Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 31 pages
Exam (elaborations)

ARE 5.0 MOCK EXAM – PCM 2025 QUESTIONS AND ANSWERS

Document preview thumbnail
Preview 4 out of 31 pages

ARE 5.0 MOCK EXAM – PCM 2025 QUESTIONS AND ANSWERS

Content preview

ARE 5.0 MOCK EXAM – PCM 2025
QUESTIONS AND ANSWERS


An architecture firm is facing a deadline on a large library project and decides to hire a

freelance computer-aided design (CAD) drafter who works from home to assist the firm

in completing the construction documents on time. According to the National Council

of Architectural Registration Boards (NCARB) RULES OF CONDUCT, what must the

architect of record do to sign and seal the final drawings?




A. The architect must redline the drawings and have the drafter make the appropriate

corrections

B. The architect must review and correct the work after it is prepared by the drafter and

incorporate it into the construction documents

C. The architect must thoroughly examine the drawings prepared by the drafter and

incorporate the work into the construction documents. The firm must also retain

documentation of communications with the drafter throughout the drafter's involvement

with the project and must keep records of the arch - ....ANSWER ...-C


Which types of business organization limit an individual's liability to the amount that an

individual has invested in the company? Choose 3.




....FOR STUDY PURPOSES...©️2025 ALL RIGHTS RESERVED... 1

,A. partnership

B. corporation

C. joint venture

D. limited liability company

E. limited liability partnership


F. disadvantaged business enterprise - ....ANSWER ...-B D E


Which of the following are required to prove negligence? Choose 4.




A. agency

B. breach

C. cause

D. commission

E. damage


F. duty - ....ANSWER ...-B C E F


An architect writes a specification for floor tile for a public restroom, which states that

the tile is to be "American Tile Company 12 x 12 porcelain floor tile, Pattern 463 Oceania,

Color 42 Sandstorm or approved equal". The contractor contacts a local tile supplier and

discovers that this product has a 12-weel lead time, but it will be necessary to have the

tile on site earlier to stay within the project schedule. If the contractor wishes to propose

a different tile, when must that request to the architect be submitted?




....FOR STUDY PURPOSES...©️2025 ALL RIGHTS RESERVED... 2

,A. during preparation of submittals

B. prior to submitting a bid

C. after the contract is awarded and an agreement with the tiling subcontractor is signed


D. during the project kick-off meeting - ....ANSWER ...-B


According to the national Council of Architectural Registration Boards (NCARB)

RULES OF CONDUCT, an architect's license or registration could be revoked if :




A. in talking with a potential client, the architect fails to disclose ownership of stock in

the client's chief competitor and that personal financial interest may influence the

architect's judgement

B. in a television interview about a controversial casino project, the architect discloses

that he or she is employed by the resort developer

C. the architect pays for overnight accommodation and a dinner for a potential client so

that the client may visit the architect's firm for a second interview about a large project

D. the architect takes out a half-page advertisement in a local newspaper stating the

firm's credentials and why the firm should be considered for a large development project

in the city - ....ANSWER ...-A


What must architect do to protect their interest in the copyright on the instruments of

service produced for a project and the design of a building?




A. Register the drawings and photographs of the completed building with the U.S.

Copyright Office



....FOR STUDY PURPOSES...©️2025 ALL RIGHTS RESERVED... 3

, B. File a copy of the instruments of service in the Library of Congress

C. Put the copyright symbol and the date on the drawings

D. Neither option A, B, or C are required to project the architect's copyright -

....ANSWER ...-D


"Vinyl composition tile shall be maintained at a minimum of 65 degrees F for 48 hours

prior to installation, during installation, and for 48 hours after completion". In what part

of the project specifications does the contractor find these instructions?




A. Part I, General

B. Part II, Products

C. Part III, Execution


D. Division 01, General Requirements - ....ANSWER ...-C


Which of the following is the best way to modify a standard American Institute of

Architects (AIA) document?




A. Retype the document, incorporating all of the changes

B. Attach supplementary conditions or amendments

C. Strike out portions of the contract by hand or insert handwritten additions.

D. Have an attorney draft a new contract using portions of the language in the AIA

documents applicable to the project - ....ANSWER ...-B


"Claims - made" professional liability insurance policies :


....FOR STUDY PURPOSES...©️2025 ALL RIGHTS RESERVED... 4

Document information

Uploaded on
June 29, 2025
Number of pages
31
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
KatelynWhitman
3.6
(257)
Sold
1229
Followers
485
Items
42526
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions