Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

NERC RC Exam Prep With 213 Questions and answers Newest 2025/2026

Rating
-
Sold
-
Pages
74
Grade
A+
Uploaded on
30-06-2025
Written in
2024/2025

NERC RC Exam Prep With 213 Questions and answers Newest 2025/2026 NERC RC Exam Prep With 213 Questions and answers Newest 2025/2026 NERC RC Exam Prep With 213 Questions and answers Newest 2025/2026 NERC RC Exam Prep With 213 Questions and answers Newest 2025/2026 NERC RC Exam Prep With 213 Questions and answers Newest 2025/2026 NERC RC Exam Prep With 213 Questions and answers Newest 2025/2026 NERC RC Exam Prep With 213 Questions and answers Newest 2025/2026

Show more Read less
Institution
NERC RC
Course
NERC RC

Content preview

NERC RC Exam Prep With 213 Questions and answers
Newest 2025/2026
When does the Contingency Reserve Restoration Period begin?
Il` Il` Il` Il` Il` Il` Il`




A. At the top of the hour after the Reportable Disturbance
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




B. At the start of the Reportable Disturbance
Il` Il` Il` Il` Il` Il` Il`




C. At the end of the Disturbance Recovery Period
Il` Il` Il` Il` Il` Il` Il` Il`




D. When all Contingency Reserve has been exhausted - Correct Answers C. At the end of the
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




Disturbance Recovery Period
Il` Il` Il`




Il` Which of the following terms is defined as the scan rate values of a Balancing Authority's ACE
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




Il` measured in MW, which includes the difference between the Balancing Authority's Net
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




Il` Interchange Actual and its Net Interchange Scheduled, plus its Frequency Bias obligation, plus any
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




Il` known meter error? Il` Il`




A. Automatic Time Error
Il` Il` Il`




B. Reporting ACE
Il` Il`




C. ACE Control Error
Il` Il` Il`




D. Reserve Sharing Group Reporting - Correct Answers B. Reporting ACE
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




Il` Which of the following terms applies to the Western Interconnection only, and the addition of a
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




Il` component to the ACE equation that modifies the control point for the purpose of continuously
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




Il` paying back Primary Inadvertent Interchange to correct accumulated time error?
Il` Il` Il` Il` Il` Il` Il` Il` Il`




A. Reporting ACE
Il` Il`




B. Automatic Time Error Correction
Il` Il` Il` Il`




C. Reserve Sharing Group Reporting ACE
Il` Il` Il` Il` Il`

,D. Regulation Reserve Sharing Group - Correct Answers B. Automatic Time Error Correction
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




Il` You are a Balancing Authority Operator. A neighboring Balancing Authority in the Interconnection
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




Il` suddenly has a 500 MW generator trip due to a generator ground. What part of the ACE equation,
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




Il` ACE = (NIA-NIS) - 10B (FA-FS) - IME, allows you and other Balancing Authorities in the
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




Il` Interconnection to help stabilize the Interconnection frequency error? Il` Il` Il` Il` Il` Il` Il`




A. (FA- FS) - IME
Il` Il` Il` Il`




B. NIA - NIS
Il` Il` Il`




C. 10B (FA-FS)
Il` Il`




D. 4 IME - Correct Answers C. 10B (FA-FS)
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




Il` Balancing Authority A is scheduled to import a net 200 MW and is actually importing a net 150
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




Il` MW. The Bias Setting is -100 MW/.1 HZ and Actual Frequency is 59.95 Hz. What is Balancing
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




Il` Authority A's ACE reading? Il` Il` Il`




A. +100 MW
Il` Il`




B. -100 MW
Il` Il`




C. 0 MWIl` Il`




D. -55 MW - Correct Answers C. 0 MW
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




Il` Which of the following elements is NOT included in the ACE equations frequency component?
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




A. Actual Frequency (FA)
Il` Il` Il`




B. Scheduled Frequency (FS)
Il` Il` Il`




C. Frequency Bias Setting (B)
Il` Il` Il` Il`




D. Meter Error (IME) - Correct Answers D. Meter Error (IME)
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`

,Il` A Balancing Authority is slightly undergenerating its Actual System Frequency (FA) is 60.03 Hz.
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




Il` What is the result of the Balancing Authority's action?
Il` Il` Il` Il` Il` Il` Il` Il`




A. The Balancing Authority is helping the Interconnection Frequency.
Il` Il` Il` Il` Il` Il` Il` Il`




B. The Balancing Authority is in CPS1 violation.
Il` Il` Il` Il` Il` Il` Il`




C. The Balancing Authority is hurting the Interconnection Frequency.
Il` Il` Il` Il` Il` Il` Il` Il`




D. The Balancing Authority is in BAAL violation - Correct Answers A. The Balancing Authority is
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




helping the Interconnection Frequency
Il` Il` Il` Il`




Il` Which statement best describes the CPS1 requirement?
Il` Il` Il` Il` Il` Il`




A. ACE must follow changes in load and schedule within a bandwidth called L10.
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




B. The Responsible Entity must operate so its CPS1 is greater than or equal to 100% for the
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




preceding 12-month period.
Il` Il` Il`




C. The average ACE for a defined 10-minute period must be within a limit called L10.
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




D. ACE must start to return to zero one minute after crossing zero. - Correct Answers B. The
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




Responsible Entity must operate so its CPS1 is greater than or equal to 100% for the preceding 12-
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




month period Il`




Il` A Balancing Authority's CPS1 calculation is computed using its clock-minute average of two
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




Il` values. What are those two values?
Il` Il` Il` Il` Il`




A. Reporting ACE and Frequency Error
Il` Il` Il` Il` Il`




B. Actual and Scheduled Net Interchange NIA and NIS.
Il` Il` Il` Il` Il` Il` Il` Il`




C. L10 and Reporting ACE
Il` Il` Il` Il`




D. Actual and Scheduled Frequency (FA and FS) - Correct Answers A. Reporting ACE and
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




Frequency Error
Il` Il`

, Il` To conform to CPS requirements, a Balancing Authority must have which of the following?
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




A. CPS1 greater than or equal to 90% or BAAL greater than or equal to 100%.
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




B. CPS1 greater than or equal to 100% and ACE does not exceed BAAL more than 15 consecutive
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




minutes.
Il`




C. CPS1 greater than or equal to 100% and ACE does not exceed BAAL more than 30 consecutive
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




minutes.
Il`




D. CPS1 greater than or equal to 90% and ACE does not exceed BAAL more than 30 consecutive
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




minutes. - Correct Answers C. CPS1 greater than or equal to 100% and ACE does not exceed
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




BAAL more than 30 consecutive minutes.
Il` Il` Il` Il` Il` Il`




Il` What should a Balancing Authority set Scheduled Frequency to for a slow Time Error Correction?
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




A. 60.02 Hz
Il` Il`




B. 59.98 Hz
Il` Il`




C. 59.80 Hz
Il` Il`




D. 60.20 Hz - Correct Answers A. 60.02 Hz
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




Il` Which of the following is a potential source of Contingency Reserve?
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




1. Offline generation that takes 10 minutes to start and ramp to full output
Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il` Il`




2. Online generation at full load
Il` Il` Il` Il` Il`




3. Controllable load resources
Il` Il` Il`




4. Voltage reductions
Il` Il`




A. 3 and 4
Il` Il` Il`




B. 2 and 3
Il` Il` Il`

Written for

Institution
NERC RC
Course
NERC RC

Document information

Uploaded on
June 30, 2025
Number of pages
74
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$10.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Thumbnail
Package deal
NERC RC Exam package deal NEW!!
-
3 2025
$ 13.58 More info

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
STUVANA Phoenix University
View profile
Follow You need to be logged in order to follow users or courses
Sold
189
Member since
1 year
Number of followers
1
Documents
6319
Last sold
1 day ago
STUVATE PRO -USA

Welcome to Stuvana — your cozy corner for stress-free studying and the grades you deserve.

3.9

36 reviews

5
18
4
7
3
6
2
1
1
4

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions