100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

Walmart - Stormwater Exam Questions With Correct Answers.

Rating
-
Sold
-
Pages
3
Grade
A+
Uploaded on
12-08-2025
Written in
2025/2026

Walmart - Stormwater Exam Questions With Correct Answers.

Institution
Walmart - Stormwater
Course
Walmart - Stormwater








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Walmart - Stormwater
Course
Walmart - Stormwater

Document information

Uploaded on
August 12, 2025
Number of pages
3
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Walmart - Stormwater Exam Questions
With Correct Answers
The |1970's |law |that |set |into |place |the |regulation |of |stormwater |is: |- |CORRECT |ANSWER✔✔-
The |Clean |Water |Act



Requirements |for |managing |stormwater |activity |on |a |construction |site |are |outlined |in |the |
following |regulation: |- |CORRECT |ANSWER✔✔-NPDES



Which |of |the |following |is |never |an |allowable |stormwater |discharge |from |a |construction |site? |- |
CORRECT |ANSWER✔✔-Discharge |from |contaminated |groundwater



The |Notice |of |termination |can |filed |when: |- |CORRECT |ANSWER✔✔-All |construction |activity, |
inside |and |outside |the |building, |is |complete |and |permanent |stabilization |verified



Relative |to |stormwater |permitting, |all |of |the |following |must |occur |before |construction |starts |
except: |- |CORRECT |ANSWER✔✔-Submit |the |notice |of |termination |(NOT)



Which |erosion |control |best |mgmt |practice |increases |water |infiltration, |dissipates |rainfall |
energy |and |slows |overland |flow |of |stormwater |- |CORRECT |ANSWER✔✔-Vegetation



Of |the |following |factors |that |influence |erosion |rates, |the |one |a |contractor |has |the |most |
control |over |is: |- |CORRECT |ANSWER✔✔-Groundcover



Temporary |stabilization |should |be |implemented |- |CORRECT |ANSWER✔✔-Immediately |on |all |
disturbed |areas |that |are |likely |to |or |will |remain |inactive |for |14-days |or |more



The |Primary |purpose |of |a |construction |exit |is |- |CORRECT |ANSWER✔✔-To |remove |sediment |
from |construction |site |vehicles |and |minimize |trackout

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Lectphilip West Virginia University
View profile
Follow You need to be logged in order to follow users or courses
Sold
181
Member since
1 year
Number of followers
6
Documents
19309
Last sold
14 hours ago
WELCOME TO LECTPHILIP, A PLACE WHERE WE UNLOCK YOUR ACADEMIC OPPORTUNITIES

On this page, you find all documents, package deals and flashcards offered by seller lectphilip

4.0

29 reviews

5
14
4
6
3
5
2
2
1
2

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions