CONSTRUCTION MANAGEMENT EXAM 1 QUESTIONS AND ANSWERS What are some concerns of a Resident Project Representative or an inspector with respect to his or her project during the construction phase? - CORRECT ANSWERContract administration Job cost control Contract time & delays Quality assurance Test records & reports Acceptance of work Verify payments due Process Change Orders Contractor submittals Field engineering Documentation Safe job conditions Coordination of work Project closeout

Show more Read less
Institution
CONSTRUCTION MANAGEMENT
Course
CONSTRUCTION MANAGEMENT









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CONSTRUCTION MANAGEMENT
Course
CONSTRUCTION MANAGEMENT

Document information

Uploaded on
July 10, 2025
Number of pages
14
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CONSTRUCTION MANAGEMENT EXAM 1 QUESTIONS AND
ANSWERS
What are some concerns of a Resident Project Representative or an inspector with respect to his or her
project during the construction phase? - CORRECT ANSWER✅✅Contract administration

Job cost control

Contract time & delays

Quality assurance

Test records & reports

Acceptance of work

Verify payments due

Process Change Orders

Contractor submittals

Field engineering

Documentation

Safe job conditions

Coordination of work

Project closeout



2. What type of organizational structure is best suited for fast-track construction? - CORRECT
ANSWER✅✅Design Build



3. Under a construction management (CM) contract, should the CM firm's responsibilities normally
begin at the construction phase, the design phase, the planning phase, or the conceptual phase? -
CORRECT ANSWER✅✅Design phase



chegg says planning?



4. A design-build firm may be (check all that apply): - CORRECT ANSWER✅✅X (a) a single firm with both
design and construction capability;

x (b) a joint venture contract between a contractor and a design firm;

, x (c) a design firm that subcontracts the construction portion to a construction contractor;

x (d) a construction contracting firm that subcontracts the design work to an architect or eng firm.



5. True or false? Under the Partnering concept, all differences are intended to be resolved at the lowest

management level—preferably at the project site. - CORRECT ANSWER✅✅True



6. What types of relationships are intended to be established under a Partnering agreement? - CORRECT
ANSWER✅✅Working relationships (as opposed to legal relationships under contracts), through a
formal strategy of commitment and communication.



7. What are the five steps necessary to set up a Partnering workshop? - CORRECT ANSWER✅✅!)
Creation of a Partnering charter

2) Development of an issue-resolution process

3) Development of a joint evaluation process

4) Discussion of individual roles and concerns

5) Presentation of facilitated workshop



8. Is Partnering a totally informal process, or should it be addressed in the specifications? - CORRECT
ANSWER✅✅It should be addressed in the specifications:

"The objectives are effective and efficient contract performance, intended to achieve completion within
budget, on schedule, and in accordance with plans and specifications"



Chegg says informal?

-> Pretty sure there's no way that's right, there is Fig 1.10 - Example of Specifications Provision for
Partnering from a DOT Specification (pg 19)



9. True or false? Under the CQC process, inspection is provided by the contractor. - CORRECT
ANSWER✅✅true



10. What is the five-step process of initiating a project? Name each of the steps in proper order. -
CORRECT ANSWER✅✅Advertise for bids

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
STANGRADES Stanford University
View profile
Follow You need to be logged in order to follow users or courses
Sold
47
Member since
1 year
Number of followers
1
Documents
9400
Last sold
3 days ago
STAN-GRADES

EXCELLENCY IN ACADEMIC MATERIALS

3.2

10 reviews

5
3
4
1
3
3
2
1
1
2

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions