Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

VIRGINIA ALTERNATIVE ENERGY SYSTEM CONTRACTING EXAM STUDY GUIDE COMPLETE QUESTIONS AND WELL-EXPLAINED CORRECT ANSWERS (RECENTLY UPDATED)

Rating
-
Sold
-
Pages
108
Grade
A+
Uploaded on
10-08-2025
Written in
2025/2026

VIRGINIA ALTERNATIVE ENERGY SYSTEM CONTRACTING EXAM STUDY GUIDE COMPLETE QUESTIONS AND WELL-EXPLAINED CORRECT ANSWERS (RECENTLY UPDATED)...

Institution
VIRGINIA ALTERNATIVE ENERGY SYSTEM CONTRACTING
Course
VIRGINIA ALTERNATIVE ENERGY SYSTEM CONTRACTING

Content preview

Q1.
Which section of the Virginia Uniform Statewide Building Code (USBC)
primarily governs the installation of solar photovoltaic systems?
A. Chapter 11 – Energy Efficiency
B. Chapter 27 – Electrical
C. Chapter 3 – Occupancy Classification
D. Chapter 7 – Fire and Smoke Protection

Answer: B
Explanation: Chapter 27 of the USBC references the NEC and governs
electrical system requirements, including PV systems.



Q2.
According to the NEC, PV system disconnects must be:
A. Located inside the main service panel only
B. Accessible and labeled
C. Hidden behind protective panels
D. Installed underground

Answer: B
Explanation: NEC 690.13 requires PV system disconnecting means to be
readily accessible and properly labeled to ensure safety during maintenance or
emergencies.



Q3.
For small wind systems in Virginia, the most common zoning restriction relates
to:
A. Blade material
B. Tower height
C. Generator type
D. Paint color

,Answer: B
Explanation: Many Virginia localities impose tower height limits for small
wind systems, often tied to property size and setback distances.



Q4.
In solar thermal systems, which fluid is most commonly used for freeze
protection in Virginia climates?
A. Water only
B. Ethylene glycol mixture
C. Diesel fuel
D. Mineral oil

Answer: B
Explanation: A water/propylene or ethylene glycol mixture is commonly used
in closed-loop solar thermal systems in cold climates to prevent freezing.



Q5.
What is the minimum NEC working space depth in front of a PV inverter?
A. 18 inches
B. 24 inches
C. 36 inches
D. 48 inches

Answer: C
Explanation: NEC 110.26 requires a minimum 36 inches of working clearance
depth in front of electrical equipment.



Q6.
In geothermal closed-loop systems, the heat exchange fluid must:
A. Be flammable for efficiency
B. Meet environmental safety standards
C. Be stored in open containers
D. Contain chlorine

Answer: B
Explanation: The fluid must meet EPA and local environmental safety
standards to avoid groundwater contamination.

,Q7.
Which of the following is a net metering requirement in Virginia?
A. System must be over 5 MW
B. Must connect to the utility grid via approved interconnection
C. Must store all generated power on-site
D. Must be diesel-assisted

Answer: B
Explanation: Virginia net metering laws require approved interconnection with
the utility to credit excess generation.



Q8.
When mounting solar panels on a roof, what is the main structural concern?
A. Color matching shingles
B. Roof slope aesthetics
C. Load capacity and wind uplift
D. Matching the homeowner’s budget

Answer: C
Explanation: The roof must be evaluated for structural load and wind uplift
resistance per building codes.



Q9.
The term STC in solar module ratings stands for:
A. Standard Test Conditions
B. Solar Thermal Calibration
C. Static Thermal Conduction
D. Standard Thermal Coefficient

Answer: A
Explanation: Standard Test Conditions refer to lab-rated performance at set
irradiance, temperature, and air mass conditions.



Q10.
What does NEC Article 690 primarily cover?
A. Electric vehicle charging stations

, B. Solar photovoltaic systems
C. Biomass boiler installations
D. Wind turbine blades

Answer: B
Explanation: NEC 690 is dedicated to PV system requirements, including
wiring, grounding, and disconnects.



Q11.
In Virginia, who enforces compliance with the USBC for alternative energy
systems?
A. State police
B. Local building officials
C. The governor’s office
D. The contractor’s insurance company

Answer: B
Explanation: Local building officials review and inspect installations for
compliance with the USBC.



Q12.
Which OSHA standard addresses fall protection for rooftop solar installations?
A. 1926.502
B. 1926.501
C. 1910.305
D. 1926.453

Answer: B
Explanation: OSHA 1926.501 outlines fall protection requirements for workers
at heights.



Q13.
What is the primary advantage of a grid-tied PV system without batteries?
A. Lower upfront cost
B. Complete independence from utility
C. Off-grid emergency power
D. Increased fire risk

Written for

Institution
VIRGINIA ALTERNATIVE ENERGY SYSTEM CONTRACTING
Course
VIRGINIA ALTERNATIVE ENERGY SYSTEM CONTRACTING

Document information

Uploaded on
August 10, 2025
Number of pages
108
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • according to the nec
$71.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Thumbnail
Package deal
VA ALTERNATIVE ENERGY SYSTEM CONTRACTING PACKAGED EXAMS
-
3 2025
$ 60.94 More info

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Mirror Liberty University
View profile
Follow You need to be logged in order to follow users or courses
Sold
427
Member since
3 year
Number of followers
137
Documents
5102
Last sold
1 day ago

3.8

61 reviews

5
23
4
18
3
9
2
4
1
7

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions