Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 1 out of 3 pages
Exam (elaborations)

WGU C215 Study Guide – FINAL Latest 2025

Document preview thumbnail
Preview 1 out of 3 pages

Total Quality Management (TQM) Philosophy - 1. customer focus 2. continuous improvement 3. employee empowerment 4. use of quality tools 5. product design 6. process management 7. managing supplier quality Process Capability Index (Cpk) - Basic function of Six Sigma. Measures the process potential and performance of processes. The higher the range of Cpk, the improved is the ability of the process to complete its necessities. Uses both the process variability and the process specifications to determine whether the process is "capable." Six Sigma - A disciplined, data-driven approach and methodology for eliminating defects (driving toward six standard deviations between the mean and the nearest specification limit) in any process - from manufacturing to transactional and from product to service. Design Capacity - The theoretical maximum output of a system in a given period under ideal conditions. Effective Capacity - The capacity a firm expects to achieve given its current operating constraints. Location Analysis - proximity to customers, transportation, source of labor, community attitude, proximity to suppliers, and many other factors. Line Processes - A type of process used to produce a large volume of a standardized product. Batch Processes - A type of process used to produce a small quantity of products in groups or batches based on customer orders or specifications. Project Processes - A type of process used to make a one-at-a-time product exactly to customer specifications. Continuous Processes - A type of process that operates continually to produce a high volume of a fully standardized product. Bottleneck - Longest task in the process. Flexible Manufacturing System (FMS) - A type of automated system that combines the flexibility of intermittent operations with the efficiency of continuous operations. Output/Input Control - A technique for monitoring the flow of jobs between work centers. Value-Added - The net increase created during the transformation of inputs into final outputs. Hybrid Layouts - Layouts that combine characteristics of process and product layouts. Relationship Chart (REL) - Table that reflects opinions of managers with regard to the importance of having any two departments close together. Rectilinear Distance - The shortest distance between two locations using north-south and east-west movements. From-To Matrix - Table that gives the number of trips or units of product moved between any pair of departments. Block Plan - Schematic showing the placement of resources in a facility. Mean Observed Times - The average of the observation times for each of the work elements. Normal Time - The mean observed time multiplied by the performance rating factor by the frequency of occurrence. Standard Time - The length of time it should take a qualified worker using appropriate process and tools to complete a specific job, allowing time for personal fatigue and unavoidable delays. Just-in-Time (JIT) - A philosophy designed to achieve high-volume production through elimination of waste and continuous improvement. Based on a "pull" system rather than a "push" system. The three elements are just-in-time manufacturing, total quality management, and respect for people. Kanban card - A card that specifies the exact quantity of product that needs to be produced. Continuous Improvement - A philosophy of neverending improvement. Tier One Suppliers - Supplies materials or services directly to the processing facility. Tier Two Suppliers - Directly supplies materials or services to a tier one supplier in the supply chain. Tier Three Suppliers - Directly supplies materials or services to a tier two supplier in the supply chain. Supply Chain Management (SCM) - Management of the flow of materials from suppliers to customers in order to reduce overall cost and increase responsiveness to customers. Capacity Requirements Planning (CRP) - Determines the labor and machine resources needed to fill the open and planned orders generated by the MRP. Material Requirements Planning (MRP) - A system that uses the MRP, inventory record data, and BOM to calculate material requirements. Enterprise Resource Planning (ERP) - Large software programs used for planning and coordinating all resources throughout the entire enterprise. Aggregate Plans - Includes the budgeted levels of finished products, inventory, backlogs, workforce size, and aggregate production rate needed to support the marketing plan. Third-Party Logistics (3PL) - Businesses used to outsource elements of the company's distribution and fulfillment services. They typically specialize in integrated operation, warehousing and transportation services which can be scaled and customized to customers' needs based on market conditions, such as the demands and delivery service requirements for their products and materials. Supply Chain Operations Reference model (SCOR) - the world's leading supply chain framework, linking business processes, performance metrics, practices and people skills into a unified structure. The goals are to increase the speed of system implementations, support organizational learning goals, and improve inventory turns. Project Life Cycle Phases - Initiation, Planning, Execution and Closure. Master Production Schedule (MPS) - A plan for individual commodities to be produced in each time period such as production, staffing, inventory, etc. It is usually linked to manufacturing where the plan indicates when and how much of each product will be demanded. It gives production, planning, purchasing, and top management the information needed to plan and control the manufacturing operation. Total Quality Management (TQM) - The meaning of quality as defined by the customer.


Document information

Uploaded on
June 25, 2025
Number of pages
3
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Terry75
4.5
(14)
Sold
78
Followers
1
Items
1408
Last sold
1 month ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.