Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 1 out of 2 pages
Exam (elaborations)

FINAL MIS: Ch 9 Systems Development Life Cycle (SDLC) Questions and answers graded A+ 2025/2026

Document preview thumbnail
Preview 1 out of 2 pages

FINAL MIS: Ch 9 Systems Development Life Cycle (SDLC) Questions and answers graded A+ 2025/2026

Content preview

FINAL MIS: Ch 9 Systems Development
Life Cycle (SDLC)
Systems development life cycle (SDLC) - ANS-The overall process for developing information
systems from planning and analysis through implementation and maintenance

Planning phase - ANS-Establishes a high-level plan of the intended project and determines
project goals

Analysis phase - ANS-Involves analyzing end-user business requirements and refining project
goals into defined functions and operations of the intended system

Design phase - ANS-Establishes descriptions of the desired features and operations of the
system including screen layouts, business rules, process diagrams, pseudo code, and other
documentation

Development phase - ANS-Involves taking all of the detailed design documents from the design
phase and transforming them into the actual system

Testing phase - ANS-Involves bringing all the project pieces together into a special testing
environment to eliminate errors and bugs, and verify that the system meets all of the business
requirements defined in the analysis phase

Implementation phase - ANS-Involves placing the system into production so users can begin to
perform actual business operations with it

Alpha Testing - ANS-Access if the entire system meets the design requirements of the users

Development Testing - ANS-tests the system to ensure it is bug-free

Integration Testing - ANS-verifies that separate systems can work together passing data back
and forth correctly

System Testing - ANS-Verifies that the units or pieces of code function correctly when integrated

User Acceptance Testing (UAT) - ANS-determines if the system satisfies the user and business
requirements

Unit Testing - ANS-tests individual units or pieces of code for a system

Parallel Implementation - ANS-uses both the legacy system and new system until all users
verify that the new system functions correctly

Document information

Uploaded on
July 19, 2025
Number of pages
2
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$11.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
1
Followers
0
Items
638
Last sold
1 year ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions