True or False: Waste disposal is a problem for the individual workers and some subcontractors,
but it's no big deal - CORRECT ANSWER -False
Truck washing should be done in a designated area, not near the perimeter controls - CORRECT
ANSWER -True
Storage of paints, solvents, cements, pesticides, acids, or other potentially polluting chemicals is
no big deal because they are only stored temporarily and get used up quickly - CORRECT
ANSWER -False
The public needs to understand that dust is just a normal part of construction - CORRECT
ANSWER -False
A temporary gravel construction entrance must extend the full width of the entrance. It must be
at least ____ ft. long and at least ____ in. thick. Aggregate should be _____ in. stone or FDOT
No. _____ stone. Prior to installing the ______ should be placed on the ground to simplify
installation and maintenance. - CORRECT ANSWER -50; 6; 2; 1; geotextile; sediment
Maintenance should be performed when void spaces are full of _____ - CORRECT
ANSWER -Sediment
The maximum drainage area for a silt fence under sheet flow conditions is ____ acre per 100 feet
of barrier length - CORRECT ANSWER -1/4
The average usable life of a silt fence is ____ months - CORRECT ANSWER -6