Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 20 pages
Exam (elaborations)

ACI Certification- Concrete Field Testing Technician Grade 1 CP-1 (12) Exam with accurate solutions

Document preview thumbnail
Preview 3 out of 20 pages

ACI Certification- Concrete Field Testing Technician Grade 1 CP-1 (12) Exam with accurate solutions

Content preview

ACI Certification- Concrete Field Testing
|!| |!| |!| |!| |!|




Technician Grade 1 CP-1 (12) Exam with accurate |!| |!| |!| |!| |!| |!| |!| |!|




solutions


ASTM C1064 - correct answer✔✔Standard Test Method For Temperature of
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




Freshly Mixed Hydraulic-Cement Concrete
|!| |!| |!|




The sensor of the temperature measuring device shall be submerged a
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




minimum of ______ inches into the freshly mixed concrete. - correct
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




answer✔✔3"



The temperature measuring device shall have a capacity of measuring
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




temperature of freshly mixed concrete to ± ______ °F throughout a range
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




of ____________. - correct answer✔✔1 degree, 30 degrees to 120 degrees
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




The temperature measuring device shall be calibrated ______ , or whenever
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




there is a question of ______ . - correct answer✔✔Annually, accuracy
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




The temperature of concrete may be measured in a wheelbarrow. True or
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




False? - correct answer✔✔True
|!| |!| |!|




The temperature of concrete may be measured in a wall form. True or
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




False? - correct answer✔✔True
|!| |!| |!|




What must be done to the sample container prior to sampling the
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




concrete? - correct answer✔✔Dampen with water |!| |!| |!| |!| |!|

,What must be done to the concrete surrounding the temperature
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




measuring device after the device is submerged in the fresh concrete? - |!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




correct answer✔✔Close off air voids by gently pressing the concrete
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




around the device |!| |!|




How long must the temperature measuring device remain in the freshly
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




mixed concrete? - correct answer✔✔minimum of two minutes, maximum of
|!| |!| |!| |!| |!| |!| |!| |!| |!|




five minutes
|!| |!|




The temperature of the concrete is reported to the nearest ______ °F -
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




correct answer✔✔1 degree |!| |!|




A maximum temperature of freshly mixed concrete is specified in ASTM
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




C1064. True or False? - correct answer✔✔False |!| |!| |!| |!| |!| |!|




ASTM C172 - correct answer✔✔Standard Practice for Sampling Freshly
|!| |!| |!| |!| |!| |!| |!| |!| |!|




Mixed Concrete |!|




Sampling by this method is required when tests are to be made to
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




determine _____ with specification requirements. - correct |!| |!| |!| |!| |!| |!| |!|




answer✔✔Compliance



This method covers sampling from four types of mixers, which are _____ ,
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




_____ , _____ , and _____ . - correct answer✔✔Stationary mixers, paving
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




mixers, revolving drum mixers and open top mixers |!| |!| |!| |!| |!| |!| |!|




The maximum allowable time between obtaining the first and final portions
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




of a composite sample is _____ minutes. - correct answer✔✔15
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




Portions of a composite sample shall be thoroughly remixed before
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




beginning tests on the sample. True or False? - correct answer✔✔True |!| |!| |!| |!| |!| |!| |!| |!| |!| |!|

, The maximum elapsed time allowed between obtaining the final portion of
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




the composite sample and beginning the tests for slump, temperature, and
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




air content is _____ minutes. - correct answer✔✔5
|!| |!| |!| |!| |!| |!| |!| |!|




The molding of strength test specimens shall begin within _____ minutes
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




after fabricating the composite
|!| |!| |!|




sample. - correct answer✔✔15 |!| |!| |!|




The concrete sample must be protected from contamination and _____. -
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




correct answer✔✔Rapid evaporation |!| |!|




The minimum size sample for making strength test specimens is _____. -
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




correct answer✔✔1 cubic foot |!| |!| |!|




When sampling from a stationary mixer, the batch must be sampled at
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




_____ or more regularly spaced intervals during discharge of the middle
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




portion of the batch. - correct answer✔✔2|!| |!| |!| |!| |!| |!|




The composite sample for a paving mixer must represent a minimum of
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




_____ different portions of the batch of concrete taken from the pile after
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




discharge. - correct answer✔✔5 |!| |!| |!|




When sampling from a revolving drum truck mixer, concrete must be
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




sampled at a minimum of _____ regularly spaced intervals during discharge
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




of the middle portion of the batch. - correct answer✔✔2
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




Concrete samples from a truck mixer must be obtained before any water
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




or admixtures are added to the mixer at the job site. True or False? -
|!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!| |!|




correct answer✔✔False |!|

Document information

Uploaded on
August 10, 2025
Number of pages
20
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$16.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Ruiz
3.2
(15)
Sold
105
Followers
2
Items
14136
Last sold
1 week ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions