Created By: A Solution
nn nn nn
Solutions Manual for Electrical nn nn nn
nn WiringCommercial18th Edition by Phil n nn nn nn
Simmons A+
nn nn
Solution and Answer Guide nn nn nn
SIMMONS/ODE, ELECTRICAL WIRING COMMERCIAL, 18E © 2024, 9780357767115;
N N N N N N N N N N N N NN
NN CHAPTER N N 1:COMMERCIAL N N BUILDING PLANS NN NN AND NN SPECIFICATIONS
TABLE N N OF N N CONTENTS
Review ................................................................................................................................... 1
Note to instructor: It is recommended that students
nn nn nn nn nn nn nn n n be required tonn nn
nn respond, where appropriate, nn n n n n with n n answers n n that n n are n n complete
nn sentences.
REVIEW
Refer to the National Electrical Code or the workingdrawings when necessary. Where
nn nn nn nn nn nn nn nn n nn nn nn
nn applicable, responses should be written in complete sentences.
nn nn nn nn nn nn nn
1. What section of a commercial building’s specification contains a list of contract
nn nn nn nn nn nn nn nn nn nn nn
nn documents?
Answer: A list of the contract documents is contained in General Clauses and Conditions.
nn nn nn nn nn nn nn nn nn nn nn nn nn
A listing of the Commercial Building contract documents is presented in this chapter
nn nn nn nn nn nn nn nn nn nn nn nn nn
A+ Page 1nn
,Created By: A Solution
nn nn nn
nn under the heading “Commercial Building Plans.” The instructor maywish to have the students
nn nn n nn nn n nn nn n nn nn nn nn
check over this listing and compare it with the plans provided.
nn nn nn nn nn nn nn nn nn nn nn
2. The requirement for temporarylight and power at the job site will be found in what
nn nn nn nn nn nn nn nn nn nn nn nn nn nn
nn portion of a commercial building’s specification?
nn nn nn nn nn
Answer: The Supplementary General Conditions specifies the job site requirements for
nn nn nn nn nn nn nn nn nn nn
nn temporary light and power. In some contracts, this electrical system becomes the responsibility
nn nn nn nn nn nn nn nn nn nn nn nn
of the general contractor; in other contracts, it is the electrical contractor’s responsibility to
nn nn nn nn nn nn nn nn nn nn nn nn nn nn
nn install and maintain the temporary electrical system. The instructor maywish to refer the
nn nn nn nn nn nn nn nn nn nn nn nn
student to NEC Article 590 and discuss the requirements in detail.
nn nn nn nn nn nn nn nn nn nn nn
A+ Page 2
nn
,Created By: A Solution
nn nn nn
3. The electrician uses the Schedule of Working Drawings for what purpose?
nn nn nn nn nn nn nn nn nn nn
Answer: The electrician uses the Schedule of Working Drawings to determine whether all of
nn nn nn nn nn nn nn nn nn nn nn nn nn
the drawings are at hand. The information on “the other sheets” may be very important,
nn nn nn nn nn nn nn nn nn nn nn nn nn nn nn
nn especially in coordinating with other contractors.
nn nn nn nn nn
4. Complete the following items by indicating the letter(s) designating the correct
nn nn nn nn nn nn nn nn nn nn
nn source(s) of information:
nn nn
No. Answer Item Information
4. Sections Ceiling height nn Sections, Sheet A6 nn nn
5. Electrical Electrical receptacle nn Electricalsymbolschedule,Chapter
nn symbol nn style nn 2,Figure 2–6 nn
nn schedul
e
6. Electrical Electricaloutlet Electrical layout drawings, Sheets nn nn nn
nn layout nn location El,E2, and E3
nn nn nn
nn drawin
gs nn
7. Elevations Exterior wall finishes nn nn Elevations, Sheets A4 and A5 nn nn nn nn
8. Site plan nn Grading elevations nn Site plan, Sheet A4
nn nn nn
9. Electrical gs nn
nn layout
nn drawin
A+ Page 3 nn
, Created By: A Solution
nn nn nn
Panelboard schedules
nn Electrical layout drawings, Sheet E4
nn nn nn nn
10. Architectural Room width
nn Architectural floor plan, Sheets Al,
nn nn nn nn
nn floor plan
nn A2,and A3
nn nn
11. Architectural Swing of door
nn nn Architectural floor plan, Sheets Al,
nn nn nn nn
nn floor plan
nn
A2,and A3
nn
12. Sections Viewfof finterior f wall
nn nn nn Sections, fSheetfA6
nn
A+ Page 4 nn
nn nn nn
Solutions Manual for Electrical nn nn nn
nn WiringCommercial18th Edition by Phil n nn nn nn
Simmons A+
nn nn
Solution and Answer Guide nn nn nn
SIMMONS/ODE, ELECTRICAL WIRING COMMERCIAL, 18E © 2024, 9780357767115;
N N N N N N N N N N N N NN
NN CHAPTER N N 1:COMMERCIAL N N BUILDING PLANS NN NN AND NN SPECIFICATIONS
TABLE N N OF N N CONTENTS
Review ................................................................................................................................... 1
Note to instructor: It is recommended that students
nn nn nn nn nn nn nn n n be required tonn nn
nn respond, where appropriate, nn n n n n with n n answers n n that n n are n n complete
nn sentences.
REVIEW
Refer to the National Electrical Code or the workingdrawings when necessary. Where
nn nn nn nn nn nn nn nn n nn nn nn
nn applicable, responses should be written in complete sentences.
nn nn nn nn nn nn nn
1. What section of a commercial building’s specification contains a list of contract
nn nn nn nn nn nn nn nn nn nn nn
nn documents?
Answer: A list of the contract documents is contained in General Clauses and Conditions.
nn nn nn nn nn nn nn nn nn nn nn nn nn
A listing of the Commercial Building contract documents is presented in this chapter
nn nn nn nn nn nn nn nn nn nn nn nn nn
A+ Page 1nn
,Created By: A Solution
nn nn nn
nn under the heading “Commercial Building Plans.” The instructor maywish to have the students
nn nn n nn nn n nn nn n nn nn nn nn
check over this listing and compare it with the plans provided.
nn nn nn nn nn nn nn nn nn nn nn
2. The requirement for temporarylight and power at the job site will be found in what
nn nn nn nn nn nn nn nn nn nn nn nn nn nn
nn portion of a commercial building’s specification?
nn nn nn nn nn
Answer: The Supplementary General Conditions specifies the job site requirements for
nn nn nn nn nn nn nn nn nn nn
nn temporary light and power. In some contracts, this electrical system becomes the responsibility
nn nn nn nn nn nn nn nn nn nn nn nn
of the general contractor; in other contracts, it is the electrical contractor’s responsibility to
nn nn nn nn nn nn nn nn nn nn nn nn nn nn
nn install and maintain the temporary electrical system. The instructor maywish to refer the
nn nn nn nn nn nn nn nn nn nn nn nn
student to NEC Article 590 and discuss the requirements in detail.
nn nn nn nn nn nn nn nn nn nn nn
A+ Page 2
nn
,Created By: A Solution
nn nn nn
3. The electrician uses the Schedule of Working Drawings for what purpose?
nn nn nn nn nn nn nn nn nn nn
Answer: The electrician uses the Schedule of Working Drawings to determine whether all of
nn nn nn nn nn nn nn nn nn nn nn nn nn
the drawings are at hand. The information on “the other sheets” may be very important,
nn nn nn nn nn nn nn nn nn nn nn nn nn nn nn
nn especially in coordinating with other contractors.
nn nn nn nn nn
4. Complete the following items by indicating the letter(s) designating the correct
nn nn nn nn nn nn nn nn nn nn
nn source(s) of information:
nn nn
No. Answer Item Information
4. Sections Ceiling height nn Sections, Sheet A6 nn nn
5. Electrical Electrical receptacle nn Electricalsymbolschedule,Chapter
nn symbol nn style nn 2,Figure 2–6 nn
nn schedul
e
6. Electrical Electricaloutlet Electrical layout drawings, Sheets nn nn nn
nn layout nn location El,E2, and E3
nn nn nn
nn drawin
gs nn
7. Elevations Exterior wall finishes nn nn Elevations, Sheets A4 and A5 nn nn nn nn
8. Site plan nn Grading elevations nn Site plan, Sheet A4
nn nn nn
9. Electrical gs nn
nn layout
nn drawin
A+ Page 3 nn
, Created By: A Solution
nn nn nn
Panelboard schedules
nn Electrical layout drawings, Sheet E4
nn nn nn nn
10. Architectural Room width
nn Architectural floor plan, Sheets Al,
nn nn nn nn
nn floor plan
nn A2,and A3
nn nn
11. Architectural Swing of door
nn nn Architectural floor plan, Sheets Al,
nn nn nn nn
nn floor plan
nn
A2,and A3
nn
12. Sections Viewfof finterior f wall
nn nn nn Sections, fSheetfA6
nn
A+ Page 4 nn