100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

WGU C215 STUDY GUIDE 2025 EXAM TEST QUESTIONS WITH 100% APPROVED CORRECT ANSWERS GRADED A+ FIRST CLASS PASS

Rating
-
Sold
-
Pages
5
Grade
A+
Uploaded on
14-07-2025
Written in
2024/2025

WGU C215 STUDY GUIDE 2025 EXAM TEST QUESTIONS WITH 100% APPROVED CORRECT ANSWERS GRADED A+ FIRST CLASS PASS 2025 EXAM  WGU C215 STUDY GUIDE 2025 EXAM TEST QUESTIONS WITH 100% APPROVED CORRECT ANSWERS GRADED A+ FIRST CLASS PASS Total Quality Management (TQM) Philosophy - CORRECT ANSWER 1. customer focus 2. continuous improvement 3. employee empowerment 4. use of quality tools 5. product design 6. process management 7. managing supplier quality Process Capability Index (Cpk) - CORRECT ANSWER Basic function of Six Sigma. Measures the process potential and performance of processes. The higher the range of Cpk, the improved is the ability of the process to complete its necessities. Uses both the process variability and the process specifications to determine whether the process is "capable." Six Sigma - CORRECT ANSWER A disciplined, data-driven approach and methodology for eliminating defects (driving toward six standard deviations between the mean and the nearest specification limit) in any process - from manufacturing to transactional and from product to service. Design Capacity - CORRECT ANSWER The theoretical maximum output of a system in a given period under ideal conditions. Effective Capacity - CORRECT ANSWER The capacity a firm expects to achieve given its current operating constraints. Location Analysis - CORRECT ANSWER proximity to customers, transportation, source of labor, community attitude, proximity to suppliers, and many other factors. Line Processes - CORRECT ANSWER A type of process used to produce a large volume of a standardized product. Batch Processes - CORRECT ANSWER A type of process used to produce a small quantity of products in groups or batches based on customer orders or specifications. Project Processes - CORRECT ANSWER A type of process used to make a one-at-a-time product exactly to customer specifications. Continuous Processes - CORRECT ANSWER A type of process that operates continually to produce a high volume of a fully standardized product. Bottleneck - CORRECT ANSWER Longest task in the process. Flexible Manufacturing System (FMS) - CORRECT ANSWER A type of automated system that combines the flexibility of intermittent operations with the efficiency of continuous operations. Output/Input Control - CORRECT ANSWER A technique for monitoring the flow of jobs between work centers.

Show more Read less
Institution
WGU C215
Course
WGU C215









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
WGU C215
Course
WGU C215

Document information

Uploaded on
July 14, 2025
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • continuous improvement

Content preview

WGU C215 STUDY GUIDE 2025 EXAM TEST
QUESTIONS WITH 100% APPROVED
CORRECT ANSWERS GRADED A+ FIRST
CLASS PASS



2025 EXAM




A +

, PDF: GRADED A+ EXAM


WGU C215 STUDY GUIDE 2025 EXAM TEST
QUESTIONS WITH 100% APPROVED
CORRECT ANSWERS GRADED A+ FIRST
CLASS PASS
Total Quality Management (TQM) Philosophy - CORRECT ANSWER 1.
customer focus
2. continuous improvement
3. employee empowerment
4. use of quality tools
5. product design
6. process management
7. managing supplier quality

Process Capability Index (Cpk) - CORRECT ANSWER Basic function of Six
Sigma. Measures the process potential and performance of processes. The higher
the range of Cpk, the improved is the ability of the process to complete its
necessities. Uses both the process variability and the process specifications to
determine whether the process is "capable."

Six Sigma - CORRECT ANSWER A disciplined, data-driven approach and
methodology for eliminating defects (driving toward six standard deviations
between the mean and the nearest specification limit) in any process - from
manufacturing to transactional and from product to service.

Design Capacity - CORRECT ANSWER The theoretical maximum output of a
system in a given period under ideal conditions.

Effective Capacity - CORRECT ANSWER The capacity a firm expects to achieve
given its current operating constraints.

Location Analysis - CORRECT ANSWER proximity to customers, transportation,
source of labor, community attitude, proximity to suppliers, and many other
factors.



2
$11.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
Hashishteachme2

Get to know the seller

Seller avatar
Hashishteachme2 Stanford University
View profile
Follow You need to be logged in order to follow users or courses
Sold
0
Member since
9 months
Number of followers
0
Documents
272
Last sold
-
HASHISH TEACH ME2 EXAM STORE WHERE I HELP YOU TO STUDY SMART BUT NOT HARD

Hashish teach me2 exam store provides you with exam test questions with 100% verified answers. All exams documents, flashcards and package deal are available with their answers certified to make you pass in you exams and also help you complete your assignment. DO NOT STURDY HARD STUDY SMART

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions