A company that produces To develop a Pareto chart identifying the root causes of engine
motors uses the following defects
check sheet:
Why would the company use
this check sheet?
To create a control chart to
measure the engine
assembly process
To create a flow chart of the
engine assembly process
To develop a suppliers,
inputs, process, outputs,
customers (SIPOC)
diagram
To develop a Pareto chart
identifying the root causes
of engine defects
1/52
,8/25/25, 12:42 AM C720 PA WGU EXAM COMPREHENSIVE QUESTIONS AND VERIFIED ANSWERS |FREQUENTLY MOST TESTED| (100% acc…
A quality improvement team Control
is trying to illustrate to upper charts Run
management how a process charts
is varying over time as
measurements are collected.
Which two statistical process
control (SPC) tools should
the team use?
Choose 2 answers
Cause-and-effect
diagrams Scatter
diagrams
Histogra
ms Run
charts
Check
sheets
Pareto
charts
Control
charts
The CEO of a service Deming's 14 points
company wants to change
the strategy of the company
from volume sales to high-
quality products.
Which philosophy should the
CEO
implement to emphasize
quality over volume?
Shewhart's variation
reduction Deming's 14
points
2/52
,8/25/25, 12:42 AM C720 PA WGU EXAM COMPREHENSIVE QUESTIONS AND VERIFIED ANSWERS |FREQUENTLY MOST TESTED| (100% acc…
Ohno and Shingo's
kaizen Taguchi's loss
function
A company sells garage Control charts to measure the time
doors through a national elapsed to completion Run charts to
retailer and contracts with chart output around the 14-day central
local installers to complete tendency
the installations. The
operations manager is
responsible for
completing the
installations in a 14-day
period after the sale. The
company will be penalized
financially if it fails to
achieve these objectives.
The operations manager's
daily responsibilities
include contacting
installers to expedite
orders and ensure
deadlines are met.
Which two tools that should
be used to measure
installer performance?
Choose 2 answers
Control charts to measure
the time elapsed to
completion
Fishbone diagram to chart
3/52
, 8/25/25, 12:42 AM C720 PA WGU EXAM COMPREHENSIVE QUESTIONS AND VERIFIED ANSWERS |FREQUENTLY MOST TESTED| (100% acc…
the method, material,
machine, and manpower
Gantt chart to
measure how much
performance has
improved
Run charts to chart output
around the 14- day central
tendency
4/52