j j j j j j j j j j j




How is this type of passive solar system identified? - CORRECT ANSWER✔✔Isolated gain systems collect and store solar radiation
j j j j j j j j j j j j j j j j j j




away from the space to be heated
j j j j j j j




Sunspace - CORRECT ANSWER✔✔separated from the main living space by a thermal storage wall.
j j j j j j j j j j j j j




Direct gain - CORRECT ANSWER✔✔Direct gain systems collect heat directly within an interior space.
j j j j j j j j j j j j j




Indirect gain - CORRECT ANSWER✔✔Indirect gain systems control heat gain at the exterior skin of a building, utilizing a Trombe
j j j j j j j j j j j j j j j j j j j




wall or a drumwall of water-filled barrels or tubes.
j j j j j j j j j




An architect is performing code analysis for a new building that will be located in the densely populated business district of a large urban
j j j j j j j j j j j j j j j j j j j j j j j




area.
j




Where should the architect look to find the regulations on building heights and setbacks? - CORRECT ANSWER✔✔Zoning ordinance
j j j j j j j j j j j j j j j j j




An architect is hired to prepare plans for the treatment of an existing historic structure. The client would like the project to have the highest
j j j j j j j j j j j j j j j j j j j j j j j j




level of historic accuracy.
j j j j




Which treatment option should the architect recommend? - CORRECT ANSWER✔✔Preservation is defined as the act or process of
j j j j j j j j j j j j j j j j j




applying measures necessary to sustain the existing form, integrity, and materials of a historic property. Work, including preliminary
j j j j j j j j j j j j j j j j j j




measures to protect and stabilize the property, generally focuses upon the ongoing maintenance and repair of historic materials and
j j j j j j j j j j j j j j j j j j j




features, rather than extensive replacement and new construction.
j j j j j j j j




A homeowner has recently installed a new pool, and they have asked the architect to design a small covered open-air pavilion next to the
j j j j j j j j j j j j j j j j j j j j j j j

, pool for guest entertainment and cooking.
j j j j j j




What must the architect include in the design? - CORRECT ANSWER✔✔All electrical outlets prone to wetness need to have ground
j j j j j j j j j j j j j j j j j j j




fault interrupters.
j j




Which of the following exemplify the purpose of zoning? Check the four that apply. - CORRECT ANSWER✔✔Protect local residents
j j j j j j j j j j j j j j j j j j




from undesirable types of business, Protect the amount of open space for local residents, Protect the access to direct sunlight and fresh air,
j j j j j j j j j j j j j j j j j j j j j j j




Ensure incompatible types of building uses do not disturb residents
j j j j j j j j j j




The soil survey determines the proposed building location is not suitable for construction.
j j j j j j j j j j j j




Which soil condition is most likely to have been discovered at the building site? - CORRECT ANSWER✔✔Highly organic soils are rich
j j j j j j j j j j j j j j j j j j j j




in organic matter and undecomposed plant material. The composition of these soils provides very little strength and makes them high
j j j j j j j j j j j j j j j j j j j j




compressible, making them not suitable for construction.
j j j j j j j




An architect is researching methods to protect fasteners from corrosion.
j j j j j j j j j




Which of the following types of metal fasteners would provide the best cathodic protection? - CORRECT ANSWER✔✔Stainless steel
j j j j j j j j j j j j j j j j j




is the most cathodic of these options, and it is made so by adding chromium directly to molten steel.
j j j j j j j j j j j j j j j j j j j




A historic inn has recently been vandalized. A few of the original historic window panes were broken. The owner has since repaired the
j j j j j j j j j j j j j j j j j j j j j j




damage, but is considering further alterations to secure the property against future incidents.
j j j j j j j j j j j j j




According to the Department of the Interior's historic preservation standards, which of the following options represents the most sensitive
j j j j j j j j j j j j j j j j j j




option to achieve the stated objective while maintaining the historic character of the inn? - CORRECT ANSWER✔✔impact-resistant
j j j j j j j j j j j j j j j j j




windows will provide stronger resistance to vandalism, and a faithful representation will maintain the historic character in accordance
j j j j j j j j j j j j j j j j j j




with the guidelines.
j j j




After bidding a project for a new office tower, the design team discovers the project is over budget. To reduce costs, the project architect
j j j j j j j j j j j j j j j j j j j j j j j




decides to engage the team in a value engineering exercise.
j j j j j j j j j j




Which of the following strategies can assist in the process of value engineering? - CORRECT ANSWER✔✔Creating mock-ups of
j j j j j j j j j j j j j j j j j




systems and assemblies can help open the door to innovative design discussions and solutions. Mock-ups offer the design team a chance to
j j j j j j j j j j j j j j j j j j j j j j




interact with and better understand a system or assembly. By better understanding the item, the design team can then search for cheaper
j j j j j j j j j j j j j j j j j j j j j j




solutions to achieve the same or similar results.
j j j j j j j j




The architect is reviewing a current geotechnical report for the site of a newly proposed shopping mall in a seismically active site. The
j j j j j j j j j j j j j j j j j j j j j j




boring report lists from top to bottom: 6 inches of topsoil, 6 feet of fine sand and clay, 4 feet of clayey sand, 5 feet of dense sand and silt, 5
j j j j j j j j j j j j j j j j j j j j j j j j j j j j j j j




feet of stiff clay, and 10 feet of coarse gravel. The preliminary structural analysis indicates a foundation pressure requirement of roughly
j j j j j j j j j j j j j j j j j j j j j




2,000 psi, and the structural engineer has proposed a deep foundation system using piles.
j j j j j j j j j j j j j j




Based on the proposed building type, where should the ends of the building's piles be located? - CORRECT ANSWER✔✔Extend to the
j j j j j j j j j j j j j j j j j j j j




layer of coarse gravel
j j j j




An architect is planning a new rural residence in a temperate climate on a predominantly flat site. The prevailing winds come from the east.
j j j j j j j j j j j j j j j j j j j j j j j




Due to the size of the property, the owner has requested a retention pond to collect stormwater runoff.
j j j j j j j j j j j j j j j j j j




Where should the architect position the retention pond relative to the house, if they wish to aid in naturally cooling the house during the
j j j j j j j j j j j j j j j j j j j j j j j




summer? - CORRECT ANSWER✔✔The prevailing winds come from the east, which means that positioning the pond to the east of the
j j j j j j j j j j j j j j j j j j j j j




house will allow the cooler surface temperatures of the pond to be carried toward the residence.
j j j j j j j j j j j j j j j j




The architect is finishing their code research by reviewing the local energy code. In their state, that code is the 2015 International Energy
j j j j j j j j j j j j j j j j j j j j j j




Conservation Code. In order to specify all of the insulation and fenstration values the architect will need to know which of the following 4
j j j j j j j j j j j j j j j j j j j j j j j j




pieces of information?
j j j




Use the image below to select the item with the four pieces of information that will determine the insulation and fenestration values. -
j j j j j j j j j j j j j j j j j j j j j j




CORRECT ANSWER✔✔Commercial/Residential Classification, Climate Zone, State, County
j j j j j j j




An architect is designing a super-insulated, energy-efficient home in Alaska that utilizes winter passive solar heating through triple-pane
j j j j j j j j j j j j j j j j j




windows and implements shading strategies to eliminate unwanted heat gain in the spring, summer, and fall.
j j j j j j j j j j j j j j j j




Which of the following is the best option for the solar heat gain coefficient of the insulated glass units at the south-facing windows? -
j j j j j j j j j j j j j j j j j j j j j j j




CORRECT ANSWER✔✔The extreme cold climate of Alaska has a long and demanding heating season and typically no summer
j j j j j j j j j j j j j j j j j j




cooling demand. The solar heat gain coefficient should be the highest available for triple-pane units, which is approximately 0.55. This
j j j j j j j j j j j j j j j j j j j j




allows the window unit to fully utilize winter passive solar heating.
j j j j j j j j j j j

Document information

Uploaded on
September 2, 2025
Number of pages
10
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Smartscroll
4.3
(6)
Sold
19
Followers
4
Items
2925
Last sold
2 weeks ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions