Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 21 pages
Exam (elaborations)

CDT exam Questions with Correct Answers (solved)

Document preview thumbnail
Preview 3 out of 21 pages

CDT exam Questions with Correct Answers (solved) CDT exam Questions with Correct Answers (solved) CDT exam Questions with Correct Answers (solved) CDT exam Questions with Correct Answers (solved) CDT exam Questions with Correct Answers (solved) CDT exam Questions with Correct Answers (solved) CDT exam Questions with Correct Answers (solved)

Content preview

CDT exam Questions with Correct
ii ii ii ii ii




Answers (solved) ii ii

ii
ii

1. iiThe iimethod iiof iicomputation iiof iiContractor's iioverhead iiand iiprofits iifor iiChange
iiOrder ii
ii
prices, iiwhere iiboth iiadditions iiand iideletions iiare iiinvolved, iiis iifound iiin
iithe:
ii
a)
iiAgreement.
ii
b) iiConditions iiof iithe

iiContract.
ii
c) iiDivision

ii01.
ii
d) iiInstructions iito iiBidders. ii- iiCORRECT iiANSWER-b) iiConditions iiof iithe
iiContract.
ii
ii
2. iiGeneral iiRequirements iiare iipart
iiof:
ii
a) iiSupplementary

iiConditions.
ii
b) iiBidding


iiRequirements.
ii
c)
iiSpecifications.


d) iiSummary iiof iiWork. ii- iiCORRECT ii ANSWER-c)
iiSpecifications.
ii

3. iiThe iithree iiessential iiconsiderations iiin iithe iievaluation iiof iia iiproduct iiare: ii
a) Requirements, iiCriteria, iiand iiTests. ii
b) Costs, iiMaintenance, iiand iiInstallation. ii
c) Life iiCycle iiCost, iiInstallation iiCost, iiand iiMaintenance iiCost. ii
d) Case iistudies, iiFailures, iiand iiProblems. ii- iiCORRECT iiANSWER-a) iiRequirements,
iiCriteria, iiand iiTests. ii
ii
ii
4. iiWhose iiresponsibility iiis iiit iito iifurnish iithe iiShop
iiDrawings?
ii
a) iiThe

iiArchitect/Engineer
ii
b) iiThe

iiContractor
ii
c) iiThe

iiOwner

,d) iiThe iiSubcontractor ii - ii CORRECT ii ANSWER-b) ii The
iiContractor
ii

5. iiThe iidivision iiof iithe iiWork iiamong iimultiple iiprime iiContracts iiis iidescribed
iiin:
ii
a) iiInstructions iito

iiBidders.
ii
b) iiSupplementary

iiConditions.
ii
c) iiDivision

ii01.
ii
d) iiSpecial iiConditions. ii- iiCORRECT iiANSWER-c) iiDivision
ii01.
ii

6. iiDuring iithe iiProject iiConception iiStage, iithe iiA/E iimay iibe iiretained iito: ii
a) Develop iioutline iispecifications ii
b) Describe iithe iicharacter iiof iithe iimechanical iisystem ii
c) Prepare iirenderings ii
d) Assist iiin iifinancial iifeasibility iistudies ii- iiCORRECT iiANSWER-d) iiAssist iiin iifinancial
iifeasibility iistudies ii
ii

7. iiWhat iiis iithe iimain iipurpose iiof iiMasterFormat? ii
a) for iischeduling, iivalue iimanagement, iirecording iiof iidesign iidata iiand iimanaging iicosts.
ii

b) used iiduring iithe iiplanning iistage iiof iia iiproject. ii
c) to iiorganize iithe iiProject iiManual, iireference iikeynotes iiand iidetailed iicost iiestimates. ii
d) when iithere iiis iia iistandardized iineed iifor iiinformation iito iiappear iiupon iieach iipage iiof iia
iiproject iimanual. ii- iiCORRECT iiANSWER-c) iito iiorganize iithe iiProject iiManual,

iireference iikeynotes iiand iidetailed iicost iiestimates. ii
ii

8. iiThe iiperson iiwho iibecomes iisecondarily iiliable iifor iianother's iidebt iior iiperformance iiis
iicalled iithe: ii

a) Guarantee ii
b) Warrantor ii
c) Guarantor ii
d) Warrantee ii- iiCORRECT iiANSWER-c) iiGuarantor ii
ii

9. iiIntegrated iiprojects iiare iidistinguished iiby iiall iiof iithe iifollowing iicharacteristics iiexcept: ii
a) Development iiof iivirtual iiproject iimodel iithrough iiinput iifrom iia iicollaborative iiteam ii
b) Trust-based iicollaboration iibetween iiproject iiteam iimembers ii
c) Maximized iiefficiency iithrough iidesign, iifabrication, iiand iiconstruction ii
d) "Just iias iineeded" iiteam iiinvolvement iito iireduce iiowner's iipre-construction iiexpenses ii-
iiCORRECT iiANSWER-d) ii"Just iias iineeded" iiteam iiinvolvement iito iireduce iiowner's

iipreconstruction iiexpenses ii
ii
ii
10. iiOutline iiSpecifications iiare iiwritten
iifor

, ii
a) iionly iiDivisions ii02-14 iiwhere iiactual iiproducts iiare
iidiscussed
ii

ii
b) iiDivisions ii01-
49
c) iionly iiDivisions ii01-14 ii(excluding iimechanical iiand
iielectrical)


d) iithe iiexclusive iiuse iiof iithe iiA/E ii- iiCORRECT iiANSWER-b) iiDivisions ii01-
49
ii

11. iiAn iiexample iiof iia iiMasterFormat iiLevel ii3 iispecification iiSection iiis: ii
a) 05 ii00 ii00 iiMetals. ii
b) 05 ii20 ii00 iiMetal iiJoists. ii
c) 05 ii21 ii00 iiSteel iiJoist iiFraming. ii
d) 05 ii21 ii19 iiOpen iiWeb iiSteel iiJoist iiFraming. ii- iiCORRECT iiANSWER-d) ii05 ii21 ii19
iiOpen iiWeb iiSteel iiJoist iiFraming. ii
ii

12. iiWhat iiactivities iitake iiplace iiin iithe iiProject iiConception iiStage? ii
a) The iiengineers iidevelop iithe iimechanical iiand iielectrical iisystems. ii
b) The iisite iiis iiselected iiand iithe iidemolition iiis iidone. ii
c) Feasibility iistudies iiand iibudget iiis iiset. ii
d) The iiprogram iiis iievaluated iiand iithe iiengineers iiare iiselected. ii- iiCORRECT
iiANSWER-c) iiFeasibility iistudies iiand iibudget iiis iiset. ii
ii

13. iiThe iidocument iirecommended iito iiorganize iipreliminary iiconstruction iiinformation iiinto
iia ii
ii
standard iiorder iion iithe iibasis iiof iisystems iiand iiassemblies
iiis:
ii
a)
iiMasterFormat
ii
b)
iiUniformat
ii
c) iiOutline

iiSpecifications


d) iiProject iiManual ii- iiCORRECT iiANSWER-b)
iiUniformat
ii

14. iiAll iidesign iiand iiconstruction iidrawings iican iibe iiclassified iias iione iiof iitwo iitypes iiof
iiviews: iia) iiNumeric iiand iigraphic. ii

b) Vertical iiand iihorizontal. ii
c) Scaled iiand iinonscaled. ii ii
d) Exterior iiand iiinterior. ii- iiCORRECT iiANSWER-c) iiScaled iiand iinonscaled. ii
ii

15. iiSubstitution iirequirements iiand iiprocedures iiduring iibidding ii
a) Are iinot iiallowed iiunder iimost iipublic iibidding iistatutes. ii
b) Are iimodified iiby iithe iiSupplementary iiConditions. ii

Document information

Uploaded on
July 29, 2025
Number of pages
21
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Edunursepro
4.0
(45)
Sold
179
Followers
10
Items
10385
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions