Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

CM 3112 BIM EXAM COMPLETE QUESTIONS WITH CORRECT VERIFIED ANSWERS UPDATED 2025/2026 VERSION|| ALREADY GRADED SOLUTIONS FOR A 100% GUARANTEED PASS

Rating
-
Sold
-
Pages
3
Grade
A+
Uploaded on
05-07-2025
Written in
2024/2025

CM 3112 BIM EXAM COMPLETE QUESTIONS WITH CORRECT VERIFIED ANSWERS UPDATED 2025/2026 VERSION|| ALREADY GRADED SOLUTIONS FOR A 100% GUARANTEED PASS!!! 1. What is the full form of NBIMS? - ANSWER National Building Information Modeling Standards 2. CAD cannot automate and accelerate the drafting process. - ANSWER false 3. The BIM plan is not meant to help the organizations to understand their roles and responsibilities in the implementation - ANSWER false 4. On most projects, one meeting is enough to develop the overall BIM plan. - ANSWER false 5. Visual validation for payment approval cannot be performed using 4D scheduling model in BIM. - ANSWER - 6. At the end of the planning phase, valuable information can be used by the facility operator for asset management, space planning, and maintenance scheduling to improve the overall performance of the facility or a portfolio of facilities. - ANSWER False 7. ____ can facilitate automated building checking. - ANSWER BIM 8. Defining specific implementation areas and uses for BIM is more important than focusing on whether or not to use BIM in general. - ANSWER True 9. 5D cost model in BIM can be used for value engineering. - ANSWER - 10. BIM is a non-parametric 3D model that helps document the design of a building. - ANSWER True 11. How many uses of BIM have been identified by the BIM Project Execution Planning guide? - ANSWER 25 12. Drawings or plans in CAD consist mainly of ____, ____, and ____. - ANSWER lines, circles, arcs 13. Ineffective planning of BIM implementation can result in increased costs for the modeling services, schedule delays due to missing information, and little to no added value. - ANSWER True 14. Project phasing simulations can be performed using 3D visualization model in BIM. - ANSWER - 15. BIM process design clearly illustrated the execution process through the use of process maps. - ANSWER True 16. The Project Manager always develops the BIM Plan. - ANSWER False 17. During the BIM execution process, a low-level map is initially developed to help team members clearly understand how their work processes interact with the processes performed by other team members. - ANSWER False 18. The goal of the NBIMS-US is to identify and define standard information exchanges that are required on facility projects. - ANSWER True

Show more Read less
Institution
CM 3112
Course
CM 3112

Content preview

CM 3112 BIM EXAM COMPLETE
QUESTIONS WITH CORRECT
VERIFIED ANSWERS UPDATED
2025/2026 VERSION|| ALREADY
GRADED SOLUTIONS FOR A 100%
GUARANTEED PASS!!!

1. What is the full form of NBIMS? - ANSWER ✓ National Building
Information Modeling Standards

2. CAD cannot automate and accelerate the drafting process. -
ANSWER ✓ false

3. The BIM plan is not meant to help the organizations to understand
their roles and responsibilities in the implementation - ANSWER ✓
false

4. On most projects, one meeting is enough to develop the overall BIM
plan. - ANSWER ✓ false

5. Visual validation for payment approval cannot be performed using 4D
scheduling model in BIM. - ANSWER ✓ -

6. At the end of the planning phase, valuable information can be used
by the facility operator for asset management, space planning, and
maintenance scheduling to improve the overall performance of the
facility or a portfolio of facilities. - ANSWER ✓ False

7. ____ can facilitate automated building checking. - ANSWER ✓ BIM

Written for

Institution
CM 3112
Course
CM 3112

Document information

Uploaded on
July 5, 2025
Number of pages
3
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.59
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SmartscoreAaron Chicago State University
View profile
Follow You need to be logged in order to follow users or courses
Sold
83
Member since
1 year
Number of followers
6
Documents
4146
Last sold
3 days ago
SMARTSCORES LIBRARY

Get top-tier academic support for Psychology, Nursing, Business, Engineering, HRM, Math, and more. Our team of professional tutors delivers high-quality homework, quiz, and exam assistance—ensuring scholarly excellence and grade-boosting results. Trust our collaborative expertise to help you succeed in any course at U.S.A Institutions.

3.1

7 reviews

5
3
4
1
3
0
2
0
1
3

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions