Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 291 pages
Exam (elaborations)

Solution Manual and Answer Guide :Electrical Wiring Commercial 18th Edition by Phil Simmons, Ray C. Mullin & Mark Ode||ISBN: 9780357767108|| All Chapters 1-21|| LATEST UPDATE.

Document preview thumbnail
Preview 4 out of 291 pages

Solution Manual and Answer Guide :Electrical Wiring Commercial 18th Edition by Phil Simmons, Ray C. Mullin & Mark Ode||ISBN: 9780357767108|| All Chapters 1-21|| LATEST UPDATE.

Content preview

Solution Manual
And Answer Guide;
Electrical Wiring Commercial
By Phil Simmons, Ray C. Mullin, Mark Ode.
18th Edition




1|Page

,Solution And Answer Guide
CHAPTER 1: COMMERCIAL BUILDING PLANS AND SPECIFICATIONS


TABLE OF CONTENTS

Review ............................................................................................................................................. 1



Note To Instructor: It Is Recommended That Students Be Required To Respond, Where
Appropriate, With Answers That Are Complete Sentences.


REVIEW


Refer To The National Electrical Code Or The Working Drawings When Necessary.
Where Applicable, Responses Should Be Written In Complete Sentences.
1. What Section Of A Commercial Building’s Specification Contains A List
Of Contract Documents?
Answer; A List Of The Contract Documents Is Contained In General Clauses
And Conditions. A Listing Of The Commercial Building Contract Documents Is
Presented In This Chapter Under The Heading ―Commercial Building Plans.‖ The
Instructor May Wish To Have The Students Check Over This Listing And
Compare It With The Plans Provided.
2. The Requirement For Temporary Light And Power At The Job Site Will Be Found In What
Portion Of A Commercial Building’s Specification?
Answer; The Supplementary General Conditions Specifies The Job Site
Requirements For Temporary Light And Power. In Some Contracts, This
Electrical System Becomes The Responsibility Of The General Contractor; In
Other Contracts, It Is The Electrical Contractor’s Responsibility To Install And
Maintain The Temporary Electrical System. The Instructor May Wish To Refer
The Student To Nec Article 590 And Discuss The Requirements In Detail.




2|Page

,3. The Electrician Uses The Schedule Of Working Drawings For What Purpose?

Answer; The Electrician Uses The Schedule Of Working Drawings To
Determine Whether All Of The Drawings Are At Hand. The Information On
―The Other Sheets‖ May Be Very Important, Especially In Coordinating With
Other Contractors.
4. Complete The Following Items By Indicating The Letter(S) Designating
The Correct Source(S) Of Information:


No. Answer Item Information

4. Sections Ceiling Height Sections, Sheet A6

5. Electrica Electrical Electrical Symbol Schedule, Chapter
l Receptacle Style 2, Figure 2–6
Symbol
Schedul
e

6. Electrica Electrical Electrical Layout Drawings,
l Layout Outlet Sheets El, E2, And E3
Drawin Location
gs

7. Elevations Exterior Wall Finishes Elevations, Sheets A4 And A5

8. Site Plan Grading Elevations Site Plan, Sheet A4

9. Electrica Panelboard Schedules Electrical Layout Drawings, Sheet E4
l Layout
Drawin
gs

10. Architectura Room Width Architectural Floor Plan, Sheets Al,
l Floor Plan A2, And A3

11. Architectura Swing Of Door Architectural Floor Plan, Sheets Al, A2,
l Floor Plan And A3

12. Sections View Of Interior Wall Sections, Sheet A6
3|Page

, Match The Items On The Left With Those On The Right By Writing The Letter
Designation Of The Appropriate Organization From The List On The Right.


13. Nec Electrical Code National Electrical Code (Nec)

14. Iaei Electrical Inspectors International Association Of
Electrical Inspectors (Iaei)




4|Page

Connected book
 image
Phil Simmons, Ray C. Mullin, Mark Ode Electrical Wiring Commercial
Edition: 2023 ISBN: 9780357767108 Edition: Unknown

Document information

Uploaded on
July 31, 2025
Number of pages
291
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$14.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
academiccontent
3.0
(2)
Sold
37
Followers
0
Items
67
Last sold
2 months ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions