100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

API 653 Exam Questions and Answers 100% Pass

Rating
-
Sold
-
Pages
15
Grade
A+
Uploaded on
10-01-2025
Written in
2024/2025

API 653 Exam Questions and Answers 100% Pass what is the minimum thickness for a tank floor plate with no means for leak detection or secondary containment if an RBI program is not in place - 0.1 inch reference table 4.4 API 653 when a full hydrostatic test is required, it shall be held for - 24-hours reference 12.3.1 API 653 how many radiographs shall be taken in a square 2 in x 24 in but welded insert play in a 1-inch thick shell - 6 total one horizontal one vertical one in each corner : reference 12.2.1.6.2 API 653 what is the minimum number of radiographs that shall be taken on a circular but welded insert plate in a shell 1/2 in thick - one : reference 12.2.16 .1 API 653 how much time do you need to keep the radiographs of a reconstructed tank - 1 year reference 13.2.3 API 653 who should conduct visual inspection and review and NDE results? - the authorized inspector EMILY CHARLENE © 2025, ALL RIGHTS RESERVED 2 how much time should the operator keep the cathodic protection records - 5 years minimum diagnostic length of a radiograph is - 6 inches the total metal lost / the period of time over which the metal loss occurred is the - corrosion rate the presence of rock under the steel bottom of an AST would have what effect - promote severe Underside corrosion when do you use thin-film linings - when the tank is new or has light corrosion a formal visual external inspection by an authorized inspector shall be made - at least every five years or RCA / 4N years whichever is less radiographic density shall be check by densitometer calibrated on a step wedge film traceable to - a National Standard a welder deposits more metal than Allowed by the WPS what should be done - re- qualify the welder what is the maximum critical length for plate thickness determination - 40 inches when is it necessary for a hydrostatic test on a reconstructed tank - always

Show more Read less
Institution
Api 653
Course
Api 653









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Api 653
Course
Api 653

Document information

Uploaded on
January 10, 2025
Number of pages
15
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

API 653 Exam Questions and
Answers 100% Pass

what is the minimum thickness for a tank floor plate with no means for leak detection

or secondary containment if an RBI program is not in place - ✔✔0.1 inch reference table

4.4 API 653


when a full hydrostatic test is required, it shall be held for - ✔✔24-hours reference 12.3.1

API 653


how many radiographs shall be taken in a square 2 in x 24 in but welded insert play in a

1-inch thick shell - ✔✔6 total one horizontal one vertical one in each corner : reference

12.2.1.6.2 API 653


what is the minimum number of radiographs that shall be taken on a circular but

welded insert plate in a shell 1/2 in thick - ✔✔one : reference 12.2.16 .1 API 653


how much time do you need to keep the radiographs of a reconstructed tank - ✔✔1

year reference 13.2.3 API 653


who should conduct visual inspection and review and NDE results? - ✔✔the authorized

inspector




EMILY CHARLENE © 2025, ALL RIGHTS RESERVED 1

, how much time should the operator keep the cathodic protection records - ✔✔5 years


minimum diagnostic length of a radiograph is - ✔✔6 inches


the total metal lost / the period of time over which the metal loss occurred is the -

✔✔corrosion rate


the presence of rock under the steel bottom of an AST would have what effect -

✔✔promote severe Underside corrosion


when do you use thin-film linings - ✔✔when the tank is new or has light corrosion


a formal visual external inspection by an authorized inspector shall be made - ✔✔at

least every five years or RCA / 4N years whichever is less


radiographic density shall be check by densitometer calibrated on a step wedge film

traceable to - ✔✔a National Standard


a welder deposits more metal than Allowed by the WPS what should be done - ✔✔re-

qualify the welder


what is the maximum critical length for plate thickness determination - ✔✔40 inches


when is it necessary for a hydrostatic test on a reconstructed tank - ✔✔always


between thin film and thick film Linings which lining is best for crude oil tank that

operates at 190 degrees F - ✔✔thin film


what is the maximum spacing for MT prods - ✔✔8 inches




EMILY CHARLENE © 2025, ALL RIGHTS RESERVED 2

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EmilyCharlene Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
443
Member since
2 year
Number of followers
138
Documents
21009
Last sold
2 days ago
Charlene\'s Scholastic Emporium.

Your Actual and Virtual Exam Tests Excellent Tutor.

3.6

97 reviews

5
45
4
13
3
15
2
7
1
17

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions