100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

ACI Concrete Field Testing Technician – Grade 1 Final & Practice Exam 2025 – Complete Verified Questions with Detailed Answers

Rating
5.0
(1)
Sold
1
Pages
55
Grade
A+
Uploaded on
17-07-2025
Written in
2024/2025

This document includes the full set of final and practice exam questions for the 2025 ACI Concrete Field Testing Technician Grade 1 certification, complete with verified and detailed ASTM-based answers. Topics cover ASTM standards such as C172, C1064, C143, C138, and C231, with focus areas including sampling, slump testing, air content measurement, temperature determination, density calculations, and consolidation procedures. All questions are referenced with standard clauses, making this an essential, accurate, and up-to-date study guide for exam preparation.

Show more Read less
Institution
ACI Concrete Field-Testing Technician
Course
ACI Concrete Field-Testing Technician











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ACI Concrete Field-Testing Technician
Course
ACI Concrete Field-Testing Technician

Document information

Uploaded on
July 17, 2025
File latest updated on
July 23, 2025
Number of pages
55
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

​ CI Concrete Field Testing Technician – Grade 1 Final​
A
​& Practice Exam 2025 – Complete Verified Questions​
​with Detailed Answers​
​ 1. Start molding specimens​​for strength tests within 30 minutes​
Q
​after fabricating the composite sample.​


​A.​ ​True​
​B.​ ​False​

​B.​​False​

​ STM C172 -Para (4.1.2) - Start​
A
​molding. specimens for strength tests​
​within 15 min after fabricating the​
​composite sample.​


​ 2. The maximum allowable time between obtaining the first and​
Q
​last portions of the composite sample may not exceed 5 minutes.​


​A.​ ​True​
​B.​ ​False​

​B.​​False​

​ STM C172 - Para (4.1)- The elapsed time shall not exceed 15 min.​
A
​between obtaining the first and final portions of the composite sample.​

,​ 3. The composite concrete sample must be protected from sun,​
Q
​wind, contamination and rapid evaporation.​


​A.​ ​True​
​B.​ ​False​

​A.​​True​

​ASTM C172 - Para (4.1.2)​


​ 4. If the concrete contains aggregates larger than those that are​
Q
​appropriate for a size of mold or equipment used, the sample should​
​be wet sieved before making the test.​


​A.​ ​True​
​B.​ ​False​

​A.​​True​

​ASTM C172- Para (6.1)​


​ 5. The composite sample should not be remixed before beginning​
Q
​any tests.​
​A.​ ​True​
​B.​ ​False​

​B.​​False​

​ STM C172-Para (4.1.1) -The sample shall be combined and remixed with​
A
​a shovel the minimum amount necessary to ensure uniformity and​
​compliance with the maximum time limits​

, ​ 6. Sampling should normally be performed, as the concrete is​
Q
​discharged from the mixer.​


​A.​ ​True​
​B.​ ​False​

​B. False​

​ STM C172-Para (5). NOTE 2—Sampling should normally be performed as​
A
​the concrete is delivered from the mixer.​

​ o the conveying vehicle used to transport the concrete to the forms;​
T
​however, specifications may require other points of sampling, such as​
​the discharge of a concrete pump.​


​ 7. ASTM Method C172 includes sampling from stationary mixers,​
Q
​paving mixers, truck mixers, agitators, and non-agitating​
​equipment.​


​A.​ ​True​
​B.​ ​False​

​A. True​

​ASTM C172- Para (1.1)​


​ 8. After sampling is completed, start the tests for slump and air​
Q
​content within:​


​A.​ ​2 ½ minutes​
​B.​ ​10 minutes​
​C.​ ​15 minutes​

, ​D.​ ​None of the above​

​D.​​None of the above​

​ STM C172- Para (4.1.2) Start tests for slump, temperature, and air​
A
​content within 5 min after obtaining the final portion of the composite​
​sample.​

​Q9. In any case, do not obtain samples until:​


​A.​ ​All the water and admixtures have been added to the concrete​
​B.​ ​200 revolutions of the drum have been obtained​
​C.​ ​½ of the water has been added​
​D.​ ​None of the above​

​A.​​All the water and admixtures have been added to the concrete.​

​ STM C172- Para (5.2.3). In any case do not obtain samples until after all​
A
​of the water has been added to the mixer.​


​ 10. No samples shall be taken before_________ or after_________ of​
Q
​the batch has been discharged.​


​A.​ ​10% or after 90%​
​B.​ ​20% or after 90%​
​C.​ ​20% or after 80%​
​D.​ ​None of the above​

​A.​​10% or after 90%​

​ASTM C172- Para (5.2.1).​

Reviews from verified buyers

Showing all reviews
5 months ago

5 months ago

Thank you for the review, I appreciate your feedback and feel free to reach out for more resourceful documents. All the best in your studies.

5.0

1 reviews

5
1
4
0
3
0
2
0
1
0
Trustworthy reviews on Stuvia

All reviews are made by real Stuvia users after verified purchases.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ScholarSphere Keiser University (Port Saint Lucie)
View profile
Follow You need to be logged in order to follow users or courses
Sold
104
Member since
1 year
Number of followers
15
Documents
2641
Last sold
4 days ago
Premium Exam Elaborations for Global Learners

4.0

32 reviews

5
20
4
4
3
1
2
2
1
5

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions