answers
1.What area(s) of consideration should the AV professional address with
the client regarding building structure and AV service issues?: Ensure
adequate power source(s), ensure AV program source access.
2.How is an AV project estimate created for a client?: Calculating goods,
labor, materials and other projected costs, plus a markup.
3.What is the diagram shown in the exhibit used for in AV gement
mana activities?: Helps in sequencing and scheduling project
events.
4.Detailed descriptions of specific services, experience required for
proposed project staff and AV drawings may be included when creating
a(n)?: Request for proposal (RFP) for labor and service providers
5.Which pieces of equipment are necessary for testing leads and
evaluating an audio signal chain?: A Signal Generator and Signal
Analyzer
6.When commissioning for video display installation, how will the AV
techni- cian test to ensure that the video display system is working
properly?: Confirm brightness, contrast and color adjustments using
SMPTE PLUGE Pattern. ock
7.What type of diagram or drawing is pictured in the exhibit?: A BlDiagram
8.If an AV professional believes that an AV system requires its own VLAN
(Virtual Local Area Network),what information must be communicated to
the AV professional's IT counterparts?: Why the VLAN is necessary.
9.Noise in a room can be a distraction to users and have an impact on the
effectiveness of an AV system. Which of the following generates
mechanical and structural noise?: HVAC fans, diffusers and air handlers.
10.What would mechanical drawings be used to determine on a site visit?: -
Locations of heating, plumbing and ventilation in a venue.
11.If the text size in a projected presentation is 3 inches (76 mm), then the
viewer should not be farther away than for reading the text?: 450
inches (11,400 mm)
12.One major difference between the Service Level Agreement process
1/
8
, CTS PRACTICE EXAM QUESTIONS fully resolved with correct
answers
and the traditional Program Report is the SLA focuses upon?:
Measurement of service through monitoring procedures.
13. When would an AV contractor need to consider an IPv6 deployment
instead of IPv4?: On a contract with a government agency where it is
mandated.