Sheet iikeynote iior iireference iikeynote ii- iiCORRECT iiANSWER-a iinotation iion iia
iisingle ii
ii
drawing
iisheet
ii
"A iifacility's ii"life iicycle" iiincludes iiall iiof iithe iifollowing iiEXCEPT:
iia. iiProject iiconception ii
b. Financing ii
c. Construction ii
d. Facility iimanagement" ii- iiCORRECT iiANSWER-1. iib ii- iiPRM ii1.4 iiLife iicycle iiStages:
iiConceptions, iiDelivery iiMethod, iiDesign, iiPsrocurement, iiConstruction, ii
ii
What iidoes iiCSI's iiUDS iido ii? iiwhat iidoes iiit iistand iifor ii? ii- iiCORRECT iiANSWER-
UDS ii
ii
uniform iidrawing
iisystem
ii
CMa iistands iifor... ii- iiCORRECT iiANSWER-Construction iiManager iias iiAdvisor ii
ii
"The iiobjective iiof iithe iicompetitive iibidding iiprocess iiis: ii
a. To iiensure iithat iiall iiqualified iibidders iimay iisubmit iibids iion iipublic iiwork iiprojects ii
b. To iiensure iithat iipublic iiworks iicontracts iiare iialways iiawarded iito iithe iilowest iibidders ii
c. To iiensure iithat iithe iiintent iiof iithe iigoverning iipublic iilaws iiis iimaintained iiin iithe
iiawarding iiof iicontracts ii
d. To iiensure iithat iithe iicost iiof iithe iiproject iiis iireasonable iiand iiconsistent iiwith iithe
iiprevailing iiconditions iiin iithe iibuilding iiindustry" ii- iiCORRECT iiANSWER-2. iid ii- iiPRM
ii3.4 ii
ii
What iiis iiincluded iiin iiPART ii3 iiof iiSectionFormat? ii- iiCORRECT iiANSWER-PART ii3-
iiEXECUTION: iidescribes iifield/site iiinstallation iior iiapplication, iiincluding iipreparatory
iiactions iiand iipost-installation iicleaning iiand iiprotection. iiField/site-built iiassemblies iiand
iifield/site-manufactured iiproducts iiand iisystems iiare iiincluded. ii
ii
"A iiunit iiprice iicontract iior iicontract iiportion iiis iiused iiwhen: ii
ii ii
a. Extent iiof iiwork iicannot iibe iifully iidetermined iior iiwhere iiactual iiquantities iicannot iibe
iiaccurately iicalculated. ii
b. Extent iiof iiwork iiis iiknown, iibut iithe iiowner iidesires iia iibreak-out iicost iifor iiportions iiof
iithe iiwork. ii
c. It iiis iianticipated iithat iibidders iiwill iinot iiexamine iisoil iibearing iireports iiprior iito
iisubmitting iibid. ii
d. Bidding iiquantities iiof iiequipment. ii
ii ii
,Review: iiPDPG ii7.1.6.2" ii- iiCORRECT iiANSWER-"a. iiExtent iiof iiwork iicannot iibe
iifully ii
ii
determined iior iiwhere iiactual iiquantities iicannot iibe iiaccurately
iicalculated.
ii ii
Use iiof iiunit iiprices, iiallowances iiand iialternates iishould iialways iibe iilimited iito iithose
iiitems iirequired iifor iiaccurate iibidding, iiin iiorder iito iikeep iibidding iidocuments iiand
iiprocesses iias iisimple iias iipossible." ii
ii
"The iicontractual iirelationship iigoverned iiby iithe iiConditions iiof iithe iiContract iiis iibetween:
ii
ii ii
ii
a. iiOwner iiand
iicontractor
ii
b. iiArchitect/engineer iiand
iicontractor
ii
c. iiOwner iiand
iiSubcontractors
d. iiOwner, iicontractor, ii and
iiarchitect/engineer
ii ii
Review: iiPDPG ii5.5 iiand ii11.3.9" ii- iiCORRECT iiANSWER-"a. iiOwner iiand iicontractor ii
ii ii
The iiowner iiand iithe iicontractor iiare iithe iiparties iito iithe iiconstruction iicontract, iihence
iithey ii
ii
are iisubject iito iithe iiConditions iiof iithe iiContract. iiYes, iithe iiduties iiof iithe iiarchitect
iiare
ii
described iiin iithe iiConditions iiof iithe iiContract, iibut iithey iiare iigoverned iiby iithe
iiseparate
ii
Owner/Architect iior iiOwner/Engineer
iiAgreement."
ii
How iilong iidoes iia iicontractor iirequired iito iiexecute iicorrections iiin iithe iiWork
iiafter ii
ii
Substantial iiCompletion? ii- iiCORRECT iiANSWER-one
iiyear
ii
"Which iiof iithe iifollowing iiwould iibe iiincluded iiin iiAvailable iiInformation? ii
ii ii
a. Bid iisecurity iirequirements ii
b. Environmental iiImpact iiStatement ii
c. Time iiof iicompletion iito iiconstruct iithe iiproject ii
d. Description iiof iithe iiWork ii
ii ii
Review: iiPDPG ii11.4.5" ii- iiCORRECT iiANSWER-"b. iiEnvironmental iiImpact iiStatement ii
ii ii
Available iiInformation iiis iithe iiplace iito iiprovide iireference iiinformation iisuch iias iithis iithat
iidoesn't iibelong iiin iithe iicontract. iiBid iisecurity iiinfo? iiIn iithe iiInstructions iifor iiProcurement.
ii
,Time iiof iiCompletion? iiIt's iicontractual ii- iiwhere iiwould iiyou iiput iiit? iiDescription iiof iiWork?
iiName iithe iiDivision ii01 iisection iiwhere iithat iibelongs." ii
ii
"Instructions iifor iiProcurement: ii
ii ii
a. Are iiused iionly iion iiprivate iiprojects ii
b. Frequently iiare iistandard iiindustry iiforms ii
c. May iiinclude iithe iigeotechnical iireport iias iian iiattachment ii
ii d. Are iibinding
Review: iiPDPG
iiupon iithe
ii11.4.4
iiContractor ii
" ii- iiCORRECT iiANSWER-"b. iiFrequently iiare iistandard iiindustry iiii iiii
iiforms
Both iiAIA iiand
iiEJCDC iioffer iistandard iiprinted iiInstructions iito iiBidders iiforms. iiIf iinecessary, iia
iiSupplementary iiInstructions iito iiBidders iican iicustomize iithe iiInstructions iito iisuit iispecial
iiproject iiconditions. ii
ii ii
Did iiyou iinotice? iiThe iiPDPG iiuses iithe iiterm ii""Instructions iifor iiProcurement"" iias iian
iiumbrella iiterm iifor iiboth iibid iiand iinegotiated iiprojects. iiMasterFormat iilists iiboth iiterms:
iiInstructions iifor iiProcurement, iiand iithe iimore iispecific iidocuments iiInstructions iito
iiBidders iior iiInstructions iito iiProposers." ii
ii
"Marked-up iior iicorrected iicontract iidrawings iithat iiindicate iichanges iiincorporated iiin
iithe ii
ii
Work
iiare:
ii ii
ii
a. iiContract
iiforms
ii
b. iiCloseout
iisubmittals
ii
c. iiRecord
iidrawings
ii
d. iiAs-
builts
e. iiNot iirequired iifor iiprivate
iiwork
ii ii
Review: iiPDPG ii11.2.3.5" ii- iiCORRECT iiANSWER-"c. iiRecord iidrawings ii
ii
These iidrawings iiincorporate iiall iiissued iimodifications iiand iisignificant iifield iichanges
iiin ii
ii
scope. iiThe iiterm ii""as-builts"" iiis iidiscouraged, iias iiwe iiare iioften iiunable iito iicertify
iithe
ii
accuracy iiof iiactual iiinstallations iiand iifield-recorded
iiinformation."
ii
, "Contractual iiclauses iiin iithe iiConditions iiof iithe iiContract: ii
ii ii
a. Have iipriority iiover iiDivision ii01 ii
b. Are iisuperseded iiby iiDivision ii01 ii
c. Are iiexpanded iiupon iiby iithe iiprovisions iiof iiDivision ii01 ii
d. Are iiindependent, iiand iiDivision ii01 iiprovisions iihave iino iieffect ii
ii
Review: iiPDPG ii11.2.9" ii- iiCORRECT iiANSWER-"c. iiAre iiexpanded iiupon iiby iithe
iiprovisions ii
ii
of iiDivision
ii01
ii ii
The iikey iiword iiis ii""expanded."" iiDivision ii01 iiGeneral iiRequirements iiare iidetailed. iiThey
iiaddress iiadministrative iiand iiprocedural iilevel iiissues. iiThe iiConditions iiof iithe iiContract
iisay: ii""Do iithis."" iiThe iiGeneral iiRequirements iisay: ii""Do iiit iilike iithis."" iiAnd iidon't iiforget
iithe iiconcept iiof ii""complementary iidocuments."" iiNo iiprovisions iihave iipriority iiover, iiare
iisuperseded iiby, iior iiare iiindependent iiof, iiother iiprovisions iiin iithe iicontract iidocuments ii-
iithey iiare ii""complementary.""" ii
ii
"In iithe iispecifications, iithe iistated iirequirements iiaddress: ii
ii ii
ii
a. iiThe ii owner's
iiresponsibilities
ii
b. iiThe ii contractor's
iiresponsibilities
c. iiThe ii subcontractor's
iiresponsibilities
d. iiThe ii architect's
iiresponsibilities
ii
e. iiAll iiof iithe
iiabove
ii
Review: iiPDPG ii11.3.4.3" ii- iiCORRECT iiANSWER-"b. iiThe iicontractor's iiresponsibilities ii
ii
The iiowner iiand iithe iicontractor iiare iithe iisole iiparties iito iithe iicontract. iiThe iirequirements
iiof ii
ii
the iispecifications iiaddress iithe iicontractor. iiOther iistatements iiregarding iiowner
iiand
ii
architect iiactivities iiserve iias iiinformation
iionly."
ii
What iidefines iisubstantial iicompletion iiof iithe iiWork? ii- iiCORRECT iiANSWER-when iithe ii
Work, iior iidesignated iiportions iiof iithe iiWork, iiare iisufficient iicomplete iiin iiaccordance iiwith
iithe iiContract iiDocuments iisuch iithat iithe iiOwner iimay iioccupy iior iiutilize iithe iiWork iifor iiits
iiintended iiuse. ii
ii