A machine operating with vibration above the safe limits should
be immediately reported to the:
a. Supervisor
b. Safety committee
c. Workers, Compensation Board
d. Manufacturer
e. Plant manager. - correct answer -a
Safety valves mounted on steam boilers may be gagged:
a. During hydrostatic test
b. When greater pressure than the valve set pressure is required
for production
c. When valve spring breaks and the boiler is not scheduled for a
maintenance shut down for ten months
d. Only when the valve is leaking a significant amount of steam
e. Not for any of the above reasons. - correct answer -a
, Page | 2
Foundations for machinery are required to:
a. Increase kilowatt output of prime movers
b. Compensate for misalignment between prime mover and driven
machine
c. Transfer vibration from prime mover to driven machine
d. Absorb vibration
e. Allow for easy replacement of flex couplings. - correct answer -
d
Before entering the mud drum of a water tube boiler for an
internal inspection, when other boilers in the plant are operating,
you should:
1. Make sure the boiler is full of water
2. Blank off or disconnect the blow off lines
3. Blank off or disconnect or close the steam header and non
return valve, with the drain between the valves open and showing
no signs of the line being pressurized
4. Blank off or disconnect the feed water line
a. 1, 2, 3
b. 1, 3, 4
c. 2, 3, 4
d. 1, 2, 4
e. 1, 2, 3, 4. - correct answer -c
, Page | 3
Safety can be promoted and willingly adhered to by a combination
of the following actions.
1. Having, employees attend and participate in safety meetings
2. Keeping safety posters placed throughout the plant
3. Management and supervisors setting a good example
4. Imposing stiff fines on safety lax employees
a. 1, 2, 3, 4
b. 2, 3, 4
c. 1, 2, 3
d. 1, 3, 4
e. 2, 4. - correct answer -c
When a piece of equipment begins to exhibit signs of unsafe
performance, such as excessive vibration, this condition should
be immediately reported to the:
a. Plant manager
b. Immediate supervisor
c. Plant safety committee
d. Workers, Compensation Board
e. Manufacturer's dealer or agent. - correct answer -b
, Page | 4
The 3-4-5 layout method used for locating base lines when
installing machinery:
a. Is accurate if developed with a common, square
b. Is developed using angles other than 90 degrees
c. Requires at least one 90 degree angle
d. Can be traced directly from the installation drawings
e. Is not considered accurate. - correct answer -c
Priority scheduling dictates the work that must be done in a given
sequence. First priority category would include:
1. Safety of equipment and personnel
2. Painting of equipment
3. Replacement of damaged bearings
4. Replacement of ruptured lubricating line
a. 1, 2
b. 1, 3,4
c. 3, 4
d. 1, 2, 3,
e. 2. - correct answer -b
Convenience assignment maintenance scheduling:
a. Allows maintenance to be completed at the convenience of the
3B2 - ULTIMATE ABSA STUDY GUIDE
C1-15 BRAND NEW OFFICIAL
QUESTIONS WITH ANSWERS.
A machine operating with vibration above the safe limits should
be immediately reported to the:
a. Supervisor
b. Safety committee
c. Workers, Compensation Board
d. Manufacturer
e. Plant manager. - correct answer -a
Safety valves mounted on steam boilers may be gagged:
a. During hydrostatic test
b. When greater pressure than the valve set pressure is required
for production
c. When valve spring breaks and the boiler is not scheduled for a
maintenance shut down for ten months
d. Only when the valve is leaking a significant amount of steam
e. Not for any of the above reasons. - correct answer -a
, Page | 2
Foundations for machinery are required to:
a. Increase kilowatt output of prime movers
b. Compensate for misalignment between prime mover and driven
machine
c. Transfer vibration from prime mover to driven machine
d. Absorb vibration
e. Allow for easy replacement of flex couplings. - correct answer -
d
Before entering the mud drum of a water tube boiler for an
internal inspection, when other boilers in the plant are operating,
you should:
1. Make sure the boiler is full of water
2. Blank off or disconnect the blow off lines
3. Blank off or disconnect or close the steam header and non
return valve, with the drain between the valves open and showing
no signs of the line being pressurized
4. Blank off or disconnect the feed water line
a. 1, 2, 3
b. 1, 3, 4
c. 2, 3, 4
d. 1, 2, 4
e. 1, 2, 3, 4. - correct answer -c
, Page | 3
Safety can be promoted and willingly adhered to by a combination
of the following actions.
1. Having, employees attend and participate in safety meetings
2. Keeping safety posters placed throughout the plant
3. Management and supervisors setting a good example
4. Imposing stiff fines on safety lax employees
a. 1, 2, 3, 4
b. 2, 3, 4
c. 1, 2, 3
d. 1, 3, 4
e. 2, 4. - correct answer -c
When a piece of equipment begins to exhibit signs of unsafe
performance, such as excessive vibration, this condition should
be immediately reported to the:
a. Plant manager
b. Immediate supervisor
c. Plant safety committee
d. Workers, Compensation Board
e. Manufacturer's dealer or agent. - correct answer -b
, Page | 4
The 3-4-5 layout method used for locating base lines when
installing machinery:
a. Is accurate if developed with a common, square
b. Is developed using angles other than 90 degrees
c. Requires at least one 90 degree angle
d. Can be traced directly from the installation drawings
e. Is not considered accurate. - correct answer -c
Priority scheduling dictates the work that must be done in a given
sequence. First priority category would include:
1. Safety of equipment and personnel
2. Painting of equipment
3. Replacement of damaged bearings
4. Replacement of ruptured lubricating line
a. 1, 2
b. 1, 3,4
c. 3, 4
d. 1, 2, 3,
e. 2. - correct answer -b
Convenience assignment maintenance scheduling:
a. Allows maintenance to be completed at the convenience of the