ISTQB Foundation Level Test
UPDATED ACTUAL Exam
Questions and CORRECT Answers
Save
Terms in this set (194)
,What is the test B
basis? (B is correct. Per the glossary, the
a. The point test basis is "a source to determine
during software expected results to compare with
development the actual result of the system
when testing under test". A is not correct
should start because this is usually defined as
b. The body of the moment of involvement for
knowledge testing. C is not correct because
used for test this is the test oracle. D is not
analysis and correct because the test basis is
design not a method)
c. The source to
determine the
actual results
from a set of
tests
d. The method
used to
systematically
devise test
conditions
,When the tester C
verifies the test (C is correct per the syllabus. The
basis while other three are achieved primarily
designing tests by doing dynamic testing. This is a
early in the bit tricky because you are very
lifecycle, which likely to find defects while doing
common test this analysis and this may lead to
objective is either gaining or destroying
being confidence and needing to supply
achieved? information to the decision makers.
a. Gaining However, the wording of the
confidence question matches the wording in
b. Finding the syllabus that defines
defects preventing defects.)
c. Preventing
defects
d. Providing
information for
decision making
, When following D
the (D is correct. Control occurs
fundamental throughout the
test process, project to ensure that it is staying
when should on track based
the test control on the plan and to take any
activity take corrective steps that
place? may be necessary. The monitoring
a. During the information is
planning used to determine if control
activities actions are needed.)
b. During the
implementation
and execution
activities
c. During the
monitoring
activities
d. During all the
activities
UPDATED ACTUAL Exam
Questions and CORRECT Answers
Save
Terms in this set (194)
,What is the test B
basis? (B is correct. Per the glossary, the
a. The point test basis is "a source to determine
during software expected results to compare with
development the actual result of the system
when testing under test". A is not correct
should start because this is usually defined as
b. The body of the moment of involvement for
knowledge testing. C is not correct because
used for test this is the test oracle. D is not
analysis and correct because the test basis is
design not a method)
c. The source to
determine the
actual results
from a set of
tests
d. The method
used to
systematically
devise test
conditions
,When the tester C
verifies the test (C is correct per the syllabus. The
basis while other three are achieved primarily
designing tests by doing dynamic testing. This is a
early in the bit tricky because you are very
lifecycle, which likely to find defects while doing
common test this analysis and this may lead to
objective is either gaining or destroying
being confidence and needing to supply
achieved? information to the decision makers.
a. Gaining However, the wording of the
confidence question matches the wording in
b. Finding the syllabus that defines
defects preventing defects.)
c. Preventing
defects
d. Providing
information for
decision making
, When following D
the (D is correct. Control occurs
fundamental throughout the
test process, project to ensure that it is staying
when should on track based
the test control on the plan and to take any
activity take corrective steps that
place? may be necessary. The monitoring
a. During the information is
planning used to determine if control
activities actions are needed.)
b. During the
implementation
and execution
activities
c. During the
monitoring
activities
d. During all the
activities