Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 14 pages
Exam (elaborations)

PJM EXAM QUESTIONS WITH COMPLETE SOLUTIONS

Document preview thumbnail
Preview 2 out of 14 pages

PJM EXAM QUESTIONS WITH COMPLETE SOLUTIONSDuring reactive testing, which entity must give approval to change an approved voltage schedule? PJM, TOP, MOC, GO - ANSWER-TO Generation available within 10 minutes for offline reserve units: Quick-start (hydro), manual, operating, supplemental - ANSWER-Quick-start (hydro) Minimum MVARs for an individual generator that is required to do reactive testing? - ANSWER-20 MVA Minimum MVARs for an aggregate of generators that is required to do reactive testing? - ANSWER-75 MVA Power transformer is connected to the generator with which line? - ANSWER-Primary In a balancing authority region, If a site trips offline, what increases? - ANSWER-positive time error How many hours before NERCs 24hour deadline ends must you report disturbance to PJM? - ANSWER-6 hrs How does PJM avoid dealing with economic issues during transmission related constraints - ANSWERcost (offer) capping generation If a generator doesn't have ICCP, what does it have to be linked through so data is available? - ANSWERSCADA (through EMS) Which balancing control mode is used by PJM under normal operations? - ANSWER-Tie line bias Page 2 of 14 the purpose for balancing area to have AR (area regulator) is to correct for: - ANSWER-small deviations in load what esuite tool is used to maintain individual generator regulation data that is submitted by PJM members? - ANSWER-eMarket cold weather alert is for what temp? - ANSWER-10F what are the three types of transmission constraint that PJM monitors? - ANSWER-Reactive, Stability, Thermal (transfer limits) which would be the last step PJM would take in attempting to relieve a transmission constraint? - ANSWER-shed load Load in PJM is generally served using ___ transmission service. - ANSWER-Network Integration If you were going to import, export, or wheel power through PJM, you would use ____ transmission services? - ANSWER-point-to-point? what is an example of a quick start reserve? - ANSWER-Hydroelectric In order to lower system voltage, ___ must decrease to decrease _____ - ANSWER-MW, MVAR what is PJM's reg requirement during a system restoration? - ANSWER-2% of current load During restoration conditions, what amount of load must be shed in order to increase frequency by 1.0Hz - ANSWER-6-10% During restoration conditions, what percentage of load must be shed in order to alter frequency by 1% Hz? - ANSWER-1-2% of load to alter frequency by 1% Page 3 of 14 What is the approx. MVAR per mile of 500kV transmission that should be anticipated? - ANSWER-1.70 MVAR per mile Frequency during restoration process should be: - ANSWER-59.75-61Hz A system will blackout at what frequency? - ANSWER-57.5 Hz or lower What is the criteria for PJM to issue a Min Gen Alert? - ANSWER-Within 2500 MW of normal eco min limits Based on a generator capability curve, in order to maximize the MVAR output of the generator, it may be necessary to: - ANSWER-decrease MW output It would be an acceptable action for PJM to request of a generator during periods of heavy flows (load) and low voltages to lower real-time power output to ... - ANSWER-increase reactive power lowering the generator's current and increasing the voltage will also increase: - ANSWER-MVARs (reactive power)

Content preview

PJM EXAM QUESTIONS WITH
COMPLETE SOLUTIONS
During reactive testing, which entity must give approval to change an approved voltage schedule?

PJM, TOP, MOC, GO - ANSWER-TO



Generation available within 10 minutes for offline reserve units:

Quick-start (hydro), manual, operating, supplemental - ANSWER-Quick-start (hydro)



Minimum MVARs for an individual generator that is required to do reactive testing? - ANSWER-20 MVA



Minimum MVARs for an aggregate of generators that is required to do reactive testing? - ANSWER-75
MVA



Power transformer is connected to the generator with which line? - ANSWER-Primary



In a balancing authority region, If a site trips offline, what increases? - ANSWER-positive time error



How many hours before NERCs 24hour deadline ends must you report disturbance to PJM? - ANSWER-6
hrs



How does PJM avoid dealing with economic issues during transmission related constraints - ANSWER-
cost (offer) capping generation



If a generator doesn't have ICCP, what does it have to be linked through so data is available? - ANSWER-
SCADA (through EMS)



Which balancing control mode is used by PJM under normal operations? - ANSWER-Tie line bias




Page 1 of 14

, the purpose for balancing area to have AR (area regulator) is to correct for: - ANSWER-small deviations
in load



what esuite tool is used to maintain individual generator regulation data that is submitted by PJM
members? - ANSWER-eMarket



cold weather alert is for what temp? - ANSWER-10F



what are the three types of transmission constraint that PJM monitors? - ANSWER-Reactive, Stability,
Thermal (transfer limits)



which would be the last step PJM would take in attempting to relieve a transmission constraint? -
ANSWER-shed load



Load in PJM is generally served using ___ transmission service. - ANSWER-Network Integration



If you were going to import, export, or wheel power through PJM, you would use ____ transmission
services? - ANSWER-point-to-point?



what is an example of a quick start reserve? - ANSWER-Hydroelectric



In order to lower system voltage, ___ must decrease to decrease _____ - ANSWER-MW, MVAR



what is PJM's reg requirement during a system restoration? - ANSWER-2% of current load



During restoration conditions, what amount of load must be shed in order to increase frequency by
1.0Hz - ANSWER-6-10%



During restoration conditions, what percentage of load must be shed in order to alter frequency by 1%
Hz? - ANSWER-1-2% of load to alter frequency by 1%




Page 2 of 14

Document information

Uploaded on
June 24, 2025
Number of pages
14
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$19.79

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Onlystudents
3.9
(19)
Sold
111
Followers
86
Items
1356
Last sold
2 months ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions