100%correct answers
Owner, Design, Installation, and Management - answers✔✔What are the four teams that
comprise the overall Project Team?
Anyone with Consultant in their title except the moving consultant - answers✔✔Who would
belong to the Design team?
Developer, Construction Manager, and Building Management Agency - answers✔✔Which
groups make up the Management Team?
Owner - answers✔✔The End-User, Facility Manager and Building Committee comprise which
team within the Project Team?
Project Managers, Designers and Installers - answers✔✔Which group represent the generic
roles that are important to the Project process?
Schedule, Size, Type, Complexity, and Procurement Requirements - answers✔✔Which project
characteristics must be considered in order to determine which method is best suited for a
particular project?
Technical Support Funding - answers✔✔What is an important aspect of funding that has a
direct impact on the project process and design/installation?
,Programming, Building Design, AV Bid, and Move-In - answers✔✔Whether a construction
project is large or small, which milestones must be achieved in a typical schedule?
Long term projects with extended project cycles - answers✔✔What type of project is a typical
Consultant-Led Design-Bid-Build contract structure good for?
System and infrastructure design and facility functionality may suffer - answers✔✔What is the
risk in using an OFE/Integrator Installed contract structure?
Financial Stability, Current Workload, and Company Credentials - answers✔✔What are some of
the important project scope and size considerations in selecting an AV provider?
RFQ - answers✔✔What type of document typically includes Project Size Requirements,
Corporate Profile, Team Personnel, and Warranty Response Time?
Negotiate with the highest ranking firm to finalize the contract - answers✔✔a significant
difference between the Two-Envelope Bid
Method and the Qualifications- Based Selection Method?
More layers of responsibility and communication - answers✔✔What is one of the disadvantages
of contracting the AV integrator to the electrical
subcontractor?
Pre-Bid Meeting - answers✔✔When conducting a complete project bid process, what milestone
follows the issuing of the RFP?
Scoring responses to an RFQ - answers✔✔Under what circumstances would you likely use an
A305-1986 form?
, Directly to the Owner - answers✔✔What is the ideal way to contract an AV integrator?
Needs Analysis - answers✔✔The process of identifying the activities that end-users need to
perform, and developing the functional descriptions of your systems is referred to as:?
Conducting program meetings - answers✔✔What is the main task of the third Step of the
Program Phase of a Project?
...A conceptual and functional system description - answers✔✔What should be included in the
written Program Report?
Count Ceiling Tiles in a drop tile instalation - answers✔✔The more accurate means to estimate
dimensions of a commercial space during a site inspection would be to?
Needs Analysis - answers✔✔A client requires a new boardroom. The sales person and engineer
are sent to the premises to measure the facility and talk to the client. At this stage they should
be performing a _
Providing a sloped, or stepped, seating arrangement - answers✔✔Sightlines for audience
viewing in a given presentation space can be improved by:
Regularly, until a decision is made - answers✔✔After presenting a proposal, what is the correct
plan of action for following up with the client?
Functions to support the applications - answers✔✔AV professionals determine the end user's
needs by examining three things: the required applications, the tasks, and the:
Design phase - answers✔✔When working with a client to design an AV solution for a new
conference center, the client requests a detailed budget for the equipment and installation.
What phase is the project in?