1. 5S sort, set in order, shine, standard
ize, sustain
2. 5 whys A technique in which you repeate
ly ask the question "Why?"
to help peel away the layers
of symptoms that can lead to
the root cause of a problem
3. Criticality analysis allows organizations to Identify the most significant risks
4. Criticality analysis attempts to identify The likelihood of a risk occurring
5. Criteria for criticality analysis may include Safety, Environmental, and Produ
tion consequences
6. The earliest asset lifecycle phase a During the design phase
criticality analysis may be performed
is:
ISO14224
7. The ISO standard that includes criticality
analy- sis is:
RCM, PMO, FMEA
8. Reliability strategy development (RSD) is
based on three main techniques:
9. RSD relies upon two areas of competence: 1. Understanding of the ditter-
ences between RCM, PMO,
and FMEA. 2. Identifying when
and where each technique
should be applied.
10. What does RSD stand for? reliability strategy development
11. There are many forms of RCM, PMO, and FMEA:
1/
42
, CRL EXAM STUDY QUESTIONS AND CORRECT ANSWERS
All of these derivates help perform
analyses cost ettectively
12. Which of the following statements is FMEA helps designers and engi-
true re- garding FMEA? neers improve the reliability of
as- sets and systems to
produce quality
1. FMEA helps designers and engineers improve products
the reliability of assets and systems to
produce quality products.
2. FMEA is universally applied to all new
assets during the design phase.
3. FMEA governance is defined in the
ISO/TS 16949
13. What does FMEA stand for? Failure Mode and Ettects Analysis
14. What does RCM stand for? Reliability Centered Maintenance
15. What does RCA stand for? Root cause analysis
16. A preventative/planned maintenance Evaluating each PM task and
optimiza- tion process focuses on: elimi- nating unnecessary tasks
or waste- ful activities
17. The Reliability Engineering for Pinpoint potential areas for
Maintenance process is designed to: relia- bility improvement
18. Uptime divided by Uptime + Downtime equals: Availability
19. MTBF means Mean Time Between Failures
20. The definition Uptime is: A measure of the time an
2/
42
,CRL EXAM STUDY QUESTIONS AND CORRECT ANSWERS
asset is working and
available
3/
42
, CRL Exam Study
Study online at
https://quizlet.com/_byyjm3
21. Failure rate refers to the cost of a failure: FALSE
22. Root cause analysis is designed to causes of failure
elimi- nate
23. One of the most basic methods of root The 5 Why's
cause analysis is called
24. The first step in a root cause analysis is to Define the problem
25. Root cause analysis should be performed by A cross functional team
26. Root cause analysis is a continuous TRUE
improve- ment methodology
27. Capital projects are usually created to increase: Capacity
28. A test to determine compliance with A acceptance test
specified requirements is:
29. The term for stages involved in the Lifecycle
manage- ment of an asset is:
30. Investment planning for capital projects is Business needs analysis phase
con- ducted during this phase
31. Capital projects may be driven by regulatory re- TRUE
quirements for existing assets:
32. It is okay to buy a cheaper motor Yes
because you have to create a budget for
the project?
33. You always have to buy the most expensive mo- FALSE
tor. True or false?