100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

ACI TEST QUESTIONS WITH CORRECT ANSWERS 2025/2026

Rating
-
Sold
-
Pages
9
Grade
A+
Uploaded on
10-09-2025
Written in
2025/2026

ACI TEST QUESTIONS WITH CORRECT ANSWERS 2025/2026

Institution
ACI TE
Course
ACI TE









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ACI TE
Course
ACI TE

Document information

Uploaded on
September 10, 2025
Number of pages
9
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

ACI TEST QUESTIONS WITH CORRECT
ANSWERS 2025/2026
The total time allowed between obtaining the first and final portions of a composite sample is -
CORRECT ANSWER -15 minutes



When it is necessary to wet sieve the concrete sample, wet sieving should be performed after
the individual samples are remixed into a composite sample (T or F) - CORRECT ANSWER -F



Tests for slump, temperature, and air content must begin within minutes after obtaining
the composite sample - CORRECT ANSWER -5 minutes



Begin molding test specimens within minutes after obtaining the composite sample -
CORRECT ANSWER -15 minutes



The concrete samples should be protected from - CORRECT ANSWER -the sun, wind, and other
sources of rapid evaporation, from contamination



When test specimens are to be molded, the minimum size of sample obtained is - CORRECT
ANSWER -28 L (1 ft^3)



The primary objective of the sampling process is to obtain a representative sample (T or F) -
CORRECT ANSWER -T



When sampling from a revolving drum truck mixer collect concrete from portions of the
batch - CORRECT ANSWER -2 or more



Wet sieving is performed - CORRECT ANSWER -when the concrete contains aggregates larger
than appropriate for a test

, When sampling from a paving mixer it is not acceptable to place 3 small containers on the sub
grade in order to obtain the required samples of concrete (T or F) - CORRECT ANSWER -F



TEMPERATURE - CORRECT ANSWER -



it may require up to min before the temp stabilizes when the NMS of the coarse agg is
greater than - CORRECT ANSWER -20min., 3in.



The container for the concrete shall be large enough to provide at least inches, or of
coarse agg, of concrete in all directions around the TMD - CORRECT ANSWER -3in., 3 x NMS



The temperature measuring device shall have the capability of measuring the temperature of
the freshly mixed concrete to ± oF accuracy and have a

range of to ______ oF. - CORRECT ANSWER -1,30to120



A composite sample of concrete is not required even if the only purpose for obtaining the
sample is to determine temperature. T or F - CORRECT ANSWER -T



The Temperature Measuring Device used for determining concrete temperature must be
calibrated or whenever there is a question of accuracy. - CORRECT ANSWER -annually



The temperature of freshly mixed concrete can be measured in - CORRECT ANSWER -all of the
above



Submerge the sensing portion of the thermometer at least inches into the concrete -
CORRECT ANSWER -3
$12.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
TestBanktutor01
3.0
(1)

Get to know the seller

Seller avatar
TestBanktutor01 Chamberlian School of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
7
Member since
8 months
Number of followers
0
Documents
925
Last sold
3 hours ago

3.0

1 reviews

5
0
4
0
3
1
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions