PJM GENERATION CERT QUESTIONS & ANSWERS

Institution
PJM
Course
PJM










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
PJM
Course
PJM

Document information

Uploaded on
June 24, 2025
Number of pages
16
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

PJM GENERATION CERT QUESTIONS & ANSWERS
Actions in low voltage alert? - Answers -Review transmission & generation outages
Request reactive reserve check

Heavy load voltage schedule warning purpose is to have members prepare far max
support of voltages on the? - Answers -Bulk Power System

Manual load dump warning & reduction of Non-critical plant load issued when? -
Answers -Primary reserve is less the the largest generating unit.
Loss of transmission facility jeopardize reliability after all possible measures have been
taken to increase reserves

Hot weather alert - Answers -COMED 90
DOM & EKPC 95

PJM issues high system voltage message - Answers -Gen operators should operate
the lower end of their voltage bandwidth

Primary reserve warning - Answers -Ensure deffer able Maintenance is halted

General actions PJM takes when conservating ops initiated? - Answers -
Purchase/load additional reserves
begin studying double contingencies
Lower IROL
Increase # of SOS calls

Purpose of heavy voltage schedule action is to increase reactive reserves - Answers -
EHV system

National terrorism advisory system 2 types of alerts? - Answers -Elevated threat
Imminent threat

Non-critical plant load - Answers -lighting, office area a/c

Purpose of capacity emergency warning? - Answers -keep members informed of
actual capacity shortages or contingencies that may jeopardize reliability during RT ops

keep all affected system personnel aware of the forecast and actual status of the PJM
RTO

Heavy load voltage schedule action - Answers -Gen operators- maintain MVAR
reserve on units connected to EHV

During cold weather action - Answers -Assume an unavailability rate for scheduled
generation

,During terrorism/sabotage emphasis on? - Answers -Operations & communications

For voltage support TOs can request? - Answers -Generators stay online

During Restoration what is removed from service until sufficient load restored to
maintain voltage - Answers -Shunt capacitors

Freq change=(load change/connected capacity)X Gov droop in percentage - Answers -

LMP calculated day ahead market - Answers -Every hour
RT every 5mins

Penalty factor - - Answers -incremental loss for a bus used to include the effect of
losses on the dispatch

All call types - Answers -Operational, Emergency Messages, Informational

Voltage reduction Alert- - Answers -Est. operating reserve capacity is less than
forecasted synchronized reserve equipment

Generation owners - Answers -Must handle environmental Alerts

Emergency requires action to? - Answers -Maintain freq prevent load loss, ensure
safety and reliability

Alerts - Answers -Advance of operating day

Warning & actions - Answers -During that day

Emergency situation - Answers -Implement procedures within 30min

STE- Short term emergency rating - Answers -

Low voltage alerts - Answers -Analyze reactive capabilities
Reactive reserve check

Heavy load voltage schedule warning - Answers -4 hrs prior

Heavy load voltage schedule action - Answers -500kv (UHV system) support- EHV
Place caps online
Reactors removed
AVR online

High system voltage - Answers -caps out/reactors in

, Manual load dump&reduction of non-critical load - Answers -issued when available
primary reserve capacity less than largest Gen or Trans

For voltage support PJM can request generator adjustments - Answers -Direct
adversely affect MW%
Generator to come online for voltage support
Remain online when scheduled to come offline

Unit startup notification Alert - Answers -Place Gen units ready to be started in 48hrs

Voltage reduction - Answers -2.5%-5%

Min Gen Alert implemented when - Answers -The expected gen level is within 2500mw
of normal min energy limits include
Adjusted min generation, valley & load est, margin values

Min Gen Value - Answers -Economic Min- Emergency Min= ERG
ERG- emergency reducible generation

Temperature for cold weather Alert - Answers -10 degress

During suspected terrorism - Answers -emphasis on operation and communication

NOAA issues alert at - Answers -K-5 or higher

Voltage reduction Warning - Answers -Available synchronized reserves is less than
synchronized reserve requirement

Contact who for suspected terrorism - Answers -PJM shift supervisor

Cold weather alert - Answers -PJM assumes certain unavailability rates for generation
amount

Regulation - Answers -Energy under automatic control that can respond within 5 Min
and to freq changes
Correct for small load changes

Synchronized reserves - Answers -generators respond within 10 min
increase output from generator
reduction in load from a resource
max output energy of synchronous condensor

Operating Reserves - Answers -Primary reserve T< or = 10min
Synchronized & quick start reserve
Supplemental reserve 10<T< or = 30min

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA YALA UNIVERSITY
View profile
Follow You need to be logged in order to follow users or courses
Sold
2009
Member since
3 year
Number of followers
1447
Documents
48320
Last sold
1 day ago

3.8

345 reviews

5
172
4
61
3
44
2
16
1
52

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions