100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

API 653 preparation Questions and Answers correct

Rating
-
Sold
-
Pages
37
Grade
A+
Uploaded on
04-07-2025
Written in
2024/2025

API 653 preparation Questions and Answers correct Owner API 653 1.2 Overall responsibility for compliance with API 653? Engineer API 653 4.3.1.2 Responsibility - evaluate deterioration of existing shell material? Steel storage tanks built to API 650 and its predecessor API 12c (API 653 1.1.1) What does api 653 cover? Minimum requirements for maintaining the integrity of tanks after they have been placed in service and addresses inspection, repair, alteration, relocation and reconstruction (api 653 1.1.1) What does api 653 provide? Tank foundation, bottom shell, structure, roof, attached appurtenances and nozzles to the face of first flange, first threaded joint or first welding-end connection (api 653 1.1.2) What is the scope of api 653 limited to? API 653 shall govern for tanks that have been placed into service (api 653 1.1.2) In the case of conflict between api 653 and api 650 or it's predecessor api 12c. Which shall govern? Rules or guidelines to cover all the varied conditions which may occur in an existing tank api 653 1.1.5 API 653 does not contain? The regulations shall govern, however if api 653 is more stringent then api 653 shall govern (api 653 1.3) If any provision of api 653 presents a direct or implied conflict with any statutory regulations, which would govern? API 2015, 2016 and api 2217a Where can you find guidelines to safeguard personnel, prevention of fires, explosions and property damage Except in areas specifically designated as safe for hot work, a hot work permit shall be obtained before starting any work that can involve a source of ignition What does api 2009 state in relation to hot work? API 2009 appendix B Where can you find brief information on inerting tanks? Fitness for service API RP 579-1 is? ASNT SNT-TC-1A Personnel qualified and certified in NDE? API RP 2201 Safe hot tapping practices in petroleum industries is? For design and construction of large, welded low pressure storage tanks API standard 620 is? Any work on a tank that changes its physical dimensions or configuration Define an alteration in accordance with api 653? Standard that was in effect at the date of the installation of the component The AS built standard is the? The AS built standard only for those repairs or alterations The standard used for repairs or alterations made after original construction is? 1. Organisation of the jurisdiction where tank is operated 2. Inspection organisation of the licensed and registered insurance company 3. Owner/Operator Name 3 authorised inspection organisations An employee of an authorised inspection agency who is qualified and certified to perform inspections under API 653 Define authorised inspector A change from previous operating conditions involving different properties of the stored product such as, specific gravity or corrosivity and/or different service conditions of temperature and/or pressure What is a change in service The total metal loss, divided by the period of time over which the metal loss occurred Define corrosion rate The portion of the tank bottom or plate within 3" of the inside edge of the shell What is the tank critical zone? A formal, complete inspection as supervised by an authorised inspector of all accessible internal tank surfaces Define internal inspection 1. Installing a shell penetration larger than 12" beneath the liquid level 2. Installing a bottom penetration within 12" of the shell 3. Removing and replacing or adding a shell plate, exceeding 12" dimension 4. Removing or replacing annular ring material, exceeding 12" 5. Installing a new bottom 6. Jacking a tank shell What does a major alteration or repair include The legal entity having both control of and/or responsibility for the operation and maintenance of an existing storage tank Define owner/operator Work necessary to maintain or restore a tank to a condition suitable for safe operation Define repair When the results of a tank inspection show that a change has occurred from the original physical condition When shall an evaluation be made to determine a tanks suitability for use 1. Internal corrosion 2. External corrosion 3. Stress levels and allowable stress levels 4. Properties of the stored product such as specific gravity, temperature and corrosivity 5. Design temperature and service location 6. External roof live load, wind and seismic loading 7. Tank foundation, soil and settlement conditions 8. Chemical + mechanical analysis of the tank materials 9. Distortion of the existing tank 10. Operating conditions such as, filling/emptying rates What factors should be considered when evaluating a tanks suitability for use When corroded to an average thickness of less than 0.09 inch in any 100 inch squared When should roof plates be repaired or replaced All the requirements of API 650 Annex M What should be considered before changing the service of a tank to operate above 200 F Storage tank engineer Who shall conduct the evaluation of an existing tank shell? Each case must be treated as a unique situation and a thorough inspection conducted to determine the nature and extent of corrosion What must be done prior to developing a repair procedure for shell corrosion The corroded or damaged areas shall be repaired The allowable liquid level of the tank reduced The tank retired What shall happen if the requirements of API 653 4.3.3 or 4.3.4 can not be satisfied Foundation settlement Over or under pressuring High wind Poor shell fabrication What are the causes of shell distortion Removed Cracks in the shell to bottom weld shall be Tanks of welded construction that operate at elevated temperatures (exceeding 200F but less than 500F) Define operation at elevated temperature 30,000 pounds per inch squared When the minimum specified yield strength of the shell material is not known, what value shall be assumed? 1. The tank shell shall be evaluated in conformance with API 650 annex M not 653 2. The need for a butt welded annular ring shall be determined and/or installed 3. The shell to bottom joint shall be evaluated for fatigue conditions Existing tanks that were not originally designed and constructed to API 650 annex M shall be evaluated for a change of service to elevated temperatures how? Monitoring the settlement behaviour of tanks What is a recognised practice to assess the integrity of tank bottoms Internal pitting Corrosion of weld joints Stresses placed on bottom plates (by roof supports) Underside corrosion Inadequate drainage Uneven settlement Non homogeneous fill under the tank What are the main causes of tank bottom failure When tank bottom integrity is not detectable visually or through inventory reconciliation When are leak detection systems used API 575 Where are tank leak detection systems listed and discussed Magnetic flux leakage (mfl) tools What are commonly used along with U.T thickness measurement tools to examine tank bottoms No Can the treatment of bottom pitting by non welded repairs be used to increase the minimum remaining thickness Settlement, erosion, cracking and concrete deterioration What are the principal causes of tank foundation deterioration During hydrotest or first filling in cold conditions, after a change to lower temperature service or after a repair/alteration When is brittle fracture most likely to occur 60F and above No known brittle fracture tank failures have occurred at shell metal temperatures above The lowest one day mean temperature as shown in api 650 plus 8c What is the lowest design temperature defined as Restrict to liquid level Restrict the minimum metal temperature Change to lower specific gravity product What options exist to establish a revised safe operating envelope for a tank To assure continued tank integrity What is the purpose of tank inspection An authorised inspector Who shall direct inspections other than those defined? Nature of the product Results of checks Corrosion allowance and corrosion rates Jurisdictional requirements Change in service Leak detection systems What factors must be considered to determine inspection intervals for storage tanks The storage facility tank operations and characteristics of the product stored What should personnel performing external tank inspections be knowledgeable of 1 month The interval of external tank monitoring shall not exceed At least every 5 years or RCA/4N years An external inspection by an authorised inspector shall be conducted Owner/operator Who is responsible to ensure competency of personnel performing surveys Ensure the bottom is not leaking Gather thickness data Identify and evaluate settlement Why is inspection primarily required 10 years unless a tank has one or more safeguards as per table 6.1 and shall not exceed 20 years for tanks without RPB or 30 years for tanks with RPB The interval from initial service date until the first internal inspection shall not exceed Risk based inspection What can be used as an alternative to establishing the initial interval for inspection in accordance with API 653 API 653 Annex C Where can you find items for consideration when conducting in-service and out of service inspections All measurements taken Condition of parts inspected Records of all examinations and tests Corrosion rate and inspection intervals Unusual findings and recommendations What may be included as part of the inspection history For the lifetime of the tank For how long must records be maintained Dates of inspection Type of inspection Scope of inspection areas covered Full description of the tank Annex C type checklist Type of tests UT PT Corrosion rates Settlement surveys Recommendations What shall reports include as a minimum Owner/operator Who is responsible to review the inspection findings and carry out any recommendations It shall be subject to chemical analysis and mechanical tests including charpy v notch What should happen to plates for which adequate identification does not exist Checked for excessive corrosion and pitting What should be done if existing plates are to be used to reconstruct the tank It shall be deducted from the actual thickness (taken within 180 days) before calculating the maximum liquid level If corrosion allowance is required for reconstructed tank The authorised inspector or an engineer experienced in storage tank design All tank repairs must be authorised by An engineer experienced in tank design Tank alteration authorised can only be approved by? 12" or 12 times thickness of a replacement shell plate, whichever is greater What is the minimum dimension for a replacement shell plate Prior to welding the horizontal joints Vertical joints shall be welded Only when specified by the owner Are lapped patch shell repairs permitted Risk based inspection What can be used as an alternative to establishing the initial interval for inspection in accordance with API 653 API 653 Annex C Where can you find items for consideration when conducting in-service and out of service inspections All measurements taken Condition of parts inspected Records of all examinations and tests Corrosion rate and inspection intervals Unusual findings and recommendations What may be included as part of the inspection history For the lifetime of the tank For how long must records be maintained Dates of inspection Type of inspection Scope of inspection areas covered Full description of the tank Annex C type checklist Type of tests UT PT Corrosion rates Settlement surveys Recommendations What shall reports include as a minimum Owner/operator Who is responsible to review the inspection findings and carry out any recommendations It shall be subject to chemical analysis and mechanical tests including charpy v notch What should happen to plates for which adequate identification does not exist Checked for excessive corrosion and pitting What should be done if existing plates are to be used to reconstruct the tank It shall be deducted from the actual thickness (taken within 180 days) before calculating the maximum liquid level If corrosion allowance is required for reconstructed tank

Show more Read less
Institution
API 653
Course
API 653











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
API 653
Course
API 653

Document information

Uploaded on
July 4, 2025
Number of pages
37
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

API 653 preparation Questions and Answers
correct

Owner API 653 1.2 - answerOverall responsibility for compliance with API 653?

Engineer API 653 4.3.1.2 - answerResponsibility - evaluate deterioration of existing
shell material?

Steel storage tanks built to API 650 and its predecessor API 12c (API 653 1.1.1) -
answerWhat does api 653 cover?

Minimum requirements for maintaining the integrity of tanks after they have been placed
in service and addresses inspection, repair, alteration, relocation and reconstruction (api
653 1.1.1) - answerWhat does api 653 provide?

Tank foundation, bottom shell, structure, roof, attached appurtenances and nozzles to
the face of first flange, first threaded joint or first welding-end connection (api 653 1.1.2)
- answerWhat is the scope of api 653 limited to?

API 653 shall govern for tanks that have been placed into service (api 653 1.1.2) -
answerIn the case of conflict between api 653 and api 650 or it's predecessor api 12c.
Which shall govern?

Rules or guidelines to cover all the varied conditions which may occur in an existing
tank api 653 1.1.5 - answerAPI 653 does not contain?

The regulations shall govern, however if api 653 is more stringent then api 653 shall
govern (api 653 1.3) - answerIf any provision of api 653 presents a direct or implied
conflict with any statutory regulations, which would govern?

API 2015, 2016 and api 2217a - answerWhere can you find guidelines to safeguard
personnel, prevention of fires, explosions and property damage

Except in areas specifically designated as safe for hot work, a hot work permit shall be
obtained before starting any work that can involve a source of ignition - answerWhat
does api 2009 state in relation to hot work?

API 2009 appendix B - answerWhere can you find brief information on inerting tanks?

Fitness for service - answerAPI RP 579-1 is?

ASNT SNT-TC-1A - answerPersonnel qualified and certified in NDE?

,API RP 2201 - answerSafe hot tapping practices in petroleum industries is?

For design and construction of large, welded low pressure storage tanks - answerAPI
standard 620 is?

Any work on a tank that changes its physical dimensions or configuration -
answerDefine an alteration in accordance with api 653?

Standard that was in effect at the date of the installation of the component - answerThe
AS built standard is the?

The AS built standard only for those repairs or alterations - answerThe standard used
for repairs or alterations made after original construction is?

1. Organisation of the jurisdiction where tank is operated
2. Inspection organisation of the licensed and registered insurance company
3. Owner/Operator - answerName 3 authorised inspection organisations

An employee of an authorised inspection agency who is qualified and certified to
perform inspections under API 653 - answerDefine authorised inspector

A change from previous operating conditions involving different properties of the stored
product such as, specific gravity or corrosivity and/or different service conditions of
temperature and/or pressure - answerWhat is a change in service

The total metal loss, divided by the period of time over which the metal loss occurred -
answerDefine corrosion rate

The portion of the tank bottom or plate within 3" of the inside edge of the shell -
answerWhat is the tank critical zone?

A formal, complete inspection as supervised by an authorised inspector of all accessible
internal tank surfaces - answerDefine internal inspection

1. Installing a shell penetration larger than 12" beneath the liquid level
2. Installing a bottom penetration within 12" of the shell
3. Removing and replacing or adding a shell plate, exceeding 12" dimension
4. Removing or replacing annular ring material, exceeding 12"
5. Installing a new bottom
6. Jacking a tank shell - answerWhat does a major alteration or repair include

The legal entity having both control of and/or responsibility for the operation and
maintenance of an existing storage tank - answerDefine owner/operator

,Work necessary to maintain or restore a tank to a condition suitable for safe operation -
answerDefine repair

When the results of a tank inspection show that a change has occurred from the original
physical condition - answerWhen shall an evaluation be made to determine a tanks
suitability for use

1. Internal corrosion
2. External corrosion
3. Stress levels and allowable stress levels
4. Properties of the stored product such as specific gravity, temperature and corrosivity
5. Design temperature and service location
6. External roof live load, wind and seismic loading
7. Tank foundation, soil and settlement conditions
8. Chemical + mechanical analysis of the tank materials
9. Distortion of the existing tank
10. Operating conditions such as, filling/emptying rates - answerWhat factors should be
considered when evaluating a tanks suitability for use

When corroded to an average thickness of less than 0.09 inch in any 100 inch squared -
answerWhen should roof plates be repaired or replaced

All the requirements of API 650 Annex M - answerWhat should be considered before
changing the service of a tank to operate above 200 F

Storage tank engineer - answerWho shall conduct the evaluation of an existing tank
shell?

Each case must be treated as a unique situation and a thorough inspection conducted
to determine the nature and extent of corrosion - answerWhat must be done prior to
developing a repair procedure for shell corrosion

The corroded or damaged areas shall be repaired
The allowable liquid level of the tank reduced
The tank retired - answerWhat shall happen if the requirements of API 653 4.3.3 or
4.3.4 can not be satisfied

Foundation settlement
Over or under pressuring
High wind
Poor shell fabrication - answerWhat are the causes of shell distortion

Removed - answerCracks in the shell to bottom weld shall be

Tanks of welded construction that operate at elevated temperatures (exceeding 200F
but less than 500F) - answerDefine operation at elevated temperature

, 30,000 pounds per inch squared - answerWhen the minimum specified yield strength of
the shell material is not known, what value shall be assumed?

1. The tank shell shall be evaluated in conformance with API 650 annex M not 653
2. The need for a butt welded annular ring shall be determined and/or installed
3. The shell to bottom joint shall be evaluated for fatigue conditions - answerExisting
tanks that were not originally designed and constructed to API 650 annex M shall be
evaluated for a change of service to elevated temperatures how?

Monitoring the settlement behaviour of tanks - answerWhat is a recognised practice to
assess the integrity of tank bottoms

Internal pitting
Corrosion of weld joints
Stresses placed on bottom plates (by roof supports)
Underside corrosion
Inadequate drainage
Uneven settlement
Non homogeneous fill under the tank - answerWhat are the main causes of tank bottom
failure

When tank bottom integrity is not detectable visually or through inventory reconciliation -
answerWhen are leak detection systems used

API 575 - answerWhere are tank leak detection systems listed and discussed

Magnetic flux leakage (mfl) tools - answerWhat are commonly used along with U.T
thickness measurement tools to examine tank bottoms

No - answerCan the treatment of bottom pitting by non welded repairs be used to
increase the minimum remaining thickness

Settlement, erosion, cracking and concrete deterioration - answerWhat are the principal
causes of tank foundation deterioration

During hydrotest or first filling in cold conditions, after a change to lower temperature
service or after a repair/alteration - answerWhen is brittle fracture most likely to occur

60F and above - answerNo known brittle fracture tank failures have occurred at shell
metal temperatures above

The lowest one day mean temperature as shown in api 650 plus 8c - answerWhat is the
lowest design temperature defined as

Restrict to liquid level

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Pogba119 Harvard University
View profile
Follow You need to be logged in order to follow users or courses
Sold
48
Member since
1 year
Number of followers
2
Documents
4859
Last sold
3 weeks ago
NURSING TEST

BEST EDUCATIONAL RESOURCES FOR STUDENTS

3.9

9 reviews

5
4
4
2
3
2
2
0
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions