Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 11 pages
Exam (elaborations)

WGU C215 Operations Management PVDC Final Exa Test Questions with Answers 100% Pass

Document preview thumbnail
Preview 2 out of 11 pages

Which definition is used for quality, evaluates how well a product performs its intended function? - ANSWER -Fitness for use 14 points for quality improvement - ANSWER -Which total quality management (TQM) process was developed to stress management's responsibility for quality? ISO 9000 - ANSWER -Set of international standards on quality management and quality assurance, critical to international business -TQM process consists of 13 published standards and guidelines -Like when joint commission shows up at the hospitals Checklist - ANSWER -A list of common defects and the number of o

Content preview

WGU C215 Operations Management PVDC Final Exa Test
Questions with Answers 100% Pass

Which definition is used for quality, evaluates
how well a product performs its intended common causes or random - ANSWER -
function? - ANSWER -Fitness for use Stuff you cannot identify
-Random causes that we cannot identify,
unavoidable
14 points for quality improvement -
ANSWER -Which total quality management
(TQM) process was developed to stress Cpk measures - ANSWER -How close one
management's responsibility for quality? is to a target and how consistent one is with the
average performance.
-How closely it measures
ISO 9000 - ANSWER -Set of international
standards on quality management and quality
assurance, critical to international business Six Sigma - ANSWER -Technical tolls and
-TQM process consists of 13 published people involvement
standards and guidelines The empirical rule, 3 standard deviations. This is
-Like when joint commission shows up at the 3 sigma's.
hospitals 6 sigmas and you are almost at 100%
DMAIC

Checklist - ANSWER -A list of common
defects and the number of observed occurrences DMAIC (Define, Measure, Analyze, Improve,
of these defects. Control) - ANSWER -a six sigma process
that outlines the steps that should be followed to
improve an existing business process
scatter diagram - ANSWER -a plot of two
variables showing whether they are related
define stage - ANSWER -includes the voice
of the customer and value stream
Control Chart - ANSWER -A graph that
shows whether a sample of data falls within the
common or normal range of variation. Job Design - ANSWER -It does not have
anything to do with people.
-The process by which managers decide how to
mean - ANSWER -A statistical measure of divide tasks into specific jobs
central tendency, or average, based on dividing
a total by the number of individual cases.
waiting time - ANSWER --Screen patients
and fast track those with minor ailments
assignable causes of variation - ANSWER - -amount of time a process has been waiting in
-Causes can be identified and eliminated the ready queue
-e.g. poor employee training, worn tool, machine
needing repair
Service location decisions - ANSWER --


, WGU C215 Operations Management PVDC Final Exa Test
Questions with Answers 100% Pass

proximity to customers
-Quality of life issues break-even analysis - ANSWER -the
process of determining the number of units a firm
must sell to cover all costs. Considers fixed
proximity to customers - ANSWER --key costs, variable costs.eg Fed EX is in Tennessee
factor of a location analysis for a service so it will be in the middle
company
-if you need to have a car repaired, you wont
drive too far. repetitive process - ANSWER -classic
assembly line. A line process, a continuous
process.
Capacity Planning - ANSWER -Hospital-
Capacity is beds and output is the patients. If you
have 1 pt for 2 days and one for 3 days. The Project Process - ANSWER -make a one-
output is how many patients and not how many at-a-time product exactly to customer
beds we have. specifications, expensive. Like an automobile
collision shop that does body and engine repair
as well as custom vehicle paint job.
capacity utilization - ANSWER -are you
using more workers and what are your
resources? Measures how much of the available Batch Process - ANSWER -a process in
capacity is actually being used. Measures which goods or services are produced in groups
effectiveness. (batches) and not in a continuous stream eg.
auto shop offers body repair, engine repair, and
custom vehicle paint options
Capacity Focus - ANSWER -facilities that
are small, specialized, and focused on a narrow
set of objectives. Bottleneck in a flowchart - ANSWER -the
longest part in the process eg manufacturing a
car and the car needs to be painted or the time
effective capacity - ANSWER - the cake in the oven.


capacity measurement at the best operating level compute process velocity - ANSWER -
- ANSWER -when the average unit cost is Throughput time/value-added time
minimized -How fast we are going


center of gravity approach - ANSWER -an Actual output/standard output - ANSWER -
approach for locating a single facility that Which formula would indicate that a fast-food
minimizes the distance to existing facilities. restaurant was performing at, above, or below its
-use the breakeven analysis -how many units benchmark?
needed to manufacture to breakeven. -We know how many burgers were making and
what the standard is

Document information

Uploaded on
July 30, 2025
Number of pages
11
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MERCYTRISHIA
3.9
(43)
Sold
235
Followers
35
Items
14421
Last sold
2 days ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions