CM 3112 Building Information Modeling EXAM COMPLETE QUESTIONS WITH CORRECT VERIFIED ANSWERS UPDATED 2025/2026 VERSION|| ALREADY GRADED SOLUTIONS FOR A 100% GUARANTEED PASS

Rating
-
Sold
-
Pages
18
Grade
A+
Uploaded on
05-07-2025
Written in
2024/2025

CM 3112 Building Information Modeling EXAM COMPLETE QUESTIONS WITH CORRECT VERIFIED ANSWERS UPDATED 2025/2026 VERSION|| ALREADY GRADED SOLUTIONS FOR A 100% GUARANTEED PASS!!! 1) Defining specific implementation areas and uses for BIM is more important than focusing on whether or not to use BIM in general. - ANSWER True 2) BIM can carry some level of additional process risk due to inexperience and unfamiliarity. - ANSWER True 3) The goal of the NBIMS-US is to identify and define standard information exchanges that are required on facility projects. - ANSWER True 4) Ineffective planning of BIM implementation can result in increased costs for the modeling services, schedule delays due to missing information, and little to no added value. - ANSWER True 5) BIM process design clearly illustrates the execution process through the use of process maps. - ANSWER True 6) Which of the following is an influence of BIM on Industry Problems? 7) Select one: a. Clash Detection b. Better Communication c. Better Planning and Management d. All of the above - ANSWER d. All of the above 8) What is the full form of NBIMS? - ANSWER National Building Information Modeling Standards 9) In BIM, it is not just a model, it is __________. - ANSWER a database 3D 5D 7D 6D 10) 4D - ANSWER 3D - Visualization, 5D - Estimating, 7D - Facility Management, 6D - Sustainability, 4D - Scheduling LOD-300 LOD-100 LOD-500 LOD-400 11) LOD-200 - ANSWER LOD-300 - Cost Estimation: Estimated cost based on measurement of specific assembly, LOD-100 - Scheduling: Total Project Construction duration, LOD-500 - Energy Analysis: Commissioning and recording of measured performance, LOD-400 - Milestones: Constructability and Fabrication, LOD-200 - Preliminary Design: Three dimension-generic elements Fabrication Conceptual Design Documentation Analysis Construction 4D/5D Demolition Programming Detailed Design Operation and Maintenance 12) Construction Logistics - ANSWER The correct answer is: Fabrication - 6 Conceptual Design - 2 Documentation - 5, Analysis - 4 Construction 4D/5D - 7 Demolition - 10 Programming - 1 Detailed Design - 3 Operation and Maintenance - 9 Construction Logistics - 8 13) Which among the following BIM benefits scored the highest percentage according to BIM users? - ANSWER Improved Collective Understanding of Design Intent 14) How many uses of BIM have been identified by the BIM Project Execution Planning guide? - ANSWER 25

Show more Read less
Institution
CM 3112
Course
CM 3112

Content preview

CM 3112 Building Information
Modeling EXAM COMPLETE QUESTIONS
WITH CORRECT VERIFIED ANSWERS
UPDATED 2025/2026 VERSION||
ALREADY GRADED SOLUTIONS FOR A
100% GUARANTEED PASS!!!
1) Defining specific implementation areas and uses for BIM is more
important than focusing on whether or not to use BIM in general. -
ANSWER ✓ True

2) BIM can carry some level of additional process risk due to
inexperience and unfamiliarity. - ANSWER ✓ True

3) The goal of the NBIMS-US is to identify and define standard
information exchanges that are required on facility projects. -
ANSWER ✓ True

4) Ineffective planning of BIM implementation can result in increased
costs for the modeling services, schedule delays due to missing
information, and little to no added value. - ANSWER ✓ True

5) BIM process design clearly illustrates the execution process
through the use of process maps. - ANSWER ✓ True

6) Which of the following is an influence of BIM on Industry
Problems?
7) Select one:
a. Clash Detection
b. Better Communication

, c. Better Planning and Management
d. All of the above - ANSWER ✓ d. All of the above

8) What is the full form of NBIMS? - ANSWER ✓ National Building
Information Modeling Standards

9) In BIM, it is not just a model, it is __________. - ANSWER ✓ a
database

3D

5D

7D

6D

10) 4D - ANSWER ✓ 3D - Visualization,
5D - Estimating,
7D - Facility Management,
6D - Sustainability,
4D - Scheduling

LOD-300

LOD-100

LOD-500

LOD-400

11) LOD-200 - ANSWER ✓ LOD-300 - Cost Estimation:
Estimated cost based on measurement of specific assembly,
LOD-100 - Scheduling: Total Project Construction duration,

, LOD-500 - Energy Analysis: Commissioning and recording of measured
performance,
LOD-400 - Milestones: Constructability and Fabrication, LOD-200 -
Preliminary Design: Three dimension-generic elements

Fabrication

Conceptual Design

Documentation

Analysis

Construction 4D/5D

Demolition

Programming

Detailed Design

Operation and Maintenance

12) Construction Logistics - ANSWER ✓ The correct answer is:
Fabrication - 6
Conceptual Design - 2
Documentation - 5, Analysis - 4
Construction 4D/5D - 7
Demolition - 10
Programming - 1
Detailed Design - 3
Operation and Maintenance - 9
Construction Logistics - 8

Written for

Institution
CM 3112
Course
CM 3112

Document information

Uploaded on
July 5, 2025
Number of pages
18
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.29
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SmartscoreAaron Chicago State University
View profile
Follow You need to be logged in order to follow users or courses
Sold
83
Member since
1 year
Number of followers
6
Documents
4146
Last sold
3 days ago
SMARTSCORES LIBRARY

Get top-tier academic support for Psychology, Nursing, Business, Engineering, HRM, Math, and more. Our team of professional tutors delivers high-quality homework, quiz, and exam assistance—ensuring scholarly excellence and grade-boosting results. Trust our collaborative expertise to help you succeed in any course at U.S.A Institutions.

3.1

7 reviews

5
3
4
1
3
0
2
0
1
3

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions