Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 58 pages
Exam (elaborations)

CATEGORY 3 NON-CAB OPERATED TEST / ACTUAL EXAM QUESTIONS AND COMPLETE ANSWERS (A+ GUIDE SOLUTION) NEWEST 2025/2026

Document preview thumbnail
Preview 4 out of 58 pages

CATEGORY 3 NON-CAB OPERATED TEST / ACTUAL EXAM QUESTIONS AND COMPLETE ANSWERS (A+ GUIDE SOLUTION) NEWEST 2025/2026 _____________Quiz____________? Bridge cranes with rated capacities of 20,000 lbs. or greater are classified as ______ cranes - Answer Category 2 _____________Quiz____________? The expiration date that is of particular importance to crane operators is - Answer The certification expiration date of the crane _____________Quiz____________? Who is primarily responsible for evaluating a Crane Operators physical and emotional fitness - Answer crane operator _____________Quiz____________? A monorail hoist with less than 20,000 lbs. capacity is a ________________ crane. - Answer Category 3

Content preview

General Crane Safety / Comprehensive
Study Guide Questions and Answers

_____________Quiz____________?

The minimum crane team for a mobile crane on outriggers would consist of-

A) The Crane Operator, Rigger Supervisor, and Crane Rigger

B) The Crane Operator, Crane Supervisor, Rigger Supervisor, and

Crane Rigger

C) The Crane Operator, Crane Supervisor, and Crane Rigger

D) The Crane Operator and Rigger-in-Charge

E) The Crane Operator, Crane Walker, and Crane Rigger -

Answer✓✓

C) The Crane Operator, Crane Supervisor, and Crane Rigger



_____________Quiz____________?

When operating floating cranes, you must start swinging or rotating quickly and stop smoothly

to prevent excessive barge list.

A) True

B) False -

Answer✓✓

B) False




1

,_____________Quiz____________?

Extending a telescoping boom without lowering the hoist may result in "two-blocking" the

crane.

A) True

B) False -

Answer✓✓

A) True



_____________Quiz____________?

All of the following require a license to operate EXCEPT a(n)-

A) Cab-operated category 3 bridge crane

B) Mobile hydraulic truck crane

C) Non-cab operated category 3 bridge crane

D) Articulating boom category 4 crane

E) Floor-operated category 2 bridge crane -

Answer✓✓

C) Non-cab operated category 3 bridge crane



_____________Quiz____________?

Which of the following lift types would NOT be considered a complex lift?

A) Multiple-crane lifts

B) Oxygen/Acetylene bottles in racks designed for lifting


2

,O C) Large geometric shapes

D) Loads with multi-level attachment points

E) Hazardous or explosive materials -

Answer✓✓

B) Oxygen/Acetylene bottles in racks designed for lifting



_____________Quiz____________?

What is the minimum amount of rope that shall be on a grooved drum and a smooth drum?

A) There is no minimum

B) 4 full wraps, 2 full wraps

C) 2 full wraps, 3 full wraps

D) 6 full wraps, 4 full wraps

E) 1 full wrap, 2 full wraps -

Answer✓✓

B) 4 full wraps, 2 full wraps



_____________Quiz____________?

The horizontal distance from the center of rotation of the crane to the center of the hoist line(s)

with load applied is called

A) Boom Length

B) Radius

C) Lift Zone


3

, D) Quadrant

E) Circumference -

Answer✓✓

B) Radius



_____________Quiz____________?

What is two-blocking, and why is two-blocking dangerous?

A) Two-blocking occurs when the hook contacts another block or hook on the crane. It is

dangerous because the hook could damage the crane, causing loss of load control.

B) Two-blocking occurs when the block or hook contacts the ground.

It is dangerous because the wire rope may come off of the drum and drop the block.

C) Two-blocking occurs when the hook block comes in contact with the upper sheave block

during hoisting of the hook. It is dangerous because it could result in damage to the crane,

parting of the hoist lines, and dropping the load. -

Answer✓✓

C) Two-blocking occurs when the hook block comes in contact with the upper sheave block

during hoisting of the hook. It is dangerous because it could result in damage to the crane,

parting of the hoist lines, and dropping the load.



_____________Quiz____________?

When should a tagline be used during lifting operations?

A) when lifting a load over or near electrical transmission lines


4

Document information

Uploaded on
July 7, 2025
Number of pages
58
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.49
Purchased by 0 students

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Exampage
4.5
(2020)
Sold
6036
Followers
19
Items
1636
Last sold
2 weeks ago

Reviews from verified buyers



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions