Aci Concrete Field Testing Technician-
Grade I Exam With Complete Solutions


The sensor of the temperature measuring device shall be submerged a minimum of _____ in.
[_____mm] into the freshly mixed concrete. - CORRECT ANSWER✔✔3 in. [75 mm]



The temperature measuring device shall have a capacity of measuring temperature of freshly mixed
concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. - CORRECT ANSWER✔✔1
degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C]



The temperature measuring device shall be calibrated _____, or whenever there is a question of _____.
- CORRECT ANSWER✔✔Annually, accuracy



The temperature of concrete may be measured in a wheelbarrow. True or False? - CORRECT
ANSWER✔✔True



The temperature of concrete may be measured in a wall form. True of False - CORRECT
ANSWER✔✔True



A composite sample of concrete is required even if the only purpose for obtaining the sample is to
determine temperature. True of False? - CORRECT ANSWER✔✔False



What must be done to the sample container prior to sampling the concrete? - CORRECT
ANSWER✔✔Dampen (with water)

,What must be done to the concrete surrounding the temperature measuring device after the device is
submerged in the fresh concrete. - CORRECT ANSWER✔✔Gently press the concrete around the
temperature measuring device at the surface of the concrete



How long must the temperature measuring device remain in the freshly mixed concrete? - CORRECT
ANSWER✔✔At least 2 minutes but not more than 5 minutes



After the temperature of the concrete is read, what is required? - CORRECT ANSWER✔✔Reporting of
temperature



The temperature of concrete is reported to the nearest _____ degrees F [_____ C] - CORRECT
ANSWER✔✔1 degree F [0.5 C]



According to ASTM C1064, what is one reason to take the temperature of concrete? - CORRECT
ANSWER✔✔Verify conformance to a specified requirement for temperature of concrete



A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True of False? -
CORRECT ANSWER✔✔False



The sample of concrete used for temperature determination must be rodded 25 times. True or False? -
CORRECT ANSWER✔✔False



Sampling by this method is required when tests are to be made to determine _____ with specification
requirements. - CORRECT ANSWER✔✔Compliance



This method covers sampling from four types of mixtures which are _____, _____, _____, and _____. -
CORRECT ANSWER✔✔Stationary mixers, paving mixers, revolving drum mixers, and open top mixers

, The maximum allowable time between obtaining the first and final portions of a composite sample is
_____ minutes. - CORRECT ANSWER✔✔15



Portions of a composite sample shall be thoroughly remixed bfore beginning tests on the sample. True
of False? - CORRECT ANSWER✔✔True



The maximum elapsed time allowed between obtaining the final portion of the composite sample and
beginning the tests for slump, temperature, and air content is _____ minutes. - CORRECT ANSWER✔✔5



The molding of strength test specimens shall begin within _____ minutes after fabricating the composite
sample. - CORRECT ANSWER✔✔15



The concrete sample must be protected from contamination and _____. - CORRECT ANSWER✔✔Rapid
evaporation



The minimum size sample for making strength test specimens is _____. - CORRECT ANSWER✔✔28 L
(1ft^3)



When sampling from a stationary mixer, the batch must be sampled at _____ or more regularly spaced
intervals during discharge of the middle portion of the batch - CORRECT ANSWER✔✔2



The composite sample for a paving mixer must represent a minimum of _____ different portions of the
batch of concrete taken from the pile after discharge. - CORRECT ANSWER✔✔5



When sampling from a revolving drum truck mixer, concrete must be sampled at a minimum of _____
regularly spaced intervals during discharge of the middle portion of this batch. - CORRECT ANSWER✔✔2



Concrete samples from a truck mixer must be obtained before any water or admixtures are added to the
mixer at the job site. True or False? - CORRECT ANSWER✔✔False

Document information

Uploaded on
July 29, 2025
Number of pages
16
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Edufiles
4.9
(214)
Sold
137
Followers
10
Items
7540
Last sold
1 month ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions