FINAL ESTIMATES LEVEL 2: Complete Q&A with Verified Solutions 2025/2026
On multi FIN project numbers under one contract, the Asphalt is reported on the certification, by the CONTRACTOR, under what Project FIN Number? - ️️The Contractor shows the Asphalt on the lead FIN project number A roadway is being constructed and has a Subsoil Excavation Quantity of 835 CY, a Regular Excavation Quantity of 250 CY and an embankment Quantity of 1040 CY. Based upon this information, the Final Quantity to be paid for embankment will be? - ️️1875 CY Which Document is used to authorize payment from original contingency Amount? - ️️Work Order Friction Course (FC-12.5) Straight edge Deficiency: A straightedge deficiency was left in place at no pay. Calculate the equivalent tonnage at no pay. ( pay to appropriate accuracy) Gmm= 2.417, thickness =1.5 inches, road width =12 feet, length of deficiency = 5 ft. (this occurred 25 feet from the bridge deck) - ️️8.4 Tons Overruns or Underruns must be explained when? - ️️A pay item overruns or underruns $10,000 or more. Prices are adjusted on each progress estimate to reflect increases or decreases in the price of fuel for contracts with original Contract Time: - ️️In excess of 120 calendar days.
Written for
- Institution
- FDOT Asphalt
- Course
- FDOT Asphalt
Document information
- Uploaded on
- July 14, 2025
- Number of pages
- 8
- Written in
- 2024/2025
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
final estimates level 2 complete qa with verifie
Also available in package deal