100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

FDOT Earthwork Level 1 Exam 2026 Questions and Answers

Rating
-
Sold
-
Pages
10
Grade
A+
Uploaded on
28-07-2025
Written in
2024/2025

FDOT Earthwork Level 1 Exam 2026 Questions and Answers

Institution
FDOT Plan Reading
Course
FDOT Plan Reading









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
FDOT Plan Reading
Course
FDOT Plan Reading

Document information

Uploaded on
July 28, 2025
Number of pages
10
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

FDOT Earthwork Level 1 Exam 2026
Questions and Answers

Basics covered in Level 1 - Answer -Nuclear Testing

Speedy Moisture

Report Forms

Earthwork has to do with the roadway in what way? - Answer -Earthwork is the

excavation and placement of soils and materials supporting the proposed roadway.

In Earthwork what is a lift? - Answer -6" of compacted depth at full width

In Earthwork what is a Lot? - Answer -A lot is 1 lift at 500 ft or within compacted

area. Isolated compaction operations are separate lots.

Sampling at the roadway is done for - Answer -Done for base, sub grade, and

embankment.

Sampling is determined how - Answer -generated with random numbers usually by

a Verification Inspector




©COPYRIGHT 2025, ALL RIGHTS RESERVED 1

, What is important about sampling at the roadway - Answer -Minimum of three

representative sample combined.

What is LIMS? - Answer -Laboratory Info Management System

The proctor theory is when compaction is achieved how - Answer -by inputting

energy to expel air and water in the soil voids

Compaction causes - Answer -An increase in unit weight, decrease in

compressibility and permeability.

The proctor is determined where and creates what - Answer -In a laboratory and

establishes a density standard to be used on the roadway

Lab proctors are created how - Answer -Material is gathered from the road and

prepared with different amounts of water then placed in molds and hammered

What is a modified proctor used in - Answer -It is used in base, sub grade, MSE

wall back fill materials

Modified proctors are created how - Answer -With a 10lb hammer(rammer) on a

18" drop with 56 blows per layers with 5 layers in total.

What is a standard proctor used in - Answer -It is used in embankment and

structure back fill materials



©COPYRIGHT 2025, ALL RIGHTS RESERVED 2

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EmillyCharlotte Howard Community College
View profile
Follow You need to be logged in order to follow users or courses
Sold
94
Member since
1 year
Number of followers
4
Documents
11816
Last sold
1 day ago
ALL-MAJOR.

On this page, you find all documents, package deals, and flashcards offered by seller Emilly Charlotte.

3.6

20 reviews

5
7
4
6
3
2
2
2
1
3

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions