Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 81 pages
Exam (elaborations)

EPA Model Lead Based Paint Risk Assessor Questions and Correct Answers/ Latest Update / Already Graded

Document preview thumbnail
Preview 4 out of 81 pages

When did they reduce to Lead Levels in consumer products Ans: 1978 What is a soffit? Ans: The underside of a horizontal surface which projects beyond a wall line, such as an overhanging roof. T/F: The risk assessor should be involved in the process of selecting a contractor. Ans: False Scenario: You arrive on premises and are scheduled to conduct a visual assessment of the property. Which do you take note of? Ans: 1. There are big cracks in the walls. 2. Ceiling is leaking in the bathroom and the kitchen. 3. The window wells are in disrepair- and contain paint chips. 4. Right across the street there's a battery recycling shop. Page | 2 What's the difference between a risk assessment and an EBL child investigation Ans: A risk assessment determines the Lead Hazards and An EBL investigation focus on where the child has been and the cause or causes of exposure. The objective of a Risk Assessment is: Ans: To determine and report the existence, nature, severity, and location of lead paint hazards and potential remedies What is the definition of a Lead Inspection: Ans: A surface by surface investigation for determining the presence and location of lead based paint and report the results A Risk Assessor must consider the following factors in addition to the concentration of lead in paint: Ans: - Condition of paint - various pathways (dust and soil) - Future plans (maintenance and rehabilitation) A Risk assessment is best described as _________ the approach of lead paint Inspection and Abatement. All rights reserved © 2025/ 2026 | Page | 3 All rights reserved © 2025/ 2026 | Ans: A supplement to A Lead Hazard screen is a type of Risk assessment that applies to housing that is: Ans: In good condition The Risk Assessment process developed by HUD include: Ans: - Determining the most appropriate evaluation process and obtaining background information - Conducting the evaluation and determining the actual hazards -Providing guidance toward reducing and eliminating lead hazards and producing a written report Before conducting a Risk Assessment, the Risk Assessor should: Ans: - Collect background information on the number of similar units in the development, the construction date, and the number of children in each unit - Collection information on the management and maintenance of the units within the development The Visual Assessment identifies:

Content preview

Page |1


EPA Model Lead Based Paint Risk
Assessor Questions and Correct Answers/
Latest Update / Already Graded
When did they reduce to Lead Levels in consumer products

Ans: 1978


What is a soffit?

Ans: The underside of a horizontal surface which projects
beyond a wall line, such as an overhanging roof.


T/F: The risk assessor should be involved in the process of selecting a
contractor.

Ans: False


Scenario: You arrive on premises and are scheduled to conduct a visual
assessment of the property. Which do you take note of?

Ans: 1. There are big cracks in the walls.
2. Ceiling is leaking in the bathroom and the kitchen.
3. The window wells are in disrepair- and contain paint chips.
4. Right across the street there's a battery recycling shop.



All rights reserved © 2025/ 2026 |

, Page |2

What's the difference between a risk assessment and an EBL child
investigation

Ans: A risk assessment determines the Lead Hazards and An
EBL investigation focus on where the child has been and the
cause or causes of exposure.


The objective of a Risk Assessment is:

Ans: To determine and report the existence, nature, severity,
and location of lead paint hazards and potential remedies


What is the definition of a Lead Inspection:

Ans: A surface by surface investigation for determining the
presence and location of lead based paint and report the results


A Risk Assessor must consider the following factors in addition to the
concentration of lead in paint:

Ans: - Condition of paint
- various pathways (dust and soil)
- Future plans (maintenance and rehabilitation)


A Risk assessment is best described as _________ the approach of lead
paint Inspection and Abatement.

All rights reserved © 2025/ 2026 |

, Page |3


Ans: A supplement to


A Lead Hazard screen is a type of Risk assessment that applies to
housing that is:

Ans: In good condition


The Risk Assessment process developed by HUD include:

Ans: - Determining the most appropriate evaluation process
and obtaining background information
- Conducting the evaluation and determining the actual hazards
-Providing guidance toward reducing and eliminating lead
hazards and producing a written report


Before conducting a Risk Assessment, the Risk Assessor should:

Ans: - Collect background information on the number of similar
units in the development, the construction date, and the
number of children in each unit
- Collection information on the management and maintenance
of the units within the development


The Visual Assessment identifies:



All rights reserved © 2025/ 2026 |

, Page |4


Ans: Deteriorated paint, friction and impact surfaces, areas
that have been mouthed by a child, bare soil and accumulated
dust.


The condition of fair for interior components with small surface areas
would have ______ of deterioration:

Ans: <10%


Chipped paint is defined as:

Ans: Paint that is loosened or broken because of impact


Children are most commonly poisoned by:

Ans: Chewing on lead contaminated components


The condition rating of fair for exterior components with large surface
areas would have______of deterioration.

Ans: <10 square feet


Dust Wipe sampling is recommended sampling method for most
routine risk assessment because:



All rights reserved © 2025/ 2026 |

Document information

Uploaded on
July 31, 2025
Number of pages
81
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$14.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Expert1
4.5
(8)
Sold
65
Followers
3
Items
7597
Last sold
3 weeks ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions