Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

EROSION AND SEDIMENT CONTROL EXAM|| 77 QUESTIONS AND ANSWERS 100% CORRECT

Rating
-
Sold
-
Pages
16
Grade
A
Uploaded on
24-06-2025
Written in
2024/2025

EROSION AND SEDIMENT CONTROL EXAM|| 77 QUESTIONS AND ANSWERS 100% CORRECTEROSION AND SEDIMENT CONTROL EXAM|| 77 QUESTIONS AND ANSWERS 100% CORRECTEROSION AND SEDIMENT CONTROL EXAM|| 77 QUESTIONS AND ANSWERS 100% CORRECTMinimum Standard 1 - ANSWER-Stabilization permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain dormant for longer than 14 days; permanent stabilization shall be applied to areas that are to be left dormant for more than one year Site NOT at Final Grade - ANSWER-- stabilize in 14 days - temporarily seed - mulch - permanently stabilize if dormant 1 year Site at Final Grade - ANSWER-- stabilize in 7 days (recommended immediately) - permanently or temporarily seed and mulch - mulch/matting/straw Minimum Standard 2 - ANSWER-Stock Piles, Waste and Borrow Areas during construction, soil stock piles and borrow areas shall be stabilized or protected with sediment trapping measures

Show more Read less
Institution
Erosion And Sediment Control Inspector
Course
Erosion and sediment control inspector

Content preview

EROSION AND SEDIMENT CONTROL
EXAM|| 77 QUESTIONS AND ANSWERS
100% CORRECT
Minimum Standard 1 - ANSWER-Stabilization

permanent or temporary soil stabilization shall be applied to denuded areas within
seven days after final grade is reached on any portion of the site; temporary soil
stabilization shall be applied within seven days to denuded areas that may not be at
final grade but will remain dormant for longer than 14 days; permanent stabilization shall
be applied to areas that are to be left dormant for more than one year

Site NOT at Final Grade - ANSWER-- stabilize in 14 days
- temporarily seed
- mulch
- permanently stabilize if dormant > 1 year

Site at Final Grade - ANSWER-- stabilize in 7 days (recommended immediately)
- permanently or temporarily seed and mulch
- mulch/matting/straw

Minimum Standard 2 - ANSWER-Stock Piles, Waste and Borrow Areas

during construction, soil stock piles and borrow areas shall be stabilized or protected
with sediment trapping measures

mulch prevents erosion by protecting the surface from raindrop impact and silt fence
intercepts and detains from disturbed areas

Minimum Standard 7 - ANSWER-Cut and Fill Slopes

roughening the surface of the slope decreases runoff, lowers the velocity runoff,
increases water retention, and leads to better seed germination

slopes that are found to be eroding excessively within on year of permanent stabilization
shall be provided with additional slop stabilizing measures until the problem is corrected

Minimum Standard 8 - ANSWER-Concentrated Runoff

shall not flow down cut or fill slopes unless contained within an adequate temporary or
permanent channel, flume or slope drain structure

,outlets of these drains need outlet protection to prevent erosion from the concentrated
flow

size of pipe depends on drainage area

temporarily conduct concentrated stormwater runoff safely down the face of a cut or fill
slope without causing erosion on or below the slope

Minimum Standard 9 - ANSWER-Water Seeps

whenever water seeps from a slope face, adequate drainage or other protection shall be
provided

cut and fill operations may expose shallow aquifers or groundwater tables from which
water may seep through the side of a slope

Minimum Standard 3 - ANSWER-Permanent Vegetation

permanent vegetation cover shall be established on denuded areas not otherwise
permanently stabilized (permanent vegetation shall not be considered established until
a ground cover is achieved that is uniform, mature enough to survive, and will inhibit
erosion *there is no % associated with this*)

reduce erosion and decrease sediment yield from disturbed area

this is the standard used to verify that a site is ready for release of bonds or surety

Minimum Standard 4 - ANSWER-First-Step Measures

Sediment basins and traps, perimeter dikes, sediment barriers and other measures
intended to trap sediment shall be constructed as a first step in any land-disturbing
activity and shall be made functional before upslope land disturbance takes place

a certain amount of initial land disturbance may be required to provide access for
equipment to install the perimeter controls, but site clearing and grading should be kept
to a minimum until the perimeter controls are in place

intercepts and detains small amounts of sediment from disturbed areas during
construction operation to prevent sediment from leaving the site and decrease velocity
of sheet flows and low-to-moderate level channel flow

Perimeter Controls - ANSWER-assures that sediment does not leave the perimeter of
the land-disturbing area once site clearing, grading, and construction commences

Examples: silt fences, sediment traps, sediment basins, construction entrance,
temporary diversions, diversions

, Minimum Standard 5 - ANSWER-Earthen Structure Stabilization

stabilization measures shall be applied to earthen structures such as dams, dikes, and
diversions immediately after installation

reduce erosion and sedimentation and reduce damage from sediment and runoff to
downstream or off-site areas

Minimum Standard 6 - ANSWER-Traps and Basins

sediment traps and basins shall be designed and constructed based upon the total
drainage area (not just disturbed area) to be served by the trap or basin

Sediment Traps - ANSWER-minimum storage capacity shall be 134 cubic yards per
acre of drainage area and shall only control drainage areas less than 3 acres

*stone outlet = trap*

Sediment Basins - ANSWER-surface runoff from disturbed areas that is comprised of
flow from drainage areas greater than or equal to 3 acres shall be controlled by a basin;
minimum storage capacity of a sediment basin shall be 134 cubic yards per acre of
drainage area; the outfall system shall, at a minimum, maintain the structural integrity of
the basin during a 25-year storm of 24-hour duration; runoff coefficients used in runoff
calculations shall correspond to a bare earth condition or those conditions expected to
exist while the sediment basin is utilized.

Sediment Trapping Devises - ANSWER-1. place near the lowest drainage points of a
project

2. install as a first-step measure [MS-4]

3. stabilize immediately [MS-5]

4. must include outlet protection for basins [MS-11]

Minimum Standard 10 - ANSWER-Inlet Protection

all storm sewer inlets that are made operable during construction shall be protected so
that sediment-laden water cannot enter the conveyance system without first being
filtered or otherwise treated to remove sediment

storm sewers are designed to efficiently transport stormwater away from the site, so
when sediment enters the storm sewer system, two negative effects can occur:
1. when velocity of flow is high, much of the sediment will be quickly transported to the
nearest receiving channel

Written for

Institution
Erosion and sediment control inspector
Course
Erosion and sediment control inspector

Document information

Uploaded on
June 24, 2025
Number of pages
16
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$19.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Thumbnail
Package deal
CEPSCI CERTIFICATION (CERTIFIED EROSION PREVENTION AND SEDIMENT CONTROL INSPECTOR) EXAM PACKAGE DEAL (BUNDLE) WITH COMPLETE SOLUTIONS!!
-
15 2025
$ 50.99 More info

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NursingTutor1 West Virginia University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1697
Member since
3 year
Number of followers
1073
Documents
18441
Last sold
6 days ago
Nursing Tutor

Paper Due? Worry not. Hello. Welcome to NursingTutor. Here you\'ll find verified study materials for your assignments, exams and general school work. All papers here are graded A to help you get the best grade. Also, I am a friendly person so, do not hesitate to send a message in case you have a query. I wish you Luck.

3.9

459 reviews

5
217
4
79
3
92
2
21
1
50

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions