Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 32 pages
Exam (elaborations)

: AIPM – DAU Acquisition Program Management Exam 2 – Full Question Bank with Accurate Answers and Key Terms

Document preview thumbnail
Preview 4 out of 32 pages

This document is a detailed study resource for Exam 2 of the AIPM (Acquisition Program Management) certification from DAU. It features hundreds of practice questions with accurate answers, covering advanced acquisition topics such as Performance-Based Logistics, PESHE, DT&E vs OT&E, market research, open systems, contract types, ESOH, the PPBE process, data rights, and the DoD Architecture Framework. It includes terminology, legal requirements, policy directives, and strategic planning tools relevant for managing DoD acquisition programs.

Content preview

AIPM- Exam 2 questions with accurate answers
A support strategy the Acquisition Logistician and the designated
Product Support Integrator (PSI) collaborate on for the best approach to
deliver a specific system readiness rate to the warfighter. Ans✓✓✓
Performance Based Logistics (PBL)


A system that communicates, assimilates, coordinates, analyzes,
interprets information, and provides decision support to military
commanders. Ans✓✓✓ Command, Control Communications,
Computers, and Intelligence (C4I)


Activities help protect and defend information and information systems
by ensuring their availability, integrity, authentication, confidentiality,
and non-repudiation. Ans✓✓✓ Information Assurance (IA)


Additional data that may be needed depending on the purpose and
objectives of a specific architecture. Ans✓✓✓ Supporting products


Address the broad areas of a contractor's proposal that will be reviewed
and assessed by the Government to form the basis for the contract award
decision. Ans✓✓✓ Evaluation factors


Allow attainment of operational performance requirements; help
measure performance and ensure system can meet MOEs/MOSs.
Ans✓✓✓ Critical Technical Parameters (CTPs)

,An acquisition policy requirement for all ACAT programs and requires
an analysis of: ESOH Compliance; Safety and Occupational Health;
Hazardous Materials Management; Pollution Prevention (P2); National
Environmental Policy Act (NEPA); Executive Order 13101?
. Ans✓✓✓ Programmatic Environmental, Safety, and Occupational
Health Evaluation (PESHE)


An integrated Gov-Contractor style of negotiation that relies on a team
approach to come to an agreement? Ans✓✓✓ Alpha contracting


Any previously developed items regardless of the source of development
and used exclusively for governmental purposes by federal, state, local,
or allied governments (may require minor modifications). Ans✓✓✓
NDIs (Non-Developmental Items)


Architecture is one that uses open specifications to define interfaces,
services and supporting formats. Allows applications to be more easily
used on different platforms and promotes interoperability, allowing
systems to interact with users in a consistent way. Ans✓✓✓ Open
Systems (OS)


Are GIGs required for all systems? Ans✓✓✓ Yes


As part of a program's pollution prevention strategy, the ESOH impacts
of a system shall be identified for which aspect of the system's life
cycle? Ans✓✓✓ Demilitarization and Disposal

,Operations & Support
Testing
Manufacturing


Because similar domains require similar architectures, a key
precondition for the development of a robust architecture is the use of
___________. Ans✓✓✓ Domain engineering.


Boundaries between a system end product and another external system
end product or between a human and the threat environment in which
the system products will be used or operated. Ans✓✓✓ External
interfaces


Boundaries between products within a system model that are controlled
by the developer or by the government's technical effort. Ans✓✓✓
Internal interfaces


Changes to the Service and agency POMs are documented in ______,
which is issued by the Secretary of Defense. Ans✓✓✓ Program
Decision Memorandum (PDM)


Chartered to promulgate policy and guidance for the safe development,
manufacturing, testing, transport, handling, storage, maintenance,
demilitarization, and disposal of ordnance/explosives worldwide.
Ans✓✓✓ DoD Explosive Safety Board (DDESB)

, Cost accounting standards relate to what? Ans✓✓✓ Allocability, not
allowability, of costs.


Created to ensure consistent description of architectures, to facilitate
communications, to be modular, reusable and decomposable. It uses
uniform terms and definitions and describes interoperability
requirements in consistent way. Ans✓✓✓ DoD Architecture Framework


Determine degree to which system is supportable in its intended
environment. Ans✓✓✓ Measures of Suitability (MOS)


Determine degree to which system performs its mission. Ans✓✓✓
Measures of Effectiveness (MOE)


Determines operational effectiveness and suitability as defined in the
Capability Development Document (CDD) and Capability Production
Document (CPD). Ans✓✓✓ Operational Test & Evaluation (OT&E)


Developmental Test and Evaluation (DT&E) does what? Ans✓✓✓
Measures technical performance against the design specifications.


Directs DoD and other Government agencies to use environmentally
responsible products and services ("Greening the Government"); also
implements cost-effective procurement preference programs favoring
enviornmentally responsible products and services. Ans✓✓✓ Executive
Order 13101

Document information

Uploaded on
July 26, 2025
Number of pages
32
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$18.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
cracker
3.8
(398)
Sold
2148
Followers
1347
Items
50029
Last sold
3 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions