100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

QSP Course Test Questions with Verified Answers Graded A+

Rating
-
Sold
-
Pages
6
Grade
A+
Uploaded on
18-07-2025
Written in
2024/2025

What does this permit regulate?: Discharges of pollutants in storm water as- sociated with construction activity (storm water discharges) to waters of the united states from construction site that disturb one or more acres of land surface, or that are part of a common plan of development or sale that disturbs more than one acre of land surface. 2. The person in charge of the utility company, municipality, or other public or private company or agency that owns or operates the may also serve as the LRP.: LUP 3. Sediment basins, at a minimum, shall be designed according to the CASQA Construction BMP Guidance Handbook.: True 4. In the RUSLE equation, "P" stands for: Management operations and support practices. 5. Management operations and support practices.: Management operations and support practices. 6. When does r

Show more Read less
Institution
QSP Course
Course
QSP Course









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
QSP Course
Course
QSP Course

Document information

Uploaded on
July 18, 2025
Number of pages
6
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

QSP Course Test Questions with Verified Answers Graded A+

1. What does this permit regulate?: Discharges of pollutants in storm
water as- sociated with construction activity (storm water discharges) to waters
of the united states from construction site that disturb one or more acres of land
surface, or that are part of a common plan of development or sale that disturbs
more than one acre of land surface.
2. The
person in charge of the utility company, municipality, or other public or
private company or agency that owns or operates the may also
serve as the LRP.: LUP
3. Sediment basins, at a minimum, shall be designed according to the
CASQA Construction BMP Guidance Handbook.: True
4. In the RUSLE equation, "P" stands for: Management operations and
support practices.
5. Management operations and support practices.: Management
operations and support practices.
6. When does risk level one has to sample?: When required for non-
visible pollutants.
7. ATS instruments shall record which of the following?: Flow, turbidity, and p
8. Which factor(s) of RUSLE can be based on site-specific analysis
rather than maps?: K and LS
9. Failure to obtain coverage under the permit for storm water
discharges to waters of the US is a violation of the: Clean Water Act and
California Water Code
10. For traditional construction projects the LRP may be: The person
who possesses real properly interest in the land upon which the construction
1/6

, QSP Course Test Questions with Verified Answers Graded A+
activities will occur for the regulated site
11. What does NTU measure?: a measurement of optical properties of a liquid
that cause light rays to be scattered and absorbed rather than transmitted in
straight lines through a sample.
12. Inspection Records have to be kept until the project is complete or
three years, whichever comes first.: False
13. Which factor(s) of RUSLE must be changed to recalculate risk
when the construction duration has changed?: R
14. BMP stands for: Best Management Practice
15. Do type 1 LUPs typically have a high potential to impact storm quality?: N
16. What does RUSLE stand for?: Revised Universal Soil Loss Equation
17. A discharger must notify the Regional Water Boards if there are
planned changes in the construction activity that: May result in non-
compliance
18. A qualifying storm event is: A rain even that produces 1/2 inch or
more of precipitation with a period of 48 hours or more between rain events.

19. Continuous monitoring (no less than 15-min intervals) of ATS is
required for::
20. Rain Event Action Plan must be developed by a QSD: False
21. The CGP allows for not monitoring under what conditions?:
Dangerous weather conditions, unsafe storm event, and outside of
scheduled operations.
22. What is the difference between erosion and sedimentation?: Erosion
is the dislodging and transport of soil and sedimentation is the deposition of
material.
2/6

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MERCYTRISHIA Howard Community College
View profile
Follow You need to be logged in order to follow users or courses
Sold
181
Member since
1 year
Number of followers
35
Documents
10792
Last sold
23 hours ago
MercyTrishia

On this page, you find all documents, package deals offered by seller MercyTrishia

3.8

37 reviews

5
16
4
7
3
10
2
0
1
4

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions