Authorization Exam 1 Practice
Questions And Correct Answers
(Verified Answers) Plus Rationales 2025
Q&A | Instant Download PDF
1. What is the primary purpose of the Homeowner Protection Act in
British Columbia?
A. To regulate the sale of building materials
B. To protect new home buyers and ensure minimum construction
standards
C. To enforce energy efficiency in all homes
D. To mandate training for all tradespersons
The Act is designed to protect buyers of new homes and improve the
quality of residential construction.
,2. How long is an Owner Builder Authorization valid after it is issued?
A. 1 year
B. 3 years
C. 18 months
D. 5 years
An Owner Builder Authorization is valid for 18 months, during which
construction must begin.
3. Which of the following is NOT required when applying for an Owner
Builder Authorization?
A. Proof of land ownership
B. A certified blueprint from an architect
C. Government-issued ID
D. Declaration of intent to build for personal use
Blueprints are not a requirement for the authorization application
itself.
4. Which agency regulates the Owner Builder program in BC?
A. BC Housing
B. Licensing and Consumer Services (LCS)
C. BC Hydro
D. Municipal Building Authority
Licensing and Consumer Services, a branch of BC Housing,
administers the program.
,5. What is the maximum number of homes an individual can build as an
Owner Builder in BC in their lifetime?
A. One every 2 years
B. Two homes total
C. One home every 10 years
D. Unlimited homes
Owner Builders are limited to constructing one home every 10 years.
6. Which of the following is a legal requirement for all new homes built
by Owner Builders in BC?
A. They must be sold within a year
B. They must be occupied by the Owner Builder
C. They must have solar panels
D. They must be rented to a tenant
Owner Builders must personally occupy the home for at least one
year.
7. Which of the following is a key function of the building envelope?
A. Aesthetic appearance
B. Provides structural strength
C. Protects the home from water and air penetration
D. Controls electrical load
The building envelope protects the interior of the home from
environmental conditions.
, 8. What is the first step when planning to build a home as an Owner
Builder in BC?
A. Hire a contractor
B. Start excavation
C. Apply for mortgage
D. Apply for Owner Builder Authorization
The authorization must be obtained before any construction begins.
9. How long must an Owner Builder live in the home before they are
legally allowed to sell it without a warranty?
A. 6 months
B. 12 months
C. 18 months
D. 24 months
Owner Builders must occupy the home for at least 12 months before
selling it.
10. Which of the following trades is typically responsible for the
proper installation of vapor barriers?
A. Electrician
B. Plumber
C. Framer or general contractor
D. Roofer
The builder or general contractor typically ensures vapor barriers are
correctly installed.